{
    "componentChunkName": "component---src-gatsby-entities-topic-tsx",
    "path": "/topics/renewable-energy-adoption-1",
    "result": {"data":{"platform":{"topic":{"id":"65d2eddfebf7bb9388ffb1fd","name":"Renewable Energy Adoption","slug":"renewable-energy-adoption-1","typeLabel":"Topic","badge":null,"path":"/topics/renewable-energy-adoption-1","updated":"2024-12-18T22:51:16.31","__typename":"Platform_Topic","_schema":{"label":"Topic","pluralLabel":"Topics"},"openGraph":{"id":"openGraph_topic/renewable-energy-adoption-1","title":"Renewable Energy Adoption","description":{"plain":"Material movement at copper mining sites requires significant energy. For sites connected to the grid, Purchase Power Agreements (PPAs) can be contracted to different generators with diverse emissions levels, including zero emission electricity. Site-adjacent, but off-grid third party PPAs are also an option. Purchased power emissions are classified as Scope 2.\n","text":"Material movement at copper mining sites requires significant energy. For sites connected to the grid, Purchase Power Agreements (PPAs) can be contracted to different generators with diverse emissions levels, including zero emission electricity. Site-adjacent, but off-grid third party PPAs are also an option. Purchased power emissions are classified as Scope 2."},"image":{"id":"image_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","url":"https://res.cloudinary.com/shapeable/image/upload/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp","url2x":null,"thumbnails":{"id":"thumbnails-file_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","bubbleLarge":{"id":"thumbnails-bubble-large-file_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_128/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_256/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp"},"mainBanner":{"id":"thumbnails-main-banner-file_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_1440/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_2880/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp"},"halfBanner":{"id":"thumbnails-half-banner-file_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_780/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_1560/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp"}}}},"entityType":{"useAi":null},"entityViews":[],"gptName":null,"outlineNumber":"8.3","color":{"__typename":"Platform_Color","id":"65d2ed7febf7bb9388ffab32","slug":"core-4","name":"Core 4","value":"#CD7D4B","darkValue":"#9e5e38","veryDarkValue":"#6e4025"},"trend":{"id":"65d2ede1ebf7bb9388ffb20b","slug":"energy","name":"Energy","__typename":"Platform_Trend","path":"/value-chain/energy","outlineNumber":"8","color":{"id":"65d2ed7febf7bb9388ffab32","name":"Core 4","slug":"core-4","value":"#CD7D4B"}},"intro":{"id":"65d2eddfebf7bb9388ffb1fd_intro","text":"Material movement at copper mining sites requires significant energy. For sites connected to the grid, Purchase Power Agreements (PPAs) can be contracted to different generators with diverse emissions levels, including zero emission electricity. Site-adjacent, but off-grid third party PPAs are also an option. Purchased power emissions are classified as Scope 2."},"description":{"id":"65d2eddfebf7bb9388ffb1fd_description","text":"If a grid connection is not available, power is typically generated from diesel, and vehicles traditionally have been powered by fossil fuels. These are Scope 1 emissions. Deep electrification will require at-site generation, near-site generation plus transmission to site, or grid connection to a reliable power supply.\n\nThis section reviews the current state of at-site renewable energy. A brief profile is provided on zero carbon small modular nuclear reactors, an emerging technology that will be applied at one copper mine site planned for 2029.\n\n## Review approach\n\nThe approach chosen was to undertake a literature survey of available peer-reviewed, published literature on the application of renewable energy at mine sites.\n\nThat data is supplemented with information from this project’s Technical Management Committee members and from invited expert interviews.\n\nThis review presents several separate clusters of adoption studies across the globe, in broad mining (any mineral) or copper-specific mining. A range of different geographies is considered. The review includes some major national research laboratories, major universities, and some supporting industrial and METS-authored peer reviewed papers. Greater attention has been applied to technologies applicable to Australia.\n\nAt first glance, this literature review indicates an increasing ambition by several companies who have begun a journey towards zero emissions.\n\n## Presentation order\n\nFive main papers are summarised in this chapter to give an overview of the industry’s adoption of renewable energy at mine sites. These studies are literature reviews themselves.\n\n​\t1. NREL survey (2021) – global scope, all minerals, USA National Renewable Energy Laboratory plus researchers from the Missouri School of Mines and the Colorado School of Mines. This section is supplemented with a few USA copper RE cases to give an American view of domestic and international adoption of RE at mine sites.\n\n​\t2. Australian renewable energy practices (2022) – This review covers Australian mining, all minerals, from the Queensland University of Technology Business School. Tables of Australian mining RE data are provided.\n\n​\t3. European Union / UK researchers (2021) – This academic engineering desktop review analyses five small mining locations considering deployment of 150 kW hybrid renewable energy units. A Spanish copper solar PV deployment supplements the small hybrid review.\n\n​\t4. Chile (2021) – The Solar Energy Research Center (SERC-Chile) reviews include copper sites with a number of solar PV and CSP units. Through several recent papers, SERC reviews technical performance and calculates basic economic performance statistics. Tables of Chilean mining RE data are provided.\n\n​\t5. John Marsden (2021) paper: Marsden is a US-based METS consultant. In a 2008 paper, Marsden presented energy use statistics at several hydrometallurgy copper production sites. The present paper uses that 2008 data to propose a future 90 percent renewables concept for solar PV. A further paper by Haas is introduced to show the industry trend towards adopting a Zero Emission Copper Mine of the Future approach for future energy supply.\n\n## NREL USA survey\n\nThe mission of the US National Renewable Energy Laboratory (“NREL”) is “to advance the science and engineering of energy efficiency, sustainable transportation, and renewable power technologies and provide the knowledge to integrate and optimize energy systems.”[1](/citation/MM-99) NREL is operated by the US Department of Energy. T. Igogo and colleagues reviewed challenges, opportunities and approaches to adopt renewable energy at mine sites.[2](/citation/MM-100)\n\nGlobally in 2015, there were 600 MW of mine site renewable energy projects, and just four years later in 2019, this rose to over 5,000 MW cumulative. The capacity investment in 2019 was triple that in 2018 or any previous single year. With falling solar module prices, photovoltaics overtook wind in 2016, but hybrid systems dominated 2019, especially solar plus battery storage or solar incorporating renewable biofuel systems.\n\nIgogo et al. note the difficulties of around the clock mining power demand and the differences between off-grid and grid-connected mine sites. They note that mining consumes 38 percent of industrial energy use and 15 percent of all global electricity. Due to low grades and other factors highlighted in this report, Igogo and co-workers highlight that copper mining creates significant carbon dioxide emissions. The report summarises copper GHG emissions per tonne metal and gross energy requirements per tonne for smelted and heap leached copper sulphide ores at various grades alongside statistics for other industrial metals.\n\nThe NREL researchers provide a qualitative review for a range of industry challenges, opportunities, and enabling approaches for the mining industry to adopt renewable energy at mine sites:\n\n**Table 5: Summary of issues for mine site renewable energy systems**\n\n| **Industry challenges**                                      |\n| ------------------------------------------------------------ |\n| Declining ore grade                                          |\n| Volatile metal and energy prices                             |\n| Increasing environmental concerns                            |\n| Increasing Political and Social Concerns                     |\n| **Opportunities**                                            |\n| Renewables for electricity demand                            |\n| Renewables to replace fossil fuelled heat   and transportation |\n| Renewables for feedstock demand                              |\n| Production of hydrogen via renewables                        |\n| **Industry linkage challenges**                              |\n| Political will and adjustment costs                          |\n| Conflicting business models                                  |\n| Need for technology proof-of-concept projects                |\n| Lack of renewable energy awareness   and expertise           |\n| Land constraints                                             |\n| **Enabling approaches**                                      |\n| Alignment of business model and incentives                   |\n| Capacity building                                            |\n| Research and development                                     |\n| Pooling resources                                            |\n| Government policies and regulations                          |\n\n\n\nThis paper did not list any significant copper mines in the USA utilising solar or wind on-site.\n\nIn 2016, Nevada Copper Corporation and Nevada Energy announced a “strategic alliance” with potential for a 500 MW solar PV project.[3](/citation/MM-101) Later that year, the local authority issued a zoning approval for solar energy on the Pumpkin Hollow Copper Development Property.[4](/citation/MM-102) However, as of December 2021, the solar farm was still in the study phase.[5](/citation/MM-103)\n\nIn 2017, a 7 MW solar PV farm was installed on top of a disused copper mine site at Greenwood, Vermont, USA.[6](/citation/MM-104)\n\n>  ***At the time of this writing, mine operations are – due to their remoteness – dependent on fossil fuels such as diesel, heavy oils, and coal. In principle, mining could use energy recovery, renewable energy, and carbon capture to supplement, replace, or mitigate the impacts of fossil fuel use. However, a combination of renewable-energy technologies would be required.\\*** *T. Igogo et al., 2021*\n\n## Australian survey\n\nIn 2022, Strazzabosco and colleagues at the Queensland University of Technology Business School surveyed the Australia mining houses for the adoption of renewable energy systems at Australia-based mine sites. The researchers found 27 projects in various phases of operation (15 units), construction (2), or future planning (10 projects). Of these, 70 percent were located at off-grid sites that had used diesel or gas, and 92 percent of the renewable energy projects were solar photovoltaic at such off-grid sites.\n\nAustralia’s 27 mines using or planning to use renewable energy systems represent 7 percent of the count of Australia’s mine sites. The change to adopt renewables is recent. Of those adopting the technology set, 70 percent were initiated since 2019.