{
    "componentChunkName": "component---src-gatsby-entities-topic-tsx",
    "path": "/topics/grade-engineering-studies",
    "result": {"data":{"platform":{"topic":{"id":"65d2eddfebf7bb9388ffb1f5","name":"Grade Engineering Studies","slug":"grade-engineering-studies","typeLabel":"Topic","badge":null,"path":"/topics/grade-engineering-studies","updated":"2024-12-20T04:53:24.27","__typename":"Platform_Topic","_schema":{"label":"Topic","pluralLabel":"Topics"},"openGraph":{"id":"openGraph_topic/grade-engineering-studies","title":"Grade Engineering Studies","description":{"plain":"Sub topics\n  \n\n\n\nFramework for Evaluation of preconcentration Strategies\nThe following framework has been used to quantify the economic and environmental impacts of preconcentration techniques at numerous metalliferous operations. The framework was also applied to quantify the impacts of mine to mill strategies and the adoption of new processing technologies at operations.\nThe framework consists of:\n\nCharacterisation of preconcentration responses;\ngeometallurgy and spatial modelling;\nprocess design and simulation;\nStrategic mine planning; and\nStrategy evaluation.\n\nThe interactions of the framework in the quantification of the economic and environmental impacts of preconcentration are presented in the figure below.\n\nFramework for the quantification of economic and environmental impacts of preconcentration\nCharacterisationCharacterisation\nCharacterisation of preconcentration responses throughout the geometallurgical domains of a deposit provides the foundation for technoeconomic evaluation of preconcentration techniques. The process of characterising preconcentration responses requires a combination of laboratory test work and grade heterogeneity modelling to quantify the strength of the drivers for each separation technique.\nCharacterisation of Natural Deportment\nCharacterisation of the natural deportment response throughout the deposit requires testwork performed at drill core and bulk scales. Intact diamond drill core or coarse assay rejects are used to quantify the natural deportment response in future ore to be mined. The sampling campaign should cover the rock types, grade ranges and spatial distribution of material within, and just outside, the planned mining extents, biasing the next 5-10 years of production. Intact drill core is crushed to -3.5 mm and screened through a series of sieves with the aim to produce five to six size fractions of similar mass for assay.\nBulk samples are used to determine the production scale natural deportment response of material. These samples may be taken from belt cuts or ROM material and are therefore limited to the material currently exposed or in stockpiles. Bulk samples provide an indication of the scale-up factor required to convert diamond drill core responses to production scale responses. The bulk samples are screened into five to six different size fractions of similar mass and each size fraction is assayed.\nThe assay results of the size fractions, for bulk and drill core samples, can be viewed as a plot of cumulative mass (or percent passing) versus upgrade factor (the grade of the undersize relative to the head grade of the sample) to assess the strength of the natural deportment response. A linear relationship often exists between the natural log of the upgrade factor and the negative natural log of cumulative mass. The slope of this linear relationship can be used to derive a single metric to describe the strength of the natural deportment response. This single metric can be used to quantitively rank the strength of natural deportment responses in different rock types or deposits. It can also be used to interpolate the natural deportment response throughout the resource model to assist in the optimisation of the strategic mine plan with preconcentration by screening.\nCharacterisation of Induced Deportment\nCharacterisation of the Induced deportment response requires assessment of the natural deportment response, analysis of in-situ grade heterogeneity and engineering of a bimodal blast fragmentation.\nThe in-situ grade heterogeneity is assessed at a  blast hole  scale using a combination of retrospective data from  blast hole  assays and forward-looking geostatistical estimates from  resource drilling .  Blast hole   assays provide a high-resolution, 2-dimensional data set that can be combined with grade control polygons to identify specific areas where high or low-grade pockets of material were sent to the incorrect destination due to limitations in the selective mining unit (SMU). These areas can then be assessed for induced deportment response by altering the blast design to achieve finer fragmentation in high-grade and coarser fragmentation in low-grade. Modelled blast fragmentations, natural deportment response and screen aperture size are used to derive the grade and mass of screen oversize and undersize and characterise the Induced deportment response.\nForward-looking estimates of Induced deportment responses require geostatistical estimation of In-situ grade heterogeneity at a blast hole separation scale. Uniform conditioning (UC) is used to estimate the probability of a blast hole burden and spacing volume being above a series of cut-off grades within a panel of material in the resource model. This estimate is combined with different cut-off grades for high and low-energy blast fragmentation, screen aperture sizes and the natural deportment response to estimate the Induced deportment response throughout the resource model. However, UC estimates do not provide the exact spatial location of In-situ heterogeneity but rather an estimate of the average In-situ heterogeneity present for the kriged grade of the panel within the estimation domain. Therefore, the use of the estimated Induced deportment response using UC estimates of In-situ grade heterogeneity should be restricted to long-term, Strategic mine planning decisions. These decisions are based on larger mining volumes that are more likely to reflect the average estimated response.\nThe aim of the bimodal blast fragmentation is to achieve the greatest difference in the particle size distribution (PSD) between coarse and fine blast fragmentation to provide the highest separation potential by screening. The results are dependent on the physical rock characteristics and blast design parameters including burden and spacing, hole diameter and charge. Adjustments to blast design parameters are often limited to the charging of holes, as grade heterogeneity of a blast is not confirmed until the blast hole chips are assayed. However, the greatest opportunity to create a wide differential between coarse and fine blast PSDs is through burden and spacing of blast holes. Predictive models using the blast hole data of the bench above and infill drilling can be used to inform adjustments to burden and spacing ahead of time. Alternatively, measure while drilling (MWD) data and real-time grade measurements using sensors on drill chips may be used to inform a change in drill pattern in real time.\nCharacterisation of Bulk Ore Sorting\nCharacterisation of the bulk ore sorting response requires estimation of the grade heterogeneity delivered to the sensor at a scale reflecting the separable parcels size of the sorting system and an estimate of sensor and mechanical separation performance. In-situ grade heterogeneity can be estimated using UC, as described in characterisation of Induced deportment, using a separation volume approximating the separable parcel size. However, UC has been shown to have limitations in the estimation of In-situ grade variability present at very small separation units, including truck and shovel volumes.