\n\nThe table below shows Australian mines deploying RE generation as cited in the Strazzabosco survey with a few minor updates.\n\n**Table 6: Renewable Energy Systems in the Australian mining industry** (source: Strazzabosco et al., 2022)\n\n|      | **Project**  | **Mine site location** | **Location of  installation** | **Technology** | **Year   commissioned or announced** | **Capacity   [MW]** | **Contribution to   energy needs**                 |\n| ---- | ------------ | ---------------------- | ----------------------------- | -------------- | ------------------------------------ | ------------------- | -------------------------------------------------- |\n| 1    | Agnew        | Leinster, WA           | on-site                       | Battery        | 2020                                 | 13                  | 13 MW / 4 MWh + 21 MW gas/diesel engine            |\n| 2    | Agnew        | Leinster, WA           | on-site                       | Solar PV       | 2019                                 | 4                   | 50% (including contribution of gas/ diesel engine) |\n| 3    | Agnew        | Leinster, WA           | on-site                       | Wind           | 2020                                 | 18                  | 50% (including contribution of gas/ diesel engine) |\n| 4    | Boonanarring | Gingin Shire,   WA     | on-site                       | Solar PV       | 2020                                 | 2.3                 | 12%                                                |\n\n\n\n**Table 6: Renewable Energy Systems in the Australian mining industry** (continued)\n\n|      | **Project**                    | **Mine site   location**          | **Location of  installation** | **Technology** | **Year   commissioned or announced** | **Capacity   [MW]** | **Contribution to   energy needs**                           |\n| ---- | ------------------------------ | --------------------------------- | ----------------------------- | -------------- | ------------------------------------ | ------------------- | ------------------------------------------------------------ |\n| 5    | Cannington                     | Mackay, QLD                       | on-site, re-D                 | Battery        | 2019                                 | n/a                 | Powering accommodation village and airport                   |\n| 6    | Cannington                     | Mackay, QLD                       | on-site, re-D                 | Solar PV       | 2019                                 | 3                   |                                                              |\n| 7    | Carosue Dam                    | Goldfields, WA                    | on-site, re-D                 | Solar PV       | 2020                                 | 6                   | Powering accommodation village.   1 MW 2020, 5 MW 2021.      |\n| 8    | Carrapateena                   | Port Augusta, SA                  | on-site                       | Battery        | 2020                                 | See note on right   | 180 kVA Hitachi-ABB battery e-mech Powerstore                |\n| 9    | Carrapateena                   | Port Augusta, SA                  | on-site                       | Solar PV       | 2020                                 | 0.120               | 120 kW Solar PV                                              |\n| 10   | Carrapateena                   | Port Augusta, SA                  | on-site                       | Hybrid         | 2020                                 | See note on right   | Total system electrical power   generation: 460 kW. 250 kVA   Diesel generators: 2x Cummins with   CoMap Inteligen500 controllers |\n| 11   | Century Zinc Mine              | Lawn Hill, QLD                    | on-site, re-D                 | Solar PV       | 2017                                 | 0.12                | not available                                                |\n| 12   | Chichester Hub                 | Pilbara, WA                       | on-site                       | Battery        | 2021                                 | 35                  | 30% of the total stationary energy requirement, together with the Iron Bridge project; (Cloudbreak & Christmas Creek mines) |\n| 13   | Chichester Hub                 | Pilbara, WA                       | on-site                       | Solar PV       | 2021                                 | 60                  |                                                              |\n| 14   | DeGrussa                       | Kumarina, WA                      | on-site                       | Battery        | 2016                                 | 6                   | 20% of diesel consumption                                    |\n| 15   | DeGrussa                       | Kumarina, WA                      | on-site                       | Solar PV       | 2016                                 | 10.6                |                                                              |\n| 16   | Granny Smith Project           | Laverton, WA                      | on-site                       | Battery        | 2020                                 | 2                   | 13% reduction in fuel consumption                            |\n| 17   | Granny Smith Project           | Laverton, WA                      | on-site                       | Solar PV       | 2020                                 | 7.3                 |                                                              |\n| 18   | Mount Cattlin                  | Ravensthorpe, WA                  | on-site                       | Solar PV       | 2011                                 | 0.1                 | 15% of the mine’s annual power needs                         |\n| 19   | Mount Cattlin                  | Ravensthorpe, WA                  | on-site                       | Wind           | 2011                                 | 2.4                 |                                                              |\n| 20   | Nova   Ni-Cu-Co Operation      | Fraser Range, WA                  | on-site                       | Solar PV       | 2019                                 | 5.5                 | not available                                                |\n| 21   | Port Gregory                   | Northampton Shire, WA             | on-site                       | Battery        | 2020                                 | 2                   | 70% of mine’s power requirements                             |\n| 22   | Port Gregory                   | Northampton Shire, WA             | on-site                       | Solar PV       | 2020                                 | 1.1                 |                                                              |\n| 23   | Port Gregory                   | Northampton Shire, WA             | on-site                       | Wind           | 2020                                 | 2.5                 |                                                              |\n| 24   | Sandy Ridge                    | Goldfields-  Esperance region, WA | on-site                       | Battery        | 2020                                 | 0.35                |                                                              |\n| 25   | Sandy Ridge                    | Goldfields-  Esperance region, WA | on-site                       | Solar PV       | 2020                                 | 1.2                 | 50% of the total electricity   required by the facility      |\n| 26   | Weipa                          | Weipa, QLD on                     | on-site                       | Solar PV       | 2016                                 | 1.7                 | 20% of existing diesel-generated electricity                 |\n| 27   | West Kwinana Nickel   Refinery | East   Rockingham, WA             | on-site                       | Solar PV       | 2021                                 | 100                 | 50% of electricity needs                                     |\n\n\n\n**Table 6: Renewable Energy Systems in the Australian mining industry** (continued) \n\nRenewable energy systems under construction\n\n|      | **Project**  | **Mine site location** | **Location of  installation** | **Technology** | **Year   commissioned or announced** | **Capacity   [MW]** | **Contribution to   energy needs**            |\n| ---- | ------------ | ---------------------- | ----------------------------- | -------------- | ------------------------------------ | ------------------- | --------------------------------------------- |\n| 28   | BHP QLD Coal | Brown Basin, QLD       | off-site                      | Wind           | 2020                                 | 1000                | 50% of electricity used across QLD coal mines |\n| 29   | BHP QLD Coal | Brown Basin, QLD       | off-site                      | Solar PV       | 2020                                 | 400                 | 50% of electricity used across QLD coal mines |\n| 30   | Cadia        | Cadia, NSW             | off-site                      | Wind           | 2020                                 | 400                 | 40% energy demand of mine                     |\n\n\n\nRenewable energy systems in planning phase or announced intentions\n\n|      | **Project**     | **Mine site location**    | **Location of  installation** | **Technology**  | **Year   commissioned or announced** | **Capacity   [MW]** | **Contribution to   energy needs**                           |\n| ---- | --------------- | ------------------------- | ----------------------------- | --------------- | ------------------------------------ | ------------------- | ------------------------------------------------------------ |\n| 31   | Brown’s Range   | Tanami,   WA/ NT          | on-site                       | Solar PV        | 2020                                 | 0.1                 | not available                                                |\n| 32   | Brown’s Range   | Tanami,   WA/ NT          | on-site                       | Battery         | 2020                                 | 0.2                 |                                                              |\n| 33   | Butcherbird     | Pilbara, WA               | on-site                       | Wind + Solar PV | 2019                                 | not   available     | 90% of electrowinning process electricity demand             |\n| 34   | Coburn Mine     | Shark Bay, WA             | on-site                       | Solar PV        | 2020                                 | 27                  | not available                                                |\n| 35   | Coburn Mine     | Shark Bay, WA             | on-site                       | Battery         | 2020                                 | not   available     | not available                                                |\n| 36   | Homestead       | Goldfield, WA             | on-site                       | Solar PV        | 2021                                 | 30                  | not available, (powering   Paddington and Mungari mill sites) |\n| 37   | Homestead       | Goldfield, WA             | on-site                       | Battery         | 2021                                 | 15                  | not available                                                |\n| 38   | Iron Bridge     | Pilbara, WA               | on-site                       | Solar PV        | 2020                                 | 150                 | not available                                                |\n| 39   | Iron Bridge     | Pilbara, WA               | on-site                       | Battery         | 2020                                 | not   available     | not available                                                |\n| 40   | Koodaideri Mine | Pilbara, WA               | on-site                       | Solar PV        | 2020                                 | 34                  | 65% of the mine’s average   electricity demand               |\n| 41   | Koodaideri Mine | Pilbara, WA               | on-site                       | Battery         | 2020                                 | 45                  | 12 MWh                                                       |\n| 42   | Mount Lyell     | Queenstown, TAS           | not   available               | Hydropower      | 2019                                 | not   available     | not available                                                |\n| 43   | Mount Lyell     | Queenstown, TAS           | not   available               | Geothermal      | 2019                                 | not   available     | not available                                                |\n| 44   | Nickel West     | Leinster, Mount Keith, WA | on-site                       | Solar PV        | 2020                                 | 18.5                | not available                                                |\n| 45   | Nickel West     | Leinster, Mount Keith, WA | on-site                       | Battery         | 2020                                 | not  available      | not available                                                |\n| 46   | West   Musgrave | West  Musgrave, WA        | on-site                       | Wind            | 2020                                 | 100                 | 55 MW total hybrid system including diesel generators, 80% of mine’s power needs including diesel generators |\n| 47   | West   Musgrave | West  Musgrave, WA        | on-site                       | Solar PV        | 2020                                 | 100                 |                                                              |\n\nThe Australia mining sector adoption of renewable energy systems is patchy, and although there has been recent growth, its future is not certain. Strazzabosco et al. report that the capacity and fraction of power supplied to sites from renewable energy systems vary significantly across the range of mine sites adopting RE. The researchers investigated barriers hindering the deployment of projects and note these critical obstacles:\n\n* lack of funding;\n\n* projects may be perceived as too ambitious or too innovative; and \n\n* changes in metal resource market conditions.\n\nNotably, large renewable energy projects at copper mining sites planned in South Australia are not yet built in the Gawler Craton region where the Prominent Hill and Carrapateena mine sites operate. A geothermal project announced in 2017 at the copper mine site at Mount Lyell, Tasmania has not yet been delivered.\n\nMost of the adoptions to date are off-grid mine sites, and solar photovoltaic is both strongly preferred and getting significantly cheaper year after year. Some of the solar PV systems are re-deployable style (3 of 17), but those are mainly small systems (4 MW of 89 MW total solar installed).\n\nHybrid solar and wind systems account for 28 MW in the study, contrasted to 1400 MW of off-site wind power systems (Cadia Hill Gold Mines).\n\nSubsequent to this survey by Strazzabosco et al., in 2021, OZ Minerals partnered with Unearthed on a renewable energy innovation challenge aimed to develop concepts for a 100 percent renewable energy mine plan for the company’s West Musgrave copper nickel plant, currently in planning.[7](/citation/MM-105) This would add significant renewable capacity to the unit cited in the survey, and it may establish a high benchmark for renewable energy ambition in Australia.\n\nVast Solar’s liquid sodium CSP technology was featured in the ZECMotF Water Report. The demonstration unit at the Mount Isa 50 MW North West Queensland Hybrid Power Project is a hybrid design that combines daytime solar PV, evening steam generation from molten salt, a battery for late night, and natural gas engines for reliable and constant 24 hour energy supply.[8](/citation/MM-106)\n\n## EU small hybrid study\n\nA group of European Union and UK researchers issued a 2021 report on Small Scale Mining operations (SSM), also referred to as Switch-On, Switch-Off mining (SOSO).[9](/citation/MM-107) The desktop study by Paneri et al. focussed on containerised Modular Hybrid Units (MHU) and studied deployment at multiple potential European sites. The researchers argue that a hybrid unit with 150 kW solar PV, a Tesla PW2 battery, and a 150 kW renewable biomass generator was more economical as a small modular hybrid unit than a similar wind unit or a traditional 180 kW diesel generator. Their financial calculations show that for a Bosnia mine site, the hybrid system was 90 percent fixed capital cost versus a diesel system at 90 percent variable fuel cost. After a 5 year deployment period on the renewable system, assuming €1.87million capital cost and €1.04million salvage value after 5 years, a renewable hybrid system saves about €1million. The project aimed to show that such modular hybrid units could make small-scale mining more feasible in Europe.\n\nIn 2022, Spanish utility company Endesa announced plans to install a 50 MW solar farm at Atalaya’s copper mine in southern Spain. The company claims this is the first such at-mine PV farm in Spain.[10](/citation/MM-108)\n\n## Chilean review of solar energy at copper sites\n\nThe Solar Energy Research Center (SERC) is affiliated with the University of Chile, Santiago. SERC researchers have published a number of papers supporting the use of solar energy at copper mining sites. A rapid expansion of renewable energy projects, especially solar PV and to a lesser degree concentrated solar thermal power and wind, occurred in Chile starting around 2014-15. Additional renewable energy projects in the copper mining Atacama Region have been added subsequently.\n\nIn 2015, Grágeda and colleagues reviewed 16 existing small PV plants that were collectively only 211 MW of nominal power.[11](/citation/MM-109) As of 2015, the researchers noted that over 100 new PV plants were approved or in construction. Mining is one of the largest consumers of electricity in Chile, and copper mining is about a third of the total power demand. Also, the cost of power was about one fifth of the total cost to produce copper in Chile. In 2015 Chile commissioned 2300 MW of new operational solar energy with a total of 10,000 MW of total proposed solar projects.\n\nMoreno-Leiva et al. (2018) reviewed several different solar energy technologies including solar for electrolysis hydrogen production. The researchers stated a case for using solar power for comminution, electrowinning, electrorefining and water supply including pumping and desalination.[12](/citation/MM-110)\n\nBehar et al. (2021) reviewed the use of solar energy in copper mining processes and found that as of April 2020, Chile had more than 2700 MW of solar and had installed 15 percent new solar in one year.[13](/citation/MM-111) The Atacama Desert has the highest solar irradiation available in the world, and the researchers see solar energy as a strategic advantage to Chile’s copper industry. Comminution is 50 percent of the power consumption of the Chilean copper production supply chain. Behar et al. believe that more solar PV can be used if comminution processes apply Demand Side Management (DSM), especially by selectively crushing and grinding softer ores at night and harder, more energy intensive ores at peak solar power in the day. The paper also examines a 300 MW hydroelectric seawater pumped storage unit, the Espejo de Tarapaca ́ project. The use of solar thermal for process heating and hybrid PV plus concentrated solar power (CSP) are also examined.\n\nBehar summarises on-site renewable energy projects as shown below.\n\n**Table 7: Renewable energy at Chilean copper mine sites**\n\n| **Mining   Company**   | **Mine site**      | **Capacity   [MW]** | **Solar   technology**                   | **Mining   process** | **Solar   developer** | **Financing** |\n| ---------------------- | ------------------ | ------------------- | ---------------------------------------- | -------------------- | --------------------- | ------------- |\n| Anglo American         | Collahuasi         | 25                  | Solar PV                                 | All processes        | Solarpack             | PPA           |\n| Antofagasta   Minerals | El Tesoro          | 10.5                | Solar thermal   (parabolic trough)       | Electro-winning      | Solarpack             | PPA           |\n| Antofagasta   Minerals | Chuquicamata       | 1                   | Solar PV –Diesel                         | All processes        | Solarpack             | PPA           |\n| Codelco                | Gabriela Mistral   | 32                  | Solar thermal   (Flat plate   collector) | Electro-winning      | Sunmark               | PPA           |\n| Quiborax               | El Aquila          | 2.3                 | Solar PV                                 | All processes        | E-CL                  | PPA           |\n| SCM                    | Minera   Constanza | 0.308               | Solar thermal   (Flat plate   collector) | Electro-winning      | n/a                   | n/a           |\n\nIn addition to those on-site renewable projects, numerous Atacama Desert solar PV projects, and the Coquimbo wind farm in the neighbouring region, supply power to Chilean copper mines and downstream metal purification processes. A number of sites mentioned in the journal articles previously cited are listed below for reference in one table. This is a non-exhaustive list of several projects.\n\n**Table 8: Off-site renewable energy supplying Chilean copper mine sites**\n\n| **Owner**          | **Site name** | **Capacity   [MW]** | **technology**            | **Year** | **Notes**                                                    |\n| ------------------ | ------------- | ------------------- | ------------------------- | -------- | ------------------------------------------------------------ |\n| Acciona            | El Romero     | 196                 | Solar PV                  | 2016     | 256 MW peak; 496 GWh   energy/year; Nov 2016 startup; USD$343mil |\n| Amanecer Solar CAP | Copiapó       | 100                 | Solar PV                  | 2014     | 270 GWh/year                                                 |\n| Arroyo             | Conejo        | 122                 | Solar PV                  | 2014     | USD$205mil project. Minera   Los Pelambres 22 year PPA for 79.3 MW. |\n| Arroyo             | El Arrayan    | 115                 | Wind                      | 2014     | Coquimbo Region. 