\nWhile the In-situ grade heterogeneity of a separable parcel of material can be estimated using geostatistical techniques, the process of mining, loading, transporting and crushing the material prior to presentation of the material to a sensor can significantly reduce measured heterogeneity and the bulk ore sorting response. Modelling the impact of mixing in each stage of mining and material handling is a critical focus to support desktop bulk ore sorting evaluations. Currently, empirical measurements of grade heterogeneity present in separable parcels of material at the point of deployment may provide the best estimation of the delivered heterogeneity to the sensor. In the absence of empirical data, the impact of mixing on In-situ grade heterogeneity estimates can be examined through sensitivity analysis.\nSensor and separation performance of the bulk ore sorting system can be examined using anticipated or measured accuracy and precision results for the sensor technology and modelling of mechanised sorting efficiency. The combined impact of delivered heterogeneity, sensor performance and separation performance can be modelled using discrete event simulation to estimate production scale bulk ore sorting response. This response can then be linked to either insitu grade heterogeneity estimates or material classifications within domains to interpolate a bulk ore sorting response in the resource model.\nCharacterisation of particle sorting\nCharacterisation of the particle sorting response requires measurements for the grade distribution of particles  present in discrete size fractions of crushed and screened material, the performance of the sensor technology and mechanical separation and the natural deportment response. The grade distribution of particles  within different size ranges can be determined through laboratory assay. These assays can be used to provide a theoretical particle sorting response in the absence of particle sorting test work.\nThe combined sensor and mechanical separation performance of particle sorters can be examined using supplier testing services. This service uses a particle sorter to test a sample from the mine using different sensors. The particles  are marked to indicate which stream they reported to with each sensor then each particle is weighed and assayed. The assay results and sorting performance can then be used to determine the particle sorting response for each sensor technology.\nparticle sorting requires screening to prepare a specified particle size range to feed the particle sorter. To determine and optimise the integrated particle sorting and screening response of the material, the natural deportment response is required to estimate the grade of the screen undersize. The combined estimates for particle sorting response and natural deportment screening response can be used to characterise the upgrade response of material with particle sorting.\nCharacterisation of Coarse Gravity separation\nCharacterisation of the coarse gravity response requires laboratory testwork and the natural deportment response. Laboratory and large scale testwork can be used to examine separation performance for dense media separation and inline pressure jigs. Samples from the mine are treated in different densities of media or at different inline pressure JIG settings and the float and sink streams are assayed to evaluate and optimise gravity separation performance.\nIn mineral processing,   coarse  gravity separation requires pre-treatment by crushing and screening to produce a consistentPSD in the feed and to remove fines. Therefore, the upgrade from coarse gravity separation must also consider the natural deportment response of the fines. An example from an operation where the upgrade to fines is as significant as the upgrade from the inline pressure JIG is provide by.\nGeometallurgy and Spatial Modelling\nInterpolation of preconcentration responses in the resource model require assessment of suitable geometallurgy domains and selection of an appropriate geostatistical estimation method. There is often insufficient data for the development of specific preconcentration domains during early stages of preconcentration evaluations. In these cases, natural deportment and laboratory measured preconcentration responses may be interpolated in the resource model using the current estimation methodology for geometallurgical parameters at the operation. Estimates for In-situ grade heterogeneity using UC modelling (as discussed in the characterisation of Induced deportment and bulk ore sorting responses) should also follow the current estimation domains and search parameters for the operation.\nGeostatistical estimation methods range in sophistication from simple inverse distance weighting methods to complex multi indicator kriging or conditional simulations. In the absence of adequate spatial data regarding the preconcentration responses, minimal estimation techniques or domanial averages should be applied. As greater knowledge of the preconcentration response develops, more sophisticated estimation methods provide greater control for the population of the preconcentration response in the resource model.\nProcess Design and Simulation\nprocess design and simulation considers the integration and interactions of preconcentration techniques with the existing infrastructure and processing facilities of the operation. process design and simulation is an iterative activity that alternates with the optimisation of preconcentration strategies within the strategic mine plan. \nProcess Design\nprocess design assesses the equipment requirements, plant layout and material handling strategies for given rock characteristics and capacities to develop an operationally capable preconcentration circuit. During early stages of preconcentration evaluations, several preconcentration designs are developed at a range of preconcentration capacities. These designs provide an understanding of how operational and capital costs change with preconcentration capacity to assist optimisation of preconcentration strategies in the strategic mine plan.\nprocess designs may include fixed, semi-mobile or mobile deployment options. Fixed options have a higher capital cost and lower operating cost and are best suited to a constant production capacity over a longer period. At the other end of the spectrum, mobile options have a lower capital cost and higher operating cost and offer flexibility to increase or decrease production capacity over shorter periods. Mobile or semi-mobile preconcentration plants are ideally suited to Production Trials for preconcentration techniques and initial implementation.\nprocess design governs the operating and capital costs for preconcentration techniques and the location of the preconcentration plant can have a large influence over both costs. The largest operating cost associated with bulk preconcentration techniques is the rehandling of product streams. Selecting a location that minimises product rehandle for one or more product streams can greatly reduce the operational costs of preconcentration. Furthermore, integrating preconcentration within existing material handling transfer or decision points can eliminate rehandle for one or more product streams, greatly reducing operating and capital costs for preconcentration. Critical locations to consider are:\n\nClose to the primary crusher, to allow the upgraded product stream to tie into the coarse ore stockpile conveyor;\nAt waste storage facilities or deferred stockpiles, to minimise rehandle of the downgraded product stream;\nAt pit exits or in the mine, to minimise deviations in haulage or handling distances to and from the preconcentration plant; and\nAt the mine face, ideally between or within digging and loading activities to eliminate product rehandling.