30% owned by Antofagasta Minerals; PPA 70% of output to Minera Los Pelambres. |\n| Enel Green Power   | Terrae-1      | 160                 | Solar PV                  | 2016     | 400 GWh/year energy                                          |\n| Enel Green Power   | Terrae-2      | 126                 | Solar PV                  | 2021     | Plus 389 GWh/year                                            |\n| Enel Green Power   | Lalackama 1   | 60                  | Solar PV                  | 2014     | 160 GWh/year                                                 |\n| Enel Green Power   | Lalackama 2   | 18                  | Solar PV                  | 2015     | 50 GWh/year                                                  |\n| Enel Green Power   | Pampa Norte   | 79                  | Solar PV                  | 2016     | 200 GWh/year                                                 |\n| Enel Green Power   | Carrera Pinto | 97                  | Solar PV                  | 2016     | 260 GWh/year                                                 |\n| First Solar        | Luz del Norte | 141                 | Solar PV                  | 2015     |                                                              |\n| FRV Fotowatio      | Llanos-1      | 100                 | Solar PV                  | 2014     |                                                              |\n| FRV Fotowatio      | Llanos-2      | 432                 | Solar PV + battery hybrid | planning | Planning nominal power of 432 MW, a peak power of 458 MW, 120 MW in battery storage |\n| Innergex           | El Salvador   | 68                  | Solar PV                  | 2014     | 200 GWh/year                                                 |\n| SolarPack          | Granja        | 123                 | Solar PV                  | 2020     | USD$110mil                                                   |\n\nAs shown above, PPAs and mining company ownership of the utility scale power plants mean that Chilean copper is produced with a significant amount of renewable energy.\n\nIn another 2021 paper by Behar and a second set of co-researchers, detailed engineering cost analysis is undertaken to determine for copper mining sites which is lowest cost: solar PV, CSP or combined hybrid power units. The desktop study considers four sites at different latitudes.[14](/citation/MM-112-121) The analysis indicates that power costs would be in the range of USD$35-44/MWhe (USD3.5 to 4.4 cents/kWhe) for PV alone, USD$127-169/MWhe for CSP alone, and intermediate costs for mixed hybrid plants. Solar PV in Chile has an Internal Rate of Return (IRR) of 8 percent to 9 percent with a payback period of 5 to 6 years. CSP is less attractive. Behar et al. note that energy costs are 25-30 percent of Chilean copper total production costs. In the period of 2001 to 2012, electricity usage increased 71 percent, but production only increased 15 percent. Desalination and water pumping are major contributors, and electricity usage is expected to increase 2.7 percent year on year through the 2020s. Capital costs are approximately USD$1000 per MWDC at an installation labour cost of just USD$4.82 per hour. The study concludes with detailed cost analysis that a critical factor for solar PV costs is the geographical DNI Director Normal Irradiation, the measure of solar power intensity that varies with latitude and local cloud patterns.\n\nThere is a wide range of additional solar research, especially from SERC, that is supporting Chile’s copper industry. From solar thermal pyrolysis of old mining tires[15](/citation/MM-113) to ship-based wind hydroturbines that electrolyse seawater to deliver hydrogen for copper mining,[16](/citation/MM-114) these university supported research programs are delivering creative solutions to the industry’s energy challenges.\n\n## Marsden 90 percent solar concept proposal for copper mining\n\nUS METS consultant John Marsden makes a case in a pair of papers for deep electrification using solar energy for southwest USA, Australian, and Latin American copper mine sites. In the first paper, Marsden establishes a baseline energy for copper mining and processing.[17](/citation/MM-115) The data is based on Freeport-McMoRan Copper & Gold Inc. 2008 data from 10 geographical sites and16 unit operations. Five tables and graphs divide the data by ore grade and unit operation.\n\nThe second paper cites this data as a reasonable baseline reference case for the energy use requirement for a 90 percent renewable power concept for copper production from solar PV.[18](/citation/MM-116-122) Marsden embraces a Zero Emission Copper Mine of the Future theme and argues that copper producers should reach their future state in three stages. Phase I, “Clean peak power”, would have producers install solar PV equivalent to their current peak electricity demand at mid day. He estimates this as 78 MW based on a hypothetical “Greenstone Mine”. The fictional open cut mine uses three-stage crushing and LX/SX/EW processing to deliver cathode copper product from a desert mine site with high solar insolation. The notional site produces 164,000 tons per year copper from 0.5 percent ore and 75 percent copper recovery. Flow diagrams and energy balances are provided along with key assumptions. Phase I is proposed to occur in two years.\n\nThe next stage is Phase II, “Mine electrification”. All diesel equipment is converted to electrified machinery over a period of the next five years. This increases the need for solar generation to 123 MW peak power. In the final stage, Phase III “90 percent renewable energy,” on-site energy storage is added for 24-hours supply of energy. This increases the peak solar power to 446 MW. Lithium ion battery storage, pumped hydroelectric, and weighted rail car energy storage systems are analysed, and the latter two are favoured in subsequent financial analysis that follows. Although the paper is a concept proposal, it does pragmatically lay out the financial analysis for a Zero Emission Copper Mine of the Future.\n\nAnother concept paper by Jannick Haas and co-authors posits: “Copper mining: 100 percent solar electricity by 2030?”[19](/citation/MM-117) These researchers believe that from 2020 onwards, copper mines should use solar energy above 25 percent, and that by 2030 the industry should have its first demonstration 100 percent solar mines. Haas et al. predict that Latin American producers will enjoy the lowest electricity costs, and cheap solar energy will offset increased costs from declining future ore grades.\n\nThe increase in solar installation in Chile, the ambition demonstrated by the OZ Minerals West Musgrove, Australia site, the 90 percent concept by Marsden, and the 100 percent solar concept paper by Haas all point in one direction. The industry should continue pursuit of total electrification, on-site energy storage, and fully or nearly 100 percent zero emission power supply.\n\nIn a zero emission future, copper miners who manage operations and costs will have a competitive advantage over sites who are slow to respond and stuck with  outdated energy systems.\n\n<Post slug=\"are-small-modular-nuclear-reactors-a-viable-zero-emission-power-alternative\" id=\"65d2edbfebf7bb9388ffb092\" />\n\n## Synthesis and summary\nThe adoption of renewable energy at mine sites in Australia appears to exceed the USA. The adoption of renewable energy near copper mine sites in Chile is probably highest in the world. A strong uptake of solar PV in Chile around 2014-2016 now provides a strong track record of operational performance. Solar PV may be highly suited for remote desert sites common in Chile, Australia and the southwestern USA. Chile’s solar PV in the Atacama Desert is grid connected, but some of that grid infrastructure may be relatively new. Many off-site RE generators are owned or partially owned by copper miners. There was variation in viewpoint from project participants. On one hand a view existed that copper miners should not become power generators themselves, and on the other hand an alternative view existed that direct equity ownership is the cheapest option to deliver electrification.\n\nFor many sites, solar PV is cheaper than concentrated solar power (steam turbine), but CSP offers after sunset conversion of molten salt sensible heat to electricity. Hybrid solar plus batteries units are increasing in prevalence, as are hybrid RE plus biofuels or diesel non-renewable generators.\n\nThe research demonstrates that activity is increasing and the Zero Emission Copper Mine of the Future concept is being embraced by miners, METS consultants, and academic researchers.\n\n<Post slug=\"ok-tedis-hydroelectric-plant\" id=\"65d2edbfebf7bb9388ffb08e\" />\n"},"organisations":[{"id":"65d2edadebf7bb9388ffaf90","name":"Anglo American","slug":"anglo-american","type":{"id":"65d2edb4ebf7bb9388ffafec","name":"Producers","slug":"producers"},"countries":[{"id":"65d2ed8cebf7bb9388ffabcb","slug":"brazil","name":"Brazil","path":"/countries/brazil"},{"id":"65d2ed8cebf7bb9388ffabd6","slug":"chile","name":"Chile","path":"/countries/chile"},{"id":"65d2ed8cebf7bb9388ffabd7","slug":"china","name":"China","path":"/countries/china"},{"id":"65d2ed8cebf7bb9388ffabef","slug":"finland","name":"Finland","path":"/countries/finland"},{"id":"65d2ed8cebf7bb9388ffac3e","slug":"peru","name":"Peru","path":"/countries/peru"},{"id":"65d2ed8cebf7bb9388ffac52","slug":"singapore","name":"Singapore","path":"/countries/singapore"},{"id":"65d2ed8cebf7bb9388ffac57","slug":"south-africa","name":"South Africa","path":"/countries/south-africa"},{"id":"65d2ed8cebf7bb9388ffac70","slug":"united-kingdom","name":"United Kingdom","path":"/countries/united-kingdom"}],"openGraph":{"id":"openGraph_organisation/anglo-american","title":"Anglo American","image":{"id":"image_copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf","url":"https://res.cloudinary.com/shapeable/image/upload/v1692073308/copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf.png","url2x":null,"thumbnails":{"id":"thumbnails-file_copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf","bubble":{"id":"thumbnails-bubble-file_copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_64/v1692073308/copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf.png","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_128/v1692073308/copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf.png"},"card":{"id":"thumbnails-card-file_copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_480/v1692073308/copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf.png","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_960/v1692073308/copper-alliance/organisation/anglo-american_logo__AAL.L_BIG-30373c8c_uddylf.png"}}}},"path":"/organisations/anglo-american","__typename":"Platform_Organisation","technologies":[]}],"embeds":{"citations":[{"slug":"MM-99","url":" https://www.nrel.gov/about/mission-programs.html","name":"NREL Transforming Energy, Mission and Programs","authors":[{"id":"65d2ed6bebf7bb9388ffa773","name":"NREL","slug":"nrel"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":99,"year":null},{"slug":"MM-100","url":"https://doi.org/10.1016/j.apenergy.2021.117375","name":"Integrating renewable energy into mining operations: Opportunities, challenges, and enabling approaches","authors":[{"id":"65d2ed6bebf7bb9388ffa7cc","name":"T. Igogo","slug":"t-igogo"},{"id":"65d2ed6bebf7bb9388ffa710","name":"K. Awuah-Offei","slug":"k-awuah-offei"},{"id":"65d2ed6bebf7bb9388ffa63b","name":"A. Newman","slug":"a-newman"},{"id":"65d2ed6bebf7bb9388ffa7d1","name":"T. Lowder","slug":"t-lowder"},{"id":"65d2ed6bebf7bb9388ffa6f8","name":"J. Engel-Cox","slug":"j-engel-cox"}],"authorShowsEtAl":null,"edition":null,"publication":"Applied Energy","accessDate":null,"startPage":117375,"volume":300,"footnoteNumber":100,"year":2021},{"slug":"MM-101","url":" https://nevadacopper.com/news/nevada-copper-forms-strategic-alliance-with-nv-energy-on-solar-development-opportunity/","name":"Nevada Copper Forms Strategic Alliance with NV Energy on Solar Development Opportunity","authors":[{"id":"65d2ed6bebf7bb9388ffa770","name":"Nevada Copper","slug":"nevada-copper"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":101,"year":2016},{"slug":"MM-102","url":" https://nevadacopper.com/news/nevada-copper-and-city-of-yerington-advance-solar-zoning/","name":"Nevada Copper and City of Yerington Advance Solar Zoning","authors":[{"id":"65d2ed6bebf7bb9388ffa770","name":"Nevada Copper","slug":"nevada-copper"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":102,"year":2016},{"slug":"MM-103","url":" https://nevadacopper.com/site/assets/files/4252/2021_ye_ncu_mda_final_for_sedar.pdf","name":"Nevada