\n\nProcess simulation\nProcess simulation is used to assess the impact of preconcentration techniques on downstream production processes. These impacts depend on the preconcentration technique. preconcentration by screening alter the particle size distribution in feed to the processing plant, often resulting in increased capacity in the comminution circuit which may be used to increase throughput or optimise grinding conditions to improve recovery. All preconcentration techniques can increase the grade of the feed to the processing plant which can improve flotation recovery.\nProcess modelling and simulation is performed using the Integrated Extraction Simulator (IES). IES is a cloud-based simulation covering the comminution and beneficiation activities of the entire operation from drilling and blasting through to final concentrate. IES incorporates the ability to simulate the processing performance of multiple ore types, optimise process settings to maximise plant performance within specified constraints and to perform mass simulation and write responses back to the resource model.\nStrategic Mine Planning\nOptimisation of the strategic mine plan provides a holistic approach to capture all impacts of new technologies and operational strategies deployed across the mining value chain, over the entire life of the operation. The optimisation is value driven, with the primary objective to maximise net present value within specified operational and processing constraints. For these reasons, optimisation of the strategic mine plan is the preferred method to evaluate preconcentration techniques.\nInputs into Strategic mine planning include the resource model and operational parameters, constraints and economic assumptions. From these inputs, the value of each block in the resource model is calculated for each processing destination including waste storage facilities. The maximum value of the block is assigned, and the Lerchs-Grossman algorithm is applied to develop a series of nested shells by adjusting the revenue factor applied to each block. These nested shells provide guidance to the selection of the ultimate pit and design of phases to be mined. The material can then be scheduled, and cut-off optimised, for all processing destinations in the operation.\nThe inclusion of preconcentration techniques offer flexibility and opportunity for optimisation in their application and operational settings, such as screen aperture or sorting cut-off. These options can be included in the optimisation of the strategic mine plan in much the same way trade-offs between throughput and recovery with grind size have traditionally been assessed. The figure below shows the interaction of operational decisions for preconcentration and process plant settings that can be optimised in the strategic mine plan.\nOnce an optimal schedule and cut-off grade policy is produced, the resultant material movement and cashflow provides the best estimate of economic benefits relating to the scenario modelled. In addition, the material movements can be combined with power, fuel, steel and water consumption (from process and haulage models) to provide environmental metrics relating to planned production and quantity the waste rock and tailings generated. A comparison of the strategic mine plan with and without preconcentration techniques provides a robust quantification of anticipated economic and environmental impacts due to preconcentration.\nComplete strategic mine plan optimisations for preconcentration techniques have been performed with Whittle Consulting Enterprise Optimisation, Geovia Whittle™, COMET Strategy and COMET Scheduler and Datamine NPV Scheduler. However, due to the magnitude of work involved in performing a complete mine optimisation, early opportunity assessments for preconcentration techniques are performed within the operation’s existing ultimate pit and phases. These evaluations operate under the presumption that if sufficient value can be found within the existing mine design, performing a complete Strategic mine planning optimisation will only unlock greater value.\n\nInteraction of preconcentration and process plant settings optimised in the strategic mine plan.\nPreconcentration Impact on Operational Capacities\nOptimising the strategic mine plan requires balancing constraints to the rate of production imposed by mining, processing and marketing capacities. preconcentration introduces an additional capacity to optimise that increases the effective processing capacity of an operation and changes the economic value of material, increasing the quantity of ore mined. As a result, the optimal balance between mining, processing, marketing and preconcentration capacities must be established and there may be a need to increase mining and marketing capacities.\nThe requirement for additional mining capacity with preconcentration is necessary for operations that are, or become, mining constrained. Generally, this is the optimal configuration for underground metalliferous mines where mining capacity is the most capital-intensive constraint on production. As a result, the opportunity cost of production raises the cut-off for mined material and encourages the use of highly selective mining methods. Optimal preconcentration strategies will seek to relieve the pressure on mining bottlenecks by preconcentrating material prior to the constraining activity, such as the preconcentration of ore prior to an underground hoist. As a result, greater capacity in downstream mining activities are required to maintain the quantity of ore processed. preconcentration may also unlock greater value in mining constrained operations by enabling a transition to lower-cost, less selective mining methods, simultaneously increasing resource utilisation and the quality of ore sent to processing destinations.\nConversely, the requirement for additional mining capacity with preconcentration is less prevalent in operations that are processing constrained. Generally, this is the optimal configuration for open-pit metalliferous mines where processing capacity is the most capital-intensive constraint on production. As a result, the opportunity cost of production raises the cut-off applied to processing, generating an excess quantity of economic ore from the mine. This excess ore is often deferred to stockpiles or allocated to lower-value processing destinations, such as dump leach. The increase in effective processing capacity with preconcentration allows a greater quantity of ore to be treated as it is mined, reducing the quantity of material stockpiled or processed at a lower-value destination. This accelerates both the quantity of metal and the cashflow produced by the operation, significantly increasing NPV.\nStrategy Evaluation\nStrategy evaluation involves sensitivity, scenario and simulation modelling to find the optimal preconcentration strategy and understand the value drivers for that strategy.\nSensitivity analysis is used to flex individual assumptions regarding preconcentration performance and costs to understand the impact each assumption has on the value proposition. This information is useful in early opportunity assessments to identify critical assumptions for detailed examination in the next stage of evaluation.\nScenario analysis examines the effect of multiple simultaneous changes to preconcentration assumptions. Common examples of scenario analysis applied to preconcentration evaluations include the assessment of:\n\nDifferent individual or combinations of preconcentration techniques;\nDifferent deployment capacities and locations for preconcentration techniques; and\nStaging of capital and scaling-up of preconcentration capacity.\n\nSimulation analysis assigns probabilistic distributions to uncertain variables and through repeat analyses determines the probabilistic range of likely outcomes. During the evaluation of preconcentration techniques, simulation analysis is best suited to examine the impact of uncertainty in the modelled preconcentration responses. However, due to the magnitude of work involved, simulation analysis may be applied during detailed feasibility studies for deployment options of the selected preconcentration technique(s).\nProject Evaluation Stages\nThe time, personnel and investment required to examine new technologies and strategies to deploy at an operation can be substantial. A capital investment model is used to assist in focussing a company’s limited resources on the examination of the highest value options for an operation. This model uses a stage-gate approach to progress the most promising options and strategies from conception to operation at site. CRC ORE have followed this approach to apply the framework for evaluation of preconcentration strategies at varying levels of detail to the different stages of project evaluation. A description of the different project evaluation stages is provided in the following Table. \n\n\n\nProject Stage\nDescription\n\n\n\nopportunity assessment\nBroad assessment of all available options, preliminary ranking by order of magnitude valuation and identify critical assumptions that require further examination.\n\n\nconcept study\nTop ranked options and critical assumptions identified in the opportunity assessment are assessed in greater detail to provide higher confidence in their ranking and valuation.\n\n\nProduction Trial\nTop ranked option(s) from concept study are demonstrated at pilot scale to prove concept in production environment and confirm critical assumptions.\n\n\npre feasibility study\nDetailed assessment of successful options trialled including alternative designs and layouts, capacities and deployment strategies, detailed risk assessment and identify best strategy for feasibility study.\n\n\nfeasibility study\nDetailed assessment of the selected strategy including definitive designs and cost estimates, environmental and social impact assessments and permitting, licensing and supply contracts for final approval to invest and implement the strategy.\n\n\nImplementation\nCommission selected strategy, optimise performance and integrate within production.\n\n\nOperation\nMonitor and sustain performance within production.\n\n\nResults and Discussion\nThe following results represent a compilation of 32 Grade Engineering® evaluations performed across fifteen sites using the framework described in this paper. The following Table provides relevant information regarding the project, commodities, preconcentration techniques examined, whether the evaluation considered the full or partial optimisation of the strategic mine plan and the change in the NPV for each preconcentration option. The relative change in NPV is also displayed in the Figure below.\n    \n\nChange in NPV with preconcentration for 32 evaluations across fifteen operations\nThe evaluations are dominated by preconcentration screening assessments and bulk ore sorting assessments. The results show a wide range of possible economic outcomes can be achieved with preconcentration , including the fact that not all orebodies are amenable to certain preconcentration techniques.\nThe average improvement in NPV was 12.8% across all preconcentration techniques; screening techniques showed an average increase of 12.8% NPV and bulk ore sorting 17.0% NPV. Partial optimisation of the strategic mine plan yielded an average increase of 9.3% NPV, while a full optimisation returned 18.5% NPV. These results highlight the additional value from preconcentration that is unlocked with a complete optimisation of the strategic mine plan.\nThe Figure below presents a boxplot of selected production and environmental metrics for twelve preconcentration screening and bulk ore sorting options across six operations. Not all evaluations presented in the Table above have been examined for changes in environmental metrics.\nThe results show a wide range of outcomes in production and environmental metrics are possible. The impact that preconcentration has on the quantity of ore processed and tailings and waste rock generated is often ambiguous. Significant increases in these metrics are possible with the expansion of the ultimate pit as a result of preconcentration. Similarly, a reduction in waste rock is possible with increases in ore processed and tailings generated due to a significant lowering of the economic cut-off with preconcentration and little opportunity to expand the ultimate pit. In all scenarios examined, preconcentration increased the grade of ore treated and the total metal recovered from the orebody, indicating greater resource utilisation is achieved with preconcentration.\nThe results also show significant decreases in the energy, emission, water and steel intensity of metalliferous production are possible with preconcentration. These intensities of production represent the change in the energy, water and steel consumed, and emissions generated, relative to the production of a unit of metal output. On average, a 6% reduction in energy intensity, 8% reductions in emission and water intensities, and a 11% reduction in the steel intensity of comminution resulted from preconcentration. These figures represent the inputs directly consumed by the operation and do not account for embedded energy, emissions and water in inputs consumed.\nFurthermore, the results show that preconcentration strategies were able to more than offset the increased energy, water, emission and steel requirements with additional metal production in scenarios where the quantity of ore processed significantly increased.\n\nBoxplot of production and environmental metrics for twelve preconcentration options across six operations\nPreconcentration at Greenfield projects\nGreenfields projects have greater flexibility to alter site layouts and adjust operational capacities to capture the full benefits provided by preconcentration. However, there is less ability to trial and test preconcentration techniques at Greenfield projects, often creating greater uncertainty whether to invest in preconcentration strategies for Greenfield projects. In the results presented in Table 2, preconcentration options applied to Greenfield projects returned an average increase of 16.1% NPV, while Brownfield projects returned an average increase of 11.2% NPV with preconcentration. The largest increase in NPV from the 32 evaluations presented in Table 2 was also a Greenfield project (6C) and provides an excellent example of the additional benefits that can be achieved by altering site layouts and mine designs for preconcentration.\nThe project is evaluating the development of an intrusive-hosted, structurally controlled stockwork gold and silver deposit. The orebody lends itself to development as three open pits to be processed by SABC comminution, flotation, CIL and electrowinning circuits. The operation is processing constrained and stockpiles a significant portion of lower-value ore at a central location between the three pits. The stockpiled ore will be reclaimed and processed toward the end of the mine’s life.