Copper Corporation Annual Report, March 2022, Management’s Discussion and Analysis for the Year Ended December 31 2021","authors":[{"id":"65d2ed6bebf7bb9388ffa770","name":"Nevada Copper","slug":"nevada-copper"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":103,"year":2021},{"slug":"MM-104","url":" https://www.solarpowerworldonline.com/2017/09/greenwood-energy-adds-solar-former-copper-mine-vermont/","name":"Greenwood Energy adds solar to former copper mine in Vermont","authors":[{"id":"65d2ed6bebf7bb9388ffa719","name":"K. Misbrener","slug":"k-misbrener"}],"authorShowsEtAl":null,"edition":null,"publication":"Solar Power World","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":104,"year":2017},{"slug":"MM-105","url":" https://www.ozminerals.com/en/where-we-work/west-musgrave ","name":"West Musgrave","authors":[{"id":"65d2ed6bebf7bb9388ffa779","name":"OZ Minerals","slug":"oz-minerals"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":105,"year":2021},{"slug":"MM-106","url":" https://vastsolar.com/portfolio-items/mount-isa/","name":"Delivering cheap, clean baseload power to Mount Isa","authors":[{"id":"65d2ed6bebf7bb9388ffa7f3","name":"Vast Solar","slug":"vast-solar"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":106,"year":2021},{"slug":"MM-107","url":" https://doi.org/10.1016/j.resconrec.2021.105674","name":"Renewable energy can make small-scale mining in Europe more feasible, Resources, Conservation and Recycling","authors":[{"id":"65d2ed6bebf7bb9388ffa63e","name":"A. Paneri","slug":"a-paneri"},{"id":"65d2ed6bebf7bb9388ffa71a","name":"K. Moore","slug":"k-moore"},{"id":"65d2ed6bebf7bb9388ffa629","name":"A. Beylot","slug":"a-beylot"},{"id":"65d2ed6bebf7bb9388ffa7b3","name":"S. Muller","slug":"s-muller"},{"id":"65d2ed6bebf7bb9388ffa73b","name":"M. Braun","slug":"m-braun"},{"id":"65d2ed6bebf7bb9388ffa805","name":"X. Yan","slug":"x-yan"}],"authorShowsEtAl":null,"edition":null,"publication":"Resources, Conservation and Recycling","accessDate":null,"startPage":105674,"volume":172,"footnoteNumber":107,"year":2021},{"slug":"MM-108","url":" https://www.endesa.com/es/prensa/sala-de-prensa/noticias/transicion-energetica/endesax-atalayamining-acuerdo-construccion-primera-instalacion-autoconsumo-mina-espana","name":"Endesa X y atalaya Mining","authors":[],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":108,"year":null},{"slug":"MM-109","url":" https://doi.org/10.1016/j.rser.2015.12.149","name":"Review and multi-criteria assessment of solar energy projects in Chile","authors":[{"id":"65d2ed6bebf7bb9388ffa741","name":"M. Grágeda","slug":"m-grageda"},{"id":"65d2ed6bebf7bb9388ffa740","name":"M. Escudero","slug":"m-escudero"},{"id":"65d2ed6bebf7bb9388ffa7f5","name":"W. Alavia","slug":"w-alavia"},{"id":"65d2ed6bebf7bb9388ffa7ba","name":"S. Ushak","slug":"s-ushak"},{"id":"65d2ed6bebf7bb9388ffa7f0","name":"V. Fthenakis","slug":"v-fthenakis"}],"authorShowsEtAl":null,"edition":null,"publication":"Renewable and Sustainable Energy Reviews","accessDate":null,"startPage":583,"volume":59,"footnoteNumber":109,"year":2016},{"slug":"MM-110","url":" https://doi.org/10.1063/1.5067015","name":"Solar Energy Alternatives for Copper Production","authors":[{"id":"65d2ed6bebf7bb9388ffa7b2","name":"S. Moreno-Leiva","slug":"s-moreno-leiva"},{"id":"65d2ed6bebf7bb9388ffa6b1","name":"F. Valencia","slug":"f-valencia"},{"id":"65d2ed6bebf7bb9388ffa6fc","name":"J. Haas","slug":"j-haas"},{"id":"65d2ed6bebf7bb9388ffa688","name":"D. Chudinzow","slug":"d-chudinzow"},{"id":"65d2ed6bebf7bb9388ffa727","name":"L. Eltrop","slug":"l-eltrop"}],"authorShowsEtAl":null,"edition":"1","publication":"AIP Conference Proceedings","accessDate":null,"startPage":20006,"volume":2033,"footnoteNumber":110,"year":2018},{"slug":"MM-111","url":"https://doi.org/10.1016/j.clet.2021.100259","name":"The use of solar energy in the copper mining processes: A comprehensive review","authors":[{"id":"65d2ed6bebf7bb9388ffa775","name":"O. Behar","slug":"o-behar"},{"id":"65d2ed6bebf7bb9388ffa79b","name":"R. Peña","slug":"r-pena"},{"id":"65d2ed6bebf7bb9388ffa7af","name":"S. Kouro","slug":"s-kouro"},{"id":"65d2ed6bebf7bb9388ffa7fa","name":"W. Kracht","slug":"w-kracht"},{"id":"65d2ed6bebf7bb9388ffa69f","name":"E. Fuentealba","slug":"e-fuentealba"},{"id":"65d2ed6bebf7bb9388ffa72d","name":"L. Moran","slug":"l-moran"},{"id":"65d2ed6bebf7bb9388ffa696","name":"D. Sbarbaro","slug":"d-sbarbaro"}],"authorShowsEtAl":null,"edition":null,"publication":"Cleaner Engineering and Technology","accessDate":null,"startPage":100259,"volume":4,"footnoteNumber":111,"year":2021},{"slug":"MM-112-121","url":"https://doi.org/10.1016/j.jclepro.2020.125455","name":"Which is the most competitive solar power technology for integration into the existing copper mining plants: Photovoltaic (PV), Concentrating Solar Power (CSP), or hybrid PV-CSP?","authors":[{"id":"65d2ed6bebf7bb9388ffa775","name":"O. Behar","slug":"o-behar"},{"id":"65d2ed6bebf7bb9388ffa696","name":"D. Sbarbaro","slug":"d-sbarbaro"},{"id":"65d2ed6bebf7bb9388ffa72d","name":"L. Moran","slug":"l-moran"}],"authorShowsEtAl":null,"edition":null,"publication":"Journal of Cleaner Production","accessDate":null,"startPage":125455,"volume":287,"footnoteNumber":112,"year":null},{"slug":"MM-113","url":" https://doi.org/10.1063/1.5067012","name":"Solar-powered pyrolysis of scrap rubber from mining truck end-of-life tires – A case study for the mining industry in the Atacama Desert, Chile","authors":[{"id":"65d2ed6bebf7bb9388ffa6b8","name":"G. Díaz-Ferrán","slug":"g-diaz-ferran"},{"id":"65d2ed6bebf7bb9388ffa688","name":"D. Chudinzow","slug":"d-chudinzow"},{"id":"65d2ed6bebf7bb9388ffa7fa","name":"W. Kracht","slug":"w-kracht"}],"authorShowsEtAl":null,"edition":null,"publication":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":113,"year":2018},{"slug":"MM-114","url":"https://doi.org/10.1016/j.jclepro.2017.02.136","name":"A combined photovoltaic and novel renewable energy system: An optimized techno-economic analysis for mining industry applications","authors":[{"id":"65d2ed6bebf7bb9388ffa6a5","name":"E. Vyhmeister","slug":"e-vyhmeister"},{"id":"65d2ed6bebf7bb9388ffa669","name":"C. A. Muñoz","slug":"c-a-munoz"},{"id":"65d2ed6bebf7bb9388ffa704","name":"J. M. B. Miquel","slug":"j-m-b-miquel"},{"id":"65d2ed6bebf7bb9388ffa70a","name":"J. P. Moya","slug":"j-p-moya"},{"id":"65d2ed6bebf7bb9388ffa670","name":"C. F. Guerra","slug":"c-f-guerra"},{"id":"65d2ed6bebf7bb9388ffa731","name":"L. Rodríguez Mayor","slug":"l-rodriguez-mayor"},{"id":"65d2ed6bebf7bb9388ffa630","name":"A. Godoy-Faúndez","slug":"a-godoy-faundez"},{"id":"65d2ed6bebf7bb9388ffa782","name":"P. Higueras","slug":"p-higueras"},{"id":"65d2ed6bebf7bb9388ffa66d","name":"C. Clemente-Jul","slug":"c-clemente-jul"},{"id":"65d2ed6bebf7bb9388ffa6d2","name":"H. Valdés-González","slug":"h-valdes-gonzalez"},{"id":"65d2ed6bebf7bb9388ffa730","name":"L. Reyes-Bozo","slug":"l-reyes-bozo"}],"authorShowsEtAl":null,"edition":null,"publication":"Journal of Cleaner Production","accessDate":null,"startPage":999,"volume":149,"footnoteNumber":114,"year":2017},{"slug":"MM-115","url":"https://www.researchgate.net/publication/289540201_Hydrometallurgy_2008_Proceedings_of_the_Sixth_International_Symposium","name":"Hydrometallurgy 2008: Proceedings of the Sixth International Symposium","authors":[{"id":"65d2ed6bebf7bb9388ffa80a","name":"Y. Choi","slug":"y-choi"},{"id":"65d2ed6bebf7bb9388ffa679","name":"C. Young","slug":"c-young"},{"id":"65d2ed6bebf7bb9388ffa78e","name":"P. Taylor","slug":"p-taylor"},{"id":"65d2ed6bebf7bb9388ffa66a","name":"C. Anderson","slug":"c-anderson"}],"authorShowsEtAl":null,"edition":null,"publication":"Society for Mining, Metallurgy & Exploration","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":115,"year":2008},{"slug":"MM-116-122","url":"https://doi.org/10.1007/s42461-021-00440-9","name":"Potential Pathways for Mining Operations to Transition to Renewable Energy — a Case Study","authors":[{"id":"65d2ed6bebf7bb9388ffa776","name":"O. W. Marsden","slug":"o-w-marsden"},{"id":"65d2ed6bebf7bb9388ffa70b","name":"J. W. Marsden","slug":"j-w-marsden"}],"authorShowsEtAl":null,"edition":null,"publication":"Mining, Metallurgy & Exploration ","accessDate":null,"startPage":1689,"volume":38,"footnoteNumber":116,"year":2021},{"slug":"MM-117","url":"https://doi.org/10.1016/j.apenergy.2020.114506","name":"Copper mining: 100% solar electricity by 2030?.","authors":[{"id":"65d2ed6bebf7bb9388ffa6fc","name":"J. Haas","slug":"j-haas"},{"id":"65d2ed6bebf7bb9388ffa7b2","name":"S. Moreno-Leiva","slug":"s-moreno-leiva"},{"id":"65d2ed6bebf7bb9388ffa7cd","name":"T. Junne","slug":"t-junne"},{"id":"65d2ed6bebf7bb9388ffa77d","name":"P. Chen","slug":"p-chen"},{"id":"65d2ed6bebf7bb9388ffa6c0","name":"G. Pamparana","slug":"g-pamparana"},{"id":"65d2ed6bebf7bb9388ffa7fb","name":"W. Nowak","slug":"w-nowak"},{"id":"65d2ed6bebf7bb9388ffa7fa","name":"W. Kracht","slug":"w-kracht"},{"id":"65d2ed6bebf7bb9388ffa706","name":"J. M. Ortiz","slug":"j-m-ortiz"}],"authorShowsEtAl":null,"edition":null,"publication":"Applied Energy","accessDate":null,"startPage":114506,"volume":262,"footnoteNumber":117,"year":2022}],"imageAssets":[],"posts":[{"id":"65d2edbfebf7bb9388ffb08e","name":"Ok Tedi’s hydroelectric plant","slug":"ok-tedis-hydroelectric-plant","path":"/posts/ok-tedis-hydroelectric-plant","openGraph":{"title":null,"description":{"plain":"Ok Tedi Mining Ltd generates its own electricity to supply the mine, its processing plant, and the local township of..."},"image":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1690318282/copper-alliance/banner/mm-35-ok_image__MM-35-8.8.p60_pow3fz.webp","url2x":null,"type":"image/webp"}}},{"id":"65d2edbfebf7bb9388ffb092","name":"Are small modular nuclear reactors a viable  zero-emission power alternative?","slug":"are-small-modular-nuclear-reactors-a-viable-zero-emission-power-alternative","path":"/posts/are-small-modular-nuclear-reactors-a-viable-zero-emission-power-alternative","openGraph":{"title":null,"description":{"plain":"In February 2022, KGHM (Poland) and NuScale (USA) signed a contract to place a small modular reactor (SMR) at a..."