\nAlthough the project is profitable, feasibility studies failed to achieve a threshold return for investment. preconcentration techniques, including screening and dense media separation, were examined to improve the economics of the operation. natural deportment testwork from drill core samples across the three pits revealed a consistent, very high upgrade signature in fines throughout the orebody. Bulk samples taken from a mining adit through the main pit were screened and assayed to confirm the very high natural deportment response was present at ROM PSD. Strategic mine planning used the natural deportment testwork to reoptimise pits, phases and site layouts with preconcentration by screening. The study found:\n\nThe optimal preconcentration strategy sent high-grade ore directly to the processing plant and upgraded lower-value ore through the screening plant;\npreconcentration enabled a significant expansion of the ultimate pits and increased resource utilisation;\nLowering the mining cut-off grade by 50%,\nIncreasing mineable resources by 80%,\nReducing striping ratios by 55%,\nIncreasing mine life by 20%, and\nIncreasing total gold production by 20%.\n\n\npreconcentration reduced the quantity of material processed via stockpiles and enabled the processing plant to be relocated to a central location between the three pits;\nReducing annual material movement by 15%,\nReducing cash costs and total costs by 10%, and\nReducing implementation capex by 5%.\n\n\nWhile a reduction in process plant capacity could maintain a similar production profile with preconcentration, the significant increase in the quantity of economic ore mined warranted a processing plant of similar capacity, or slightly larger, to maximise NPV.  \n\nThe use of preconcentration by screening improved the NPV of the project by 34% and has become the primary plan to develop the orebody.\n","text":"### Sub topics\n\n<SubTopics />  \n  \n\n-----\n\n\nFramework for Evaluation of preconcentration [Strategies](#Framework_for_Evaluation_of_preconcentration_Strategies)\n===================================================================================================================\n\nThe following framework has been used to quantify the economic and [environmental impacts](https://en.wikipedia.org/wiki/Environmental_effects_of_mining) of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques at numerous <b title=\"Yielding or containing metal.\">metalliferous</b> operations. The framework was also applied to quantify the impacts of mine to mill strategies and the adoption of new processing technologies at operations.\n\nThe framework consists of:\n\n1.  Characterisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses;\n2.  [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgy and spatial modelling;\n3.  <b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> and simulation;\n4.  [Strategic mine planning](/topics/strategic-planning-with-grade-engineering); and\n5.  Strategy evaluation.\n\nThe interactions of the framework in the quantification of the economic and [environmental impacts](https://en.wikipedia.org/wiki/Environmental_effects_of_mining) of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> are presented in the figure below.\n\n[![Framework for the quantification of economic and environmental impacts of preconcentration](https://res.cloudinary.com/shapeable/image/upload/v1686822775/wikiore/217.png \"Framework for the quantification of economic and environmental impacts of preconcentration\")](https://res.cloudinary.com/shapeable/image/upload/v1686822775/wikiore/217.png \"Framework for the quantification of economic and environmental impacts of preconcentration\")\n\nFramework for the quantification of economic and environmental impacts of preconcentration\n\nCharacterisation[Characterisation](#Characterisation)\n=====================================\n\nCharacterisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses throughout the [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s of a deposit provides the foundation for technoeconomic evaluation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques. The process of characterising <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses requires a combination of laboratory test work and grade [heterogeneity](/pages/wikiore-heterogeneity) modelling to quantify the strength of the drivers for each separation technique.\n\n### Characterisation of [Natural Deportment](/pages/wikiore-natural-deportment)[](#Characterisation_of_Natural_Deportment)\n\nCharacterisation of the [natural deportment](/pages/wikiore-natural-deportment) response throughout the deposit requires testwork performed at <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> and bulk scales. Intact diamond <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> or <b title=\"Subjective term for the larger sized component of feed\">coarse</b> [assay](https://en.wikipedia.org/wiki/Assay) rejects are used to quantify the [natural deportment](/pages/wikiore-natural-deportment) response in future ore to be mined. The sampling campaign should cover the <b title=\"Geological classification of material into discrete groups.\">rock type</b>s, grade ranges and spatial distribution of material within, and just outside, the planned mining extents, biasing the next 5-10 years of production. Intact <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> is crushed to -3.5 mm and screened through a series of sieves with the aim to produce five to six <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s of similar mass for [assay](https://en.wikipedia.org/wiki/Assay).\n\nBulk samples are used to determine the <b title=\"Trials run at or near the size required for an operation.\">production scale</b> [natural deportment](/pages/wikiore-natural-deportment) response of material. These samples may be taken from [belt cut](/sub-topics/sampling)s or <b title=\"Run of mine\">ROM</b> material and are therefore limited to the material currently exposed or in [stockpiles](https://en.wikipedia.org/wiki/Stockpile). Bulk samples provide an indication of the [scale-up](/sub-topics/natural-deportment-characterisation) factor required to convert diamond <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> responses to <b title=\"Trials run at or near the size required for an operation.\">production scale</b> responses. The bulk samples are screened into five to six different <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s of similar mass and each <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b> is [assay](https://en.wikipedia.org/wiki/Assay)ed.\n\nThe [assay](https://en.wikipedia.org/wiki/Assay) results of the <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s, for bulk and <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> samples, can be viewed as a plot of cumulative mass (or percent passing) versus <b title=\"Grade of accept material divided by feed grade.\">upgrade factor</b> (the grade of the <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> relative to the head grade of the sample) to assess the strength of the [natural deportment](/pages/wikiore-natural-deportment) response. A linear relationship often exists between the natural log of the <b title=\"Grade of accept material divided by feed grade.\">upgrade factor</b> and the negative natural log of cumulative mass. The slope of this linear relationship can be used to derive a single metric to describe the strength of the [natural deportment](/pages/wikiore-natural-deportment) response. This single metric can be used to quantitively rank the strength of [natural deportment](/pages/wikiore-natural-deportment) responses in different <b title=\"Geological classification of material into discrete groups.\">rock type</b>s or deposits. It can also be used to interpolate the [natural deportment](/pages/wikiore-natural-deportment) response throughout the <b title=\"Digitised model of the deposit.\">resource model</b> to assist in the optimisation of the strategic mine plan with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening.\n\n### Characterisation of [Induced Deportment](/pages/wikiore-induced-deportment)[](#Characterisation_of_Induced_Deportment)\n\nCharacterisation of the [Induced deportment](/pages/wikiore-induced-deportment) response requires assessment of the [natural deportment](/pages/wikiore-natural-deportment) response, analysis of <b title=\"Contained in unbroken ground.\">in-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) and engineering of a bimodal <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b>.\n\nThe <b title=\"Contained in unbroken ground.\">in-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) is assessed at a <b title=\"Cylindrical hole used to load explosives into unbroken material.\"> blast hole </b> scale using a combination of retrospective data from <b title=\"Cylindrical hole used to load explosives into unbroken material.\"> blast hole </b> [assay](https://en.wikipedia.org/wiki/Assay)s and forward-looking geostatistical estimates from <b title=\"Exploration and infill drill hole data (typically diamond drill core).\"> resource drilling </b>. <b title=\"Cylindrical hole used to load explosives into unbroken material.\"> Blast hole </b>  [assay](https://en.wikipedia.org/wiki/Assay)s provide a high-resolution, 2-dimensional data set that can be combined with <b title=\"Stage at which final boundaries between ore and waste are calculated.\">grade control</b> polygons to identify specific areas where high or low-grade pockets of material were sent to the incorrect destination due to limitations in the selective mining unit (SMU). These areas can then be assessed for [induced deportment](/pages/wikiore-induced-deportment) response by altering the blast design to achieve finer fragmentation in high-grade and <b title=\"Subjective term for the larger sized component of feed\">coarse</b>r fragmentation in low-grade. Modelled <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b>s, [natural deportment](/pages/wikiore-natural-deportment) response and <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> size are used to derive the grade and mass of screen <b title=\"Material above a specific size (generally used to define material that is retained on a screen deck).\">oversize</b> and <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> and characterise the [Induced deportment](/pages/wikiore-induced-deportment) response.\n\n\nForward-looking estimates of [Induced deportment](/pages/wikiore-induced-deportment) responses require geostatistical estimation of <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) at a <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> separation scale. Uniform conditioning (UC) is used to estimate the probability of a <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b> volume being above a series of [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grades within a <b title=\"A discrete section within a resource model (i.e. block).\">panel</b> of material in the <b title=\"Digitised model of the deposit.\">resource model</b>. This estimate is combined with different [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grades for high and low-energy <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b>, <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> sizes and the [natural deportment](/pages/wikiore-natural-deportment) response to estimate the [Induced deportment](/pages/wikiore-induced-deportment) response throughout the <b title=\"Digitised model of the deposit.\">resource model</b>. However, <b title=\"Uniform Conditioning\">UC</b> estimates do not provide the exact spatial location of <b title=\"Contained in unbroken ground.\">In-situ</b> [heterogeneity](/pages/wikiore-heterogeneity) but rather an estimate of the average <b title=\"Contained in unbroken ground.\">In-situ</b> [heterogeneity](/pages/wikiore-heterogeneity) present for the kriged grade of the <b title=\"A discrete section within a resource model (i.e. block).\">panel</b> within the estimation <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>. Therefore, the use of the estimated [Induced deportment](/pages/wikiore-induced-deportment) response using <b title=\"Uniform Conditioning\">UC</b> estimates of <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) should be restricted to long-term, Strategic mine planning decisions. These decisions are based on larger mining volumes that are more likely to reflect the average estimated response.\n\nThe aim of the bimodal <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b> is to achieve the greatest difference in the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution (PSD) between <b title=\"Subjective term for the larger sized component of feed\">coarse</b> and fine <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b> to provide the highest separation potential by screening. The results are dependent on the physical <b title=\"Generic term for material properties.\">rock characteristics</b> and blast design parameters including <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b>, hole diameter and charge. Adjustments to blast design parameters are often limited to the charging of holes, as grade [heterogeneity](/pages/wikiore-heterogeneity) of a blast is not confirmed until the <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> chips are [assay](https://en.wikipedia.org/wiki/Assay)ed. However, the greatest opportunity to create a wide differential between <b title=\"Subjective term for the larger sized component of feed\">coarse</b> and fine blast PSDs is through <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b> of <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b>s. Predictive models using the <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> data of the <b title=\"Individual levels within an open pit.\">bench</b> above and infill drilling can be used to inform adjustments to <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b> ahead of time. Alternatively, measure while drilling (MWD) data and real-time grade measurements using sensors on drill chips may be used to inform a change in drill pattern in real time.\n\n### Characterisation of Bulk Ore Sorting[](#Characterisation_of_Bulk_Ore_Sorting)\n\nCharacterisation of the [bulk ore sorting](/pages/wikiore-bulk-sorting) response requires estimation of the grade [heterogeneity](/pages/wikiore-heterogeneity) delivered to the sensor at a scale reflecting the separable parcels size of the sorting system and an estimate of sensor and mechanical separation performance. <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) can be estimated using UC, as described in characterisation of [Induced deportment](/pages/wikiore-induced-deportment), using a separation volume approximating the separable parcel size. However, <b title=\"Uniform Conditioning\">UC</b> has been shown to have limitations in the estimation of <b title=\"Contained in unbroken ground.\">In-situ</b> [grade variability](/pages/wikiore-heterogeneity) present at very small separation units, including [truck](https://en.wikipedia.org/wiki/Haul_truck) and [shovel](https://en.wikipedia.org/wiki/Power_shovel) volumes.