},"image":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1690317639/copper-alliance/banner/mm-34-banner_image__MM-34-8.7.pp59_cmyk_nf0fmu.jpg","url2x":null,"type":"image/jpeg"}}}]},"video":null,"banner":{"id":"65d2ed72ebf7bb9388ffa985","image":{"id":"image_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","url":"https://res.cloudinary.com/shapeable/image/upload/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp","thumbnails":{"mainBanner":{"id":"thumbnails-main-banner-file_copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_1440/v1734654240/copper-connect/banner/topic-energy-theme-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-08_yxtunc.webp"}}}},"fileAssets":[],"citations":[{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa6a","path":"/citations/MM-99","slug":"MM-99","url":" https://www.nrel.gov/about/mission-programs.html","name":"NREL Transforming Energy, Mission and Programs","authors":[{"id":"65d2ed6bebf7bb9388ffa773","name":"NREL","slug":"nrel"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":99,"year":null},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa41","path":"/citations/MM-100","slug":"MM-100","url":"https://doi.org/10.1016/j.apenergy.2021.117375","name":"Integrating renewable energy into mining operations: Opportunities, challenges, and enabling approaches","authors":[{"id":"65d2ed6bebf7bb9388ffa7cc","name":"T. Igogo","slug":"t-igogo"},{"id":"65d2ed6bebf7bb9388ffa710","name":"K. Awuah-Offei","slug":"k-awuah-offei"},{"id":"65d2ed6bebf7bb9388ffa63b","name":"A. Newman","slug":"a-newman"},{"id":"65d2ed6bebf7bb9388ffa7d1","name":"T. Lowder","slug":"t-lowder"},{"id":"65d2ed6bebf7bb9388ffa6f8","name":"J. Engel-Cox","slug":"j-engel-cox"}],"authorShowsEtAl":null,"edition":null,"publication":"Applied Energy","date":"15/10/2021","accessDate":null,"startPage":117375,"volume":300,"footnoteNumber":100,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa66","path":"/citations/MM-101","slug":"MM-101","url":" https://nevadacopper.com/news/nevada-copper-forms-strategic-alliance-with-nv-energy-on-solar-development-opportunity/","name":"Nevada Copper Forms Strategic Alliance with NV Energy on Solar Development Opportunity","authors":[{"id":"65d2ed6bebf7bb9388ffa770","name":"Nevada Copper","slug":"nevada-copper"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":"11/02/2016","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":101,"year":2016},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa64","path":"/citations/MM-102","slug":"MM-102","url":" https://nevadacopper.com/news/nevada-copper-and-city-of-yerington-advance-solar-zoning/","name":"Nevada Copper and City of Yerington Advance Solar Zoning","authors":[{"id":"65d2ed6bebf7bb9388ffa770","name":"Nevada Copper","slug":"nevada-copper"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":"03/05/2016","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":102,"year":2016},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa65","path":"/citations/MM-103","slug":"MM-103","url":" https://nevadacopper.com/site/assets/files/4252/2021_ye_ncu_mda_final_for_sedar.pdf","name":"Nevada Copper Corporation Annual Report, March 2022, Management’s Discussion and Analysis for the Year Ended December 31 2021","authors":[{"id":"65d2ed6bebf7bb9388ffa770","name":"Nevada Copper","slug":"nevada-copper"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":"31/03/2021","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":103,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa27","path":"/citations/MM-104","slug":"MM-104","url":" https://www.solarpowerworldonline.com/2017/09/greenwood-energy-adds-solar-former-copper-mine-vermont/","name":"Greenwood Energy adds solar to former copper mine in Vermont","authors":[{"id":"65d2ed6bebf7bb9388ffa719","name":"K. Misbrener","slug":"k-misbrener"}],"authorShowsEtAl":null,"edition":null,"publication":"Solar Power World","date":"27/09/2017","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":104,"year":2017},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaad9","path":"/citations/MM-105","slug":"MM-105","url":" https://www.ozminerals.com/en/where-we-work/west-musgrave ","name":"West Musgrave","authors":[{"id":"65d2ed6bebf7bb9388ffa779","name":"OZ Minerals","slug":"oz-minerals"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":"2021","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":105,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7debf7bb9388ffaa08","path":"/citations/MM-106","slug":"MM-106","url":" https://vastsolar.com/portfolio-items/mount-isa/","name":"Delivering cheap, clean baseload power to Mount Isa","authors":[{"id":"65d2ed6bebf7bb9388ffa7f3","name":"Vast Solar","slug":"vast-solar"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":106,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa79","path":"/citations/MM-107","slug":"MM-107","url":" https://doi.org/10.1016/j.resconrec.2021.105674","name":"Renewable energy can make small-scale mining in Europe more feasible, Resources, Conservation and Recycling","authors":[{"id":"65d2ed6bebf7bb9388ffa63e","name":"A. Paneri","slug":"a-paneri"},{"id":"65d2ed6bebf7bb9388ffa71a","name":"K. Moore","slug":"k-moore"},{"id":"65d2ed6bebf7bb9388ffa629","name":"A. Beylot","slug":"a-beylot"},{"id":"65d2ed6bebf7bb9388ffa7b3","name":"S. Muller","slug":"s-muller"},{"id":"65d2ed6bebf7bb9388ffa73b","name":"M. Braun","slug":"m-braun"},{"id":"65d2ed6bebf7bb9388ffa805","name":"X. Yan","slug":"x-yan"}],"authorShowsEtAl":null,"edition":null,"publication":"Resources, Conservation and Recycling","date":"09/2021","accessDate":null,"startPage":105674,"volume":172,"footnoteNumber":107,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7debf7bb9388ffaa0f","path":"/citations/MM-108","slug":"MM-108","url":" https://www.endesa.com/es/prensa/sala-de-prensa/noticias/transicion-energetica/endesax-atalayamining-acuerdo-construccion-primera-instalacion-autoconsumo-mina-espana","name":"Endesa X y atalaya Mining","authors":[],"authorShowsEtAl":null,"edition":null,"publication":null,"date":null,"accessDate":null,"startPage":null,"volume":null,"footnoteNumber":108,"year":null},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa82","path":"/citations/MM-109","slug":"MM-109","url":" https://doi.org/10.1016/j.rser.2015.12.149","name":"Review and multi-criteria assessment of solar energy projects in Chile","authors":[{"id":"65d2ed6bebf7bb9388ffa741","name":"M. Grágeda","slug":"m-grageda"},{"id":"65d2ed6bebf7bb9388ffa740","name":"M. Escudero","slug":"m-escudero"},{"id":"65d2ed6bebf7bb9388ffa7f5","name":"W. Alavia","slug":"w-alavia"},{"id":"65d2ed6bebf7bb9388ffa7ba","name":"S. Ushak","slug":"s-ushak"},{"id":"65d2ed6bebf7bb9388ffa7f0","name":"V. Fthenakis","slug":"v-fthenakis"}],"authorShowsEtAl":null,"edition":null,"publication":"Renewable and Sustainable Energy Reviews","date":"06/2016","accessDate":null,"startPage":583,"volume":59,"footnoteNumber":109,"year":2016},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa94","path":"/citations/MM-110","slug":"MM-110","url":" https://doi.org/10.1063/1.5067015","name":"Solar Energy Alternatives for Copper Production","authors":[{"id":"65d2ed6bebf7bb9388ffa7b2","name":"S. Moreno-Leiva","slug":"s-moreno-leiva"},{"id":"65d2ed6bebf7bb9388ffa6b1","name":"F. Valencia","slug":"f-valencia"},{"id":"65d2ed6bebf7bb9388ffa6fc","name":"J. Haas","slug":"j-haas"},{"id":"65d2ed6bebf7bb9388ffa688","name":"D. Chudinzow","slug":"d-chudinzow"},{"id":"65d2ed6bebf7bb9388ffa727","name":"L. Eltrop","slug":"l-eltrop"}],"authorShowsEtAl":null,"edition":"1","publication":"AIP Conference Proceedings","date":null,"accessDate":null,"startPage":20006,"volume":2033,"footnoteNumber":110,"year":2018},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaabc","path":"/citations/MM-111","slug":"MM-111","url":"https://doi.org/10.1016/j.clet.2021.100259","name":"The use of solar energy in the copper mining processes: A comprehensive review","authors":[{"id":"65d2ed6bebf7bb9388ffa775","name":"O. Behar","slug":"o-behar"},{"id":"65d2ed6bebf7bb9388ffa79b","name":"R. Peña","slug":"r-pena"},{"id":"65d2ed6bebf7bb9388ffa7af","name":"S. Kouro","slug":"s-kouro"},{"id":"65d2ed6bebf7bb9388ffa7fa","name":"W. Kracht","slug":"w-kracht"},{"id":"65d2ed6bebf7bb9388ffa69f","name":"E. Fuentealba","slug":"e-fuentealba"},{"id":"65d2ed6bebf7bb9388ffa72d","name":"L. Moran","slug":"l-moran"},{"id":"65d2ed6bebf7bb9388ffa696","name":"D. Sbarbaro","slug":"d-sbarbaro"}],"authorShowsEtAl":null,"edition":null,"publication":"Cleaner Engineering and Technology","date":"10/2021","accessDate":null,"startPage":100259,"volume":4,"footnoteNumber":111,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaade","path":"/citations/MM-112-121","slug":"MM-112-121","url":"https://doi.org/10.1016/j.jclepro.2020.125455","name":"Which is the most competitive solar power technology for integration into the existing copper mining plants: Photovoltaic (PV), Concentrating Solar Power (CSP), or hybrid PV-CSP?","authors":[{"id":"65d2ed6bebf7bb9388ffa775","name":"O. Behar","slug":"o-behar"},{"id":"65d2ed6bebf7bb9388ffa696","name":"D. Sbarbaro","slug":"d-sbarbaro"},{"id":"65d2ed6bebf7bb9388ffa72d","name":"L. Moran","slug":"l-moran"}],"authorShowsEtAl":null,"edition":null,"publication":"Journal of Cleaner Production","date":null,"accessDate":null,"startPage":125455,"volume":287,"footnoteNumber":112,"year":null},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa95","path":"/citations/MM-113","slug":"MM-113","url":" https://doi.org/10.1063/1.5067012","name":"Solar-powered pyrolysis of scrap rubber from mining truck end-of-life tires – A case study for the mining industry in the Atacama Desert, Chile","authors":[{"id":"65d2ed6bebf7bb9388ffa6b8","name":"G. Díaz-Ferrán","slug":"g-diaz-ferran"},{"id":"65d2ed6bebf7bb9388ffa688","name":"D. Chudinzow","slug":"d-chudinzow"},{"id":"65d2ed6bebf7bb9388ffa7fa","name":"W. Kracht","slug":"w-kracht"}],"authorShowsEtAl":null,"edition":null,"publication":null,"date":"08/11/2018","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":113,"year":2018},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7debf7bb9388ffa9c0","path":"/citations/MM-114","slug":"MM-114","url":"https://doi.org/10.1016/j.jclepro.2017.02.136","name":"A combined photovoltaic and novel renewable energy system: An optimized techno-economic analysis for mining industry applications","authors":[{"id":"65d2ed6bebf7bb9388ffa6a5","name":"E. Vyhmeister","slug":"e-vyhmeister"},{"id":"65d2ed6bebf7bb9388ffa669","name":"C. A. Muñoz","slug":"c-a-munoz"},{"id":"65d2ed6bebf7bb9388ffa704","name":"J. M. B. Miquel","slug":"j-m-b-miquel"},{"id":"65d2ed6bebf7bb9388ffa70a","name":"J. P. Moya","slug":"j-p-moya"},{"id":"65d2ed6bebf7bb9388ffa670","name":"C. F. Guerra","slug":"c-f-guerra"},{"id":"65d2ed6bebf7bb9388ffa731","name":"L. Rodríguez Mayor","slug":"l-rodriguez-mayor"},{"id":"65d2ed6bebf7bb9388ffa630","name":"A. Godoy-Faúndez","slug":"a-godoy-faundez"},{"id":"65d2ed6bebf7bb9388ffa782","name":"P. Higueras","slug":"p-higueras"},{"id":"65d2ed6bebf7bb9388ffa66d","name":"C. Clemente-Jul","slug":"c-clemente-jul"},{"id":"65d2ed6bebf7bb9388ffa6d2","name":"H. Valdés-González","slug":"h-valdes-gonzalez"},{"id":"65d2ed6bebf7bb9388ffa730","name":"L. Reyes-Bozo","slug":"l-reyes-bozo"}],"authorShowsEtAl":null,"edition":null,"publication":"Journal of Cleaner Production","date":"04/2017","accessDate":null,"startPage":999,"volume":149,"footnoteNumber":114,"year":2017},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa33","path":"/citations/MM-115","slug":"MM-115","url":"https://www.researchgate.net/publication/289540201_Hydrometallurgy_2008_Proceedings_of_the_Sixth_International_Symposium","name":"Hydrometallurgy 2008: Proceedings of the Sixth International Symposium","authors":[{"id":"65d2ed6bebf7bb9388ffa80a","name":"Y. Choi","slug":"y-choi"},{"id":"65d2ed6bebf7bb9388ffa679","name":"C. Young","slug":"c-young"},{"id":"65d2ed6bebf7bb9388ffa78e","name":"P. Taylor","slug":"p-taylor"},{"id":"65d2ed6bebf7bb9388ffa66a","name":"C. Anderson","slug":"c-anderson"}],"authorShowsEtAl":null,"edition":null,"publication":"Society for Mining, Metallurgy & Exploration","date":"08/2008","accessDate":null,"startPage":null,"volume":null,"footnoteNumber":115,"year":2008},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7eebf7bb9388ffaa71","path":"/citations/MM-116-122","slug":"MM-116-122","url":"https://doi.org/10.1007/s42461-021-00440-9","name":"Potential Pathways for Mining Operations to Transition to Renewable Energy — a Case Study","authors":[{"id":"65d2ed6bebf7bb9388ffa776","name":"O. W. Marsden","slug":"o-w-marsden"},{"id":"65d2ed6bebf7bb9388ffa70b","name":"J. W. Marsden","slug":"j-w-marsden"}],"authorShowsEtAl":null,"edition":null,"publication":"Mining, Metallurgy & Exploration ","date":"04/06/2021","accessDate":null,"startPage":1689,"volume":38,"footnoteNumber":116,"year":2021},{"__typename":"Platform_Citation","_schema":{"label":"Citation","pluralLabel":"Citations"},"id":"65d2ed7debf7bb9388ffa9fe","path":"/citations/MM-117","slug":"MM-117","url":"https://doi.org/10.1016/j.apenergy.2020.114506","name":"Copper mining: 100% solar electricity by 