\n\nWhile the <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) of a separable parcel of material can be estimated using [geostatistical techniques](https://en.wikipedia.org/wiki/Geostatistics#Methods), the process of mining, loading, transporting and [crushing](https://en.wikipedia.org/wiki/Crusher) the material prior to presentation of the material to a sensor can significantly reduce measured [heterogeneity](/pages/wikiore-heterogeneity) and the [bulk ore sorting](/pages/wikiore-bulk-sorting) response. Modelling the impact of mixing in each stage of mining and material handling is a critical focus to support desktop [bulk ore sorting](/pages/wikiore-bulk-sorting) evaluations. Currently, empirical measurements of grade [heterogeneity](/pages/wikiore-heterogeneity) present in separable parcels of material at the point of deployment may provide the best estimation of the delivered [heterogeneity](/pages/wikiore-heterogeneity) to the sensor. In the absence of empirical data, the impact of mixing on <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) estimates can be examined through sensitivity analysis.\n\nSensor and separation performance of the [bulk ore sorting](/pages/wikiore-bulk-sorting) system can be examined using anticipated or measured accuracy and precision results for the sensor technology and modelling of mechanised sorting efficiency. The combined impact of delivered [heterogeneity](/pages/wikiore-heterogeneity), sensor performance and separation performance can be modelled using discrete event simulation to estimate <b title=\"Trials run at or near the size required for an operation.\">production scale</b> [bulk ore sorting](/pages/wikiore-bulk-sorting) response. This response can then be linked to either insitu grade [heterogeneity](/pages/wikiore-heterogeneity) estimates or material classifications within <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s to interpolate a [bulk ore sorting](/pages/wikiore-bulk-sorting) response in the <b title=\"Digitised model of the deposit.\">resource model</b>.\n\n### Characterisation of particle sorting[](#Characterisation_of_particle_sorting)\n\nCharacterisation of the [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response requires measurements for the grade distribution of <b title=\"Individual rocks within discrete size fractions.\">particles </b> present in discrete <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s of crushed and screened material, the performance of the sensor technology and mechanical separation and the [natural deportment](/pages/wikiore-natural-deportment) response. The grade distribution of <b title=\"Individual rocks within discrete size fractions.\">particles </b> within different size ranges can be determined through laboratory [assay](https://en.wikipedia.org/wiki/Assay). These [assay](https://en.wikipedia.org/wiki/Assay)s can be used to provide a theoretical [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response in the absence of [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) test work.\n\nThe combined sensor and mechanical separation performance of particle sorters can be examined using supplier testing services. This service uses a particle sorter to test a sample from the mine using different sensors. The <b title=\"Individual rocks within discrete size fractions.\">particles </b> are marked to indicate which stream they reported to with each sensor then each particle is weighed and [assay](https://en.wikipedia.org/wiki/Assay)ed. The [assay](https://en.wikipedia.org/wiki/Assay) results and sorting performance can then be used to determine the [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response for each sensor technology.\n\n[particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) requires screening to prepare a specified [particle size](https://en.wikipedia.org/wiki/Particle_size) range to <b title=\"Material entering a predetermined system.\">feed</b> the particle sorter. To determine and optimise the integrated [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) and screening response of the material, the [natural deportment](/pages/wikiore-natural-deportment) response is required to estimate the grade of the screen <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b>. The combined estimates for [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response and [natural deportment](/pages/wikiore-natural-deportment) screening response can be used to characterise the <b title=\"Output of accept stream grade over feed grade.\">upgrade response</b> of material with [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting).\n\n### Characterisation of Coarse Gravity separation[](#Characterisation_of_Coarse_Gravity_separation)\n\nCharacterisation of the <b title=\"Subjective term for the larger sized component of feed\">coarse</b> gravity response requires laboratory testwork and the [natural deportment](/pages/wikiore-natural-deportment) response. Laboratory and large scale testwork can be used to examine separation performance for dense media separation and inline pressure jigs. Samples from the mine are treated in different densities of media or at different inline pressure [JIG](https://en.wikipedia.org/wiki/Jig_concentrators) settings and the float and sink streams are [assay](https://en.wikipedia.org/wiki/Assay)ed to evaluate and optimise [gravity separation](https://en.wikipedia.org/wiki/Gravity_separation) performance.\n\nIn mineral processing,  <b title=\"Subjective term for the larger sized component of feed\"> coarse </b> [gravity separation](https://en.wikipedia.org/wiki/Gravity_separation) requires pre-treatment by [crushing](https://en.wikipedia.org/wiki/Crusher) and screening to produce a consistent<b title=\"Particle Size Distribution\">PSD</b> in the <b title=\"Material entering a predetermined system.\">feed</b> and to remove <b title=\"Subjective term for the smaller sized component of feed\">fines</b>. Therefore, the upgrade from <b title=\"Subjective term for the larger sized component of feed\">coarse</b> [gravity separation](https://en.wikipedia.org/wiki/Gravity_separation) must also consider the [natural deportment](/pages/wikiore-natural-deportment) response of the <b title=\"Subjective term for the smaller sized component of feed\">fines</b>. An example from an operation where the upgrade to <b title=\"Subjective term for the smaller sized component of feed\">fines</b> is as significant as the upgrade from the inline pressure [JIG](https://en.wikipedia.org/wiki/Jig_concentrators) is provide by.\n\nGeometallurgy and [Spatial Modelling](/pages/wikiore-spatial-modelling)[](#Geometallurgy_and_Spatial_Modelling)\n---------------------------------------------------------------------------------------------------------------\n\nInterpolation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses in the <b title=\"Digitised model of the deposit.\">resource model</b> require assessment of suitable [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgy <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s and selection of an appropriate geostatistical estimation method. There is often insufficient data for the development of specific <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s during early stages of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> evaluations. In these cases, [natural deportment](/pages/wikiore-natural-deportment) and laboratory measured <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses may be interpolated in the <b title=\"Digitised model of the deposit.\">resource model</b> using the current estimation methodology for [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical parameters at the operation. Estimates for <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) using <b title=\"Uniform Conditioning\">UC</b> modelling (as discussed in the characterisation of [Induced deportment](/pages/wikiore-induced-deportment) and [bulk ore sorting](/pages/wikiore-bulk-sorting) responses) should also follow the current estimation <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s and search parameters for the operation.\n\nGeostatistical estimation methods range in sophistication from simple [inverse distance weighting](https://en.wikipedia.org/wiki/Inverse_distance_weighting) methods to complex multi indicator [kriging](https://en.wikipedia.org/wiki/Kriging) or [conditional simulation](https://www.whittleconsulting.com.au/wp-content/uploads/2018/05/Conditional-Simulations-Tools-for-Modelling-Uncertainty-in-Open-Pit-Optimisation.pdf)s. In the absence of adequate <b title=\"Data that has a clear position in 3d space (eg. Drill holes, GPS etc…).\">spatial data</b> regarding the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses, minimal estimation techniques or domanial averages should be applied. As greater knowledge of the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> response develops, more sophisticated estimation methods provide greater control for the population of the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> response in the <b title=\"Digitised model of the deposit.\">resource model</b>.\n\nProcess Design and Simulation[](#Process_Design_and_Simulation)\n---------------------------------------------------------------\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> and simulation considers the integration and interactions of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques with the existing infrastructure and processing facilities of the operation. <b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> and simulation is an iterative activity that alternates with the optimisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies within the strategic mine plan. \n\n### Process Design[](#Process_Design)\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> assesses the equipment requirements, plant layout and material handling strategies for given <b title=\"Generic term for material properties.\">rock characteristics</b> and capacities to develop an operationally capable <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b>. During early stages of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> evaluations, several <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> designs are developed at a range of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacities. These designs provide an understanding of how operational and <b title=\"Expected upfront costs of a given scenario or plan.\">capital costs</b> change with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacity to assist optimisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies in the strategic mine plan.\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b>s may include fixed, semi-mobile or mobile deployment options. Fixed options have a higher capital cost and lower operating cost and are best suited to a constant production capacity over a longer period. At the other end of the spectrum, mobile options have a lower capital cost and higher operating cost and offer flexibility to increase or decrease production capacity over shorter periods. Mobile or semi-mobile <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> plants are ideally suited to <b title=\"On-site test of Grade Engineering equipment (can be on/off line).\">Production Trial</b>s for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques and initial implementation.\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> governs the operating and <b title=\"Expected upfront costs of a given scenario or plan.\">capital costs</b> for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques and the location of the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> plant can have a large influence over both costs. The largest operating cost associated with bulk <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques is the rehandling of product streams. Selecting a location that minimises product rehandle for one or more product streams can greatly reduce the operational costs of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. Furthermore, integrating <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> within existing material handling transfer or decision points can eliminate rehandle for one or more product streams, greatly reducing operating and <b title=\"Expected upfront costs of a given scenario or plan.\">capital costs</b> for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. Critical locations to consider are:\n\n*   Close to the [primary crusher](https://en.wikipedia.org/wiki/Crusher), to allow the upgraded product stream to tie into the <b title=\"Subjective term for the larger sized component of feed\">coarse</b> ore stockpile conveyor;\n*   At <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> storage facilities or deferred [stockpiles](https://en.wikipedia.org/wiki/Stockpile), to minimise rehandle of the downgraded product stream;\n*   At pit exits or in the mine, to minimise deviations in <b title=\"Movement of material from in-pit to ex-pit.\">haulage</b> or handling distances to and from the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> plant; and\n*   At the mine face, ideally between or within digging and loading activities to eliminate product rehandling.\n\n### Process simulation[](#Process_simulation)\n\nProcess simulation is used to assess the impact of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques on downstream production processes. These impacts depend on the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> technique. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening alter the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution in <b title=\"Material entering a predetermined system.\">feed</b> to the processing plant, often resulting in increased capacity in the [comminution](https://en.wikipedia.org/wiki/Comminution) <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b> which may be used to increase <b title=\"Metric for overall tonnage moving through a system within a specified time.\">throughput</b> or optimise [grinding](https://en.wikipedia.org/wiki/Mill_%28grinding%29) conditions to improve recovery. All <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques can increase the grade of the <b title=\"Material entering a predetermined system.\">feed</b> to the processing plant which can improve [flotation](https://en.wikipedia.org/wiki/Froth_flotation) recovery.\n\nProcess modelling and simulation is performed using the Integrated Extraction Simulator (IES). [IES](https://www.crcore.org.au/ies) is a cloud-based simulation covering the [comminution](https://en.wikipedia.org/wiki/Comminution) and [beneficiation](https://en.wikipedia.org/wiki/Beneficiation) activities of the entire operation from drilling and blasting through to final <b title=\"Product generally produced by metal ore mines.\">concentrate</b>. [IES](https://www.crcore.org.au/ies) incorporates the ability to simulate the processing performance of multiple ore types, optimise process settings to maximise plant performance within specified constraints and to perform <b title=\"IES specific term for repeated simulations of a circuit.\">mass simulation</b> and write responses back to the <b title=\"Digitised model of the deposit.\">resource model</b>.\n\nStrategic Mine Planning[](#Strategic_Mine_Planning)\n---------------------------------------------------\n\nOptimisation of the strategic mine plan provides a holistic approach to capture all impacts of new technologies and operational strategies deployed across the mining [value chain](https://en.wikipedia.org/wiki/Value_chain), over the entire life of the operation. The optimisation is value driven, with the primary objective to maximise [net present value](https://en.wikipedia.org/wiki/