2030?.","authors":[{"id":"65d2ed6bebf7bb9388ffa6fc","name":"J. Haas","slug":"j-haas"},{"id":"65d2ed6bebf7bb9388ffa7b2","name":"S. Moreno-Leiva","slug":"s-moreno-leiva"},{"id":"65d2ed6bebf7bb9388ffa7cd","name":"T. Junne","slug":"t-junne"},{"id":"65d2ed6bebf7bb9388ffa77d","name":"P. Chen","slug":"p-chen"},{"id":"65d2ed6bebf7bb9388ffa6c0","name":"G. Pamparana","slug":"g-pamparana"},{"id":"65d2ed6bebf7bb9388ffa7fb","name":"W. Nowak","slug":"w-nowak"},{"id":"65d2ed6bebf7bb9388ffa7fa","name":"W. Kracht","slug":"w-kracht"},{"id":"65d2ed6bebf7bb9388ffa706","name":"J. M. Ortiz","slug":"j-m-ortiz"}],"authorShowsEtAl":null,"edition":null,"publication":"Applied Energy","date":"15/03/2022","accessDate":null,"startPage":114506,"volume":262,"footnoteNumber":117,"year":2022}],"feedEntries":[],"posts":[{"__typename":"Platform_Post","_schema":{"label":"Post","pluralLabel":"Posts"},"id":"65d2edbfebf7bb9388ffb092","name":"Are small modular nuclear reactors a viable  zero-emission power alternative?","slug":"are-small-modular-nuclear-reactors-a-viable-zero-emission-power-alternative","path":"/posts/are-small-modular-nuclear-reactors-a-viable-zero-emission-power-alternative","published":"2023-08-17T04:11:24.00","openGraph":{"image":{"thumbnails":{"bubble":{"url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_64/v1690317639/copper-alliance/banner/mm-34-banner_image__MM-34-8.7.pp59_cmyk_nf0fmu.jpg","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_128/v1690317639/copper-alliance/banner/mm-34-banner_image__MM-34-8.7.pp59_cmyk_nf0fmu.jpg"},"card":{"url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_480/v1690317639/copper-alliance/banner/mm-34-banner_image__MM-34-8.7.pp59_cmyk_nf0fmu.jpg","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_960/v1690317639/copper-alliance/banner/mm-34-banner_image__MM-34-8.7.pp59_cmyk_nf0fmu.jpg"}}}},"people":[]},{"__typename":"Platform_Post","_schema":{"label":"Post","pluralLabel":"Posts"},"id":"65d2edbfebf7bb9388ffb08e","name":"Ok Tedi’s hydroelectric plant","slug":"ok-tedis-hydroelectric-plant","path":"/posts/ok-tedis-hydroelectric-plant","published":"2024-12-17T13:57:46.30","openGraph":{"image":{"thumbnails":{"bubble":{"url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_64/v1690318282/copper-alliance/banner/mm-35-ok_image__MM-35-8.8.p60_pow3fz.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_128/v1690318282/copper-alliance/banner/mm-35-ok_image__MM-35-8.8.p60_pow3fz.webp"},"card":{"url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_480/v1690318282/copper-alliance/banner/mm-35-ok_image__MM-35-8.8.p60_pow3fz.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_960/v1690318282/copper-alliance/banner/mm-35-ok_image__MM-35-8.8.p60_pow3fz.webp"}}}},"people":[]}],"subTopics":[],"moderators":[],"innovations":[]}}},"pageContext":{"lang":{"id":"en","path":"","iso":"en","name":"English","label":"English"},"availableEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend","OrganisationType","HorizonType","Economy","FeedEntry","Video","Citation","Objective","ProfileType","ExpertiseLevel"],"detailEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend"],"site":{"id":"65d2edd1ebf7bb9388ffb0df","slug":"connect-ore","name":"ConnectOre","url":"https://connectore.org","title":"ConnectOre","twitter":null,"threads":null,"facebook":null,"linkedin":null,"instagram":null,"flickr":null,"tiktok":null,"youtube":null,"ownerName":"ICAA","recaptchaKey":"6LfG2J0qAAAAAHDCFfJnrWOj6DiWJGik5BAa_7p8","googleSiteVerification":null,"platformName":"ConnectOre","platformUrl":"https://platform.connectore.org","supportEmail":null,"contactEmail":null,"mainMenu":{"id":"65d2edaaebf7bb9388ffaf79","slug":"website-navigation"},"linearMenu":null,"entityViews":[{"id":"67528c24c135ebcfc668f1ba_65d2edd1ebf7bb9388ffb0df","name":"Value Chain","hash":"value-chain","label":null,"slug":"value-chain","count":0,"showCount":null,"disabled":null,"icon":{"id":"6752a61b8b51dfa7b77b1e37","name":"Connections Navigator Icon Glyph","slug":"connections-navigator-icon-glyph","component":"ConnectionsNavigatorIconGlyph"},"childEntityTypes":[{"id":"6667fa4ff794dd6e045135c1","name":"Value Chain Theme","internalName":"Trend"},{"id":"6667fa58f794dd6e045135c6","name":"Topic","internalName":"Topic"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"6757ef1ede8adbd45cf19474_65d2edd1ebf7bb9388ffb0df","name":"Bulletin Board","hash":"bulletin-board","label":null,"slug":"bulletin-board","count":0,"showCount":null,"disabled":null,"icon":{"id":"681c2cebbccc5a72d8382f31","name":"Tag Icon","slug":"tag-icon","component":"TagDotIconGlyph"},"childEntityTypes":[],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528d88c135ebcfc668f31b_65d2edd1ebf7bb9388ffb0df","name":"Innovations","hash":"innovations","label":null,"slug":"innovations","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528d74c135ebcfc668f315","name":"Innovation","internalName":"innovation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67625640fbc7c50d8644c592_65d2edd1ebf7bb9388ffb0df","name":"Community","hash":"community","label":null,"slug":"community","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528404c135ebcfc668ee1c","name":"Person","internalName":"Person"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528e1bc135ebcfc668f33a_65d2edd1ebf7bb9388ffb0df","name":"Stakeholder Map","hash":"stakeholder-map","label":null,"slug":"stakeholder-map","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"66680141f794dd6e0451367a","name":"Organisation","internalName":"Organisation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67529040c135ebcfc668f4ae_65d2edd1ebf7bb9388ffb0df","name":"References","hash":"references","label":null,"slug":"references","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"6752902fc135ebcfc668f4a4","name":"Article","internalName":"FeedEntry"},{"id":"67529039c135ebcfc668f4aa","name":"Citation","internalName":"Citation"},{"id":"67528de9c135ebcfc668f328","name":"Catalyst","internalName":"catalyst"},{"id":"67528df9c135ebcfc668f32d","name":"Page","internalName":"page"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]}],"entityAppViews":[],"entityOnboardingViews":[{"id":"680c3a4ebc80e4d0f3cfa2ef_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Step","hash":"trend-expertise-step","label":null,"slug":"trend-expertise-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Onboarding Grid","slug":"trend-expertise-onboarding-grid","label":null,"updated":"2025-04-26T01:42:10.20","layout":{"id":"680c3993bc80e4d0f3cfa2dd","name":"Slice Onboarding Trend Expertise Grid","slug":"slice-onboarding-trend-expertise-grid","component":"SliceLayoutOnboardingTrendExpertiseGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":null,"titleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_titleRich","text":"Are you **an industry expert** in any of these Value Chain Themes?"}}]},{"id":"680c3a85bc80e4d0f3cfa2fa_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Step","hash":"profile-types-step","label":null,"slug":"profile-types-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Onboarding Grid","slug":"profile-types-onboarding-grid","label":null,"updated":"2025-04-26T01:44:34.63","layout":{"id":"680c3a13bc80e4d0f3cfa2e4","name":"Slice Onboarding Profile Types Grid","slug":"slice-onboarding-profile-types-grid","component":"SliceLayoutOnboardingProfileTypesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"Which best describes you?","titleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]},{"id":"680c3aaabc80e4d0f3cfa2ff_65d2edd1ebf7bb9388ffb0df","name":"Objectives Step","hash":"objectives-step","label":null,"slug":"objectives-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df","name":"Objectives Onboarding Grid","slug":"objectives-onboarding-grid","label":null,"updated":"2025-04-26T01:45:12.76","layout":{"id":"680c3a3fbc80e4d0f3cfa2ea","name":"Slice Onboarding Objectives Grid","slug":"slice-onboarding-objectives-grid","component":"SliceLayoutOnboardingObjectivesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"What are your priority objectives?","titleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]}],"gptLanguages":[{"id":"65d2eda5ebf7bb9388ffaf1f","name":"English","slug":"english","iso":"en","locale":"en_US","path":"/en","label":"English","menuLabel":null},{"id":"666f70b6e051ad9ef086d1be","name":"Arabic","slug":"arabic","iso":"ar","locale":"ar_AE","path":"/ar","label":"عربي","menuLabel":null},{"id":"666f7161e051ad9ef086d1c4","name":"Spanish","slug":"spanish","iso":"es","locale":"es_ES","path":"/es","label":"español","menuLabel":null},{"id":"666f71c9e051ad9ef086d1c8","name":"German","slug":"german","iso":"de","locale":"de_DE","path":"/de","label":"Deutsch","menuLabel":null},{"id":"65d2eda5ebf7bb9388ffaf20","name":"French","slug":"french","iso":"fr","locale":"fr_FR","path":"/fr","label":"Français","menuLabel":null}],"gptQuestionTemplate":{"id":"662c7f6e81ef1920e3638518","name":"Standard Open Question","slug":"standard-open-question","path":"/prompt-templates/standard-open-question","__typename":"PromptTemplate","_entityTypeName":null,"label":"CopperAI","type":{"id":"662c7f1981ef1920e363850f","name":"Ask","slug":"ask"},"description":{"text":"This template is tailored for providing accurate responses based on specific context. It integrates contextual details from \"contextual information\" and addresses the \"target question\". The response is always in English, prioritizing clarity. If the answer is unknown, the template openly acknowledges this, ensuring honesty and avoiding speculation. This format is ideal for precise, context-sensitive, and truthful answering."},"summary":{"text":"Ask a general question about Website content"},"gptModel":{"id":"67564c4f2f6749787d0e03dc","name":"OpenAI GPT 4o","slug":"open-ai-gpt-4-o","dataSetId":"openai:gpt-4o"},"variablesPrompt":{"text":""},"submitLabel":"Ask","languages":[],"icon":{"id":"67528b9cc135ebcfc668f1a3","name":"AI Lower Case Icon Glyph","slug":"ai-lower-case-icon-glyph","component":"AiLowerCaseIconGlyph"},"variables":[{"id":"6668076bf794dd6e045138d9","name":"question","slug":"question","useVectorStore":true,"label":"What would you like to know?","labelAnother":null,"help":{"text":""},"options":{"text":""},"defaultValue":null,"entityTypes":[],"controlType":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"},"labelContextual":null,"labelAnotherContextual":null,"helpContextual":{"text":""},"optionsContextual":{"text":""},"defaultValueContextual":null,"entityTypesContextual":[],"controlTypeContextual":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"}}]},"advertisements":[],"logoVerticalOffset":null,"logoHorizontalOffset":null,"logoVerticalOffsetMobile":null,"logoHorizontalOffsetMobile":null,"logoVerticalOffsetTablet":null,"logoHorizontalOffsetTablet":null,"logoVerticalOffsetDesktop":null,"logoHorizontalOffsetDesktop":null,"logoHeightMobile":44,"logoHeightTablet":null,"logoHeightDesktop":null,"headerHeightMobile":null,"headerHeightTablet":null,"headerHeightDesktop":null,"logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807465/copper-connect/site/copper-connect_logo__CopperOre_Master_Brand_Identity-colour_cd4vgg.webp","type":"image/webp","width":945,"height":266},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807452/copper-connect/site/copper-connect_logoInverted__CopperOre_Master_Brand_Identity-white_chnucx.webp","type":"image/webp","width":945,"height":266},"footerMenu":null,"footerSecondaryMenu":null,"footerContent":{"text":"© {year} ConnectOre. All Rights Reserved\n"},"creator":null,"poweredBy":{"id":"65d2edadebf7bb9388ffafc8","name":"Shapeable","slug":"shapeable","url":"https://shapeable.ai","logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1674010034/platform/organisation/shapeable_logo__shapeable.png","type":"image/png","width":1174,"height":368},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1729474494/copper-connect/organisation/shapeable_logoInverted__shapeable-logo-inverted_sdcfpk.png","type":"image/png","width":392,"height":118},"logoSubtle":null},"poweredByLabel":null,"poweredByContent":{"text":""},"explorerPage":{"name":"Explorer","title":null,"slug":"explorer","path":"/explorer"},"termsPage":{"name":"Terms of Use","title":null,"slug":"terms-of-use","path":"/terms-of-use"},"homePage":null,"knowledgeHubPage":{"name":"News","title":null,"slug":"news","path":"/news"},"privacyPolicyPage":{"name":"Privacy Policy","title":null,"slug":"privacy-policy","path":"/privacy-policy"},"summary":{"text":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action"},"thumbnail":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"},"openGraph":{"title":"ConnectOre","date":"2026-07-31T04:44:47.80","description":{"plain":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action\n"},"image":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png","type":"image/png","thumbnails":{"full":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"}}}},"termsAndConditions":{"text":""},"privacyPolicy":{"text":"At ConnectOre we respect your privacy. We want to ensure that you get the information, content, and experiences that matter most to you. ConnectOre is committed to protecting the privacy of its stakeholders, communities, and other contacts.\n\n## Scope\n\nThis privacy policy applies to all personal data processed by full-time and part-time employees, volunteers when acting on behalf of ConnectOre contractors and partners doing business on behalf of ConnectOre, as well as all legal entities, all operating locations in all countries, and all business processes conducted by ConnectOre.\n\n## Information Collected\n\n#### What information do we collect?\n\nConnectOre collects the following personal data in line with the use purposes explained in a subsequent section:\n\n  * Your name and contact details\n  * Online profile data/usage\n  * Contact information\n  * Social media profile information\n  * Education and professional information\n  * Registration and participation in ConnectOre events and activities \n  * Information about service usage\n  * Cookies\n  * Authentication data\n  * Location information\n  * Author and peer review information\n  * Other information you upload or provide to us\n\n#### How do we use your information?\n\nConnectOre uses (and, where specified, shares) your personal information for the following purposes:\n\n  * To provide support or other services. ConnectOre may use your personal information to provide you with support or other services that you have ordered or requested. ConnectOre may also use your personal information to respond directly to your requests for information, including registrations for webinars, or other specific requests, or pass your contact information to the appropriate ConnectOre supplier or reseller for further follow-up related to your interests.\n  * To provide information based on your needs and respond to your requests. ConnectOre may use your personal information to provide you with notices of new product releases and service developments.\n  * To administer products. ConnectOre may contact you if you make use of (digital) products we offer, to confirm certain information (for example, that you did not experience problems in a download process). We may also use this information to confirm compliance with licensing and other terms of use and may share it with your company/institution.\n  * To assist in your participation in ConnectOre activities. ConnectOre will communicate with you, if you are participating in certain ConnectOre activities such as ConnectOre Summit, authoring or reviewing a ConnectOre article, or ConnectOre humanitarian activities. ConnectOre may send you information such as update messages related to those activities (such as but not limited to the event's content, and event logistics)\n  * To update you on relevant ConnectOre events and opportunities. ConnectOre may communicate with you regarding relevant ConnectOre events and opportunities.\n  * To protect ConnectOre content and services. We may use your information to prevent potentially illegal activities and to enforce our terms and conditions.\n  * To get feedback or input from you. In order to deliver products and services of most interest to our stakeholders, from time to time, we may ask you to provide us input and feedback (for example through surveys).\n\n#### How can you control your information?\n\nYou can control the information we have about you and how we use as follows:\n\n  * If you are a registered guest for ConnectOre Annual Summit 2021, any request for review, revise or correction of your personal data can be sent to john.fennell@copper.com.au specifying your request.\n\n#### Personal data about minors and children\n\nConnectOre does not knowingly collect data from or about children under 16 without the permission of parent(s)/guardian(s). If we learn that we have collected personal information from a child under 16, we will delete that information as quickly as possible. If you believe that we might have any information from or about a child under age 16, please contact us.\n\n#### How will you know if the Privacy Policy is changed?\n\nConnectOre may update its Privacy Policy from time to time. If we make any material changes you will be notified by means of a notice on our website prior on the date the change becomes effective. We encourage you to periodically review this page for the latest information on our privacy practices.\n\n## Technical And Regulatory Information\n\n#### Logging practices\n\nConnectOre automatically records the Internet Protocol (IP) addresses of visitors. The IP address is a unique number assigned to every computer on the internet. Generally, an IP address changes each time you connect to the internet (it is a \"dynamic\" address). Note, however, that if you have a broadband connection, depending on your individual circumstance, the IP address that we collect may contain information that could be deemed identifiable. This is because, with some broadband connections, your IP address doesn't change (it is \"static\") and could be associated with your personal computer.\n\nAs well as recording the IP addresses of users, ConnectOre may also keep track of sites that users visited immediately prior to visiting ConnectOre's website and the search terms they used to find it. We keep track of the pages visited on ConnectOre's website, the amount of time spent on those pages and the types of searches done on them. Your searches remain confidential and anonymous. ConnectOre uses this information only for statistical purposes to find out which pages users find most useful and to improve the website.\nConnectOre also captures and stores information that you transmit. This may include:\n\n  * Browser/Device type/version\n  * Operating system used\n  * Media Access Control (MAC) address\n  * Date and time of the server request\n  * Volume of data transferred\n\n#### External links behaviour\n\nSome of the links on ConnectOre's websites link to other sites created and maintained by other public- and/or private-sector organizations. ConnectOre provides these links solely for your information and convenience. When you transfer to an outside website, you are leaving ConnectOre domain, and ConnectOre's information management policies no longer apply. ConnectOre encourages you to read the privacy statement of each external website that you visit before you provide any personal data.\n\n#### Cookies and web beacons\n\nCookies and web beacons are electronic placeholders that are placed on your device by websites to track your individual movements on that website over time. ConnectOre uses both session-based cookies (which last only for the duration of the user's session) and persistent cookies (which remain on your device and provide information about the session you are in and waits for the next time you use that site again).\n\nThese cookies and web beacons provide useful information to ConnectOre, enabling us to recognize repeat users, facilitate the user's access to and use of our sites, allows us to track usage behavior, and to balance the usage of our websites on all ConnectOre web servers.\nTracking cookies, third-party cookies, and other technologies such as web beacons may be used to process additional information, enable non-core functionalities on ConnectOre website and enable third-party functions (such as a social media \"share\" link). We may also include web beacons and other similar technology in promotional email messages to determine whether the messages have been opened.\n\n#### Do Not Track (DNT)\n\nThe online advertising industry has self-regulatory initiatives designed to provide consumers a choice in the types of ads they may see online and to conveniently opt-out from online behavioral ads served by some or all of the companies participating in these programs. Our websites do not respond to DNT consumer browser settings.\n\n#### Responses to legal requests\n\nConnectOre reserves the right to share your information to respond to duly authorized information requests of governmental authorities or where required by law.\n\n#### Your data rights\n\nConnectOre complies with all applicable data privacy laws and regulations including, but not limited to, the General Data Protection Regulation (GDPR) and the California Consumer Privacy Act (CCPA). Under these laws and regulations, you may have certain rights to your data. Should you wish to exercise any of these rights, please send an email request to john.fennell@copper.com.au with \"Data Privacy Request'' in the subject line and in the email please identify the specific privacy right you request assistance with. Please note additional information may be requested prior to fulfilling a request and that ConnectOre reserves the right to charge a fee, where permitted, to cover the cost of certain requests.\n\n#### How do I contact you if there is an issue?\nIf you have any questions or concerns about this Privacy Policy or about the use of your personal information, please feel free to contact us by email at john.fennell@copper.com.au"},"welcomeUrl":"https://connectore.org/app/welcome","welcomeTitle":"Welcome to ConnectOre and thanks for joining us! ","invitationAction":"join the ConnectOre community","setupCompletionMessage":null,"languages":[],"brandColors":[],"showLogin":true,"showShareMenu":null,"showFollowMenu":true,"showPlatformLogin":null,"showContactUs":null,"loginLabel":"Explorer Login","platformLoginLabel":"Community Platform","headerButtons":[]},"includeProfile":true,"disableProfileEditing":false,"dynamicEntityTypeNames":["Person","Organisation"],"profilePath":"/app/profile","welcomePath":"/app/welcome","id":"65d2eddfebf7bb9388ffb1fd","slug":"renewable-energy-adoption-1","entityPath":"/topics/renewable-energy-adoption-1","openGraph":{},"entityTypeName":"Topic","name":"Renewable Energy Adoption","updated":"2024-12-18T22:51:16.31","__type":"Topic"}},
    "staticQueryHashes": ["1044227382","1158597448","1242646999","1427075558","1452322194","1520036161","1545705019","1586309863","1606754935","1816168740","1864381666","1903214493","1945056504","1989845544","2034981229","2181044613","2409034939","2463401854","2526615987","2642656775","2862279633","2867243664","2910164142","2912920178","296816903","3073584486","3150399266","3172506128","3320076387","3447680494","3453148481","3624873332","364221563","3692255024","3778988535","3782604890","4091857177","4216505212","591477963","701411134","758936535","80004486","857137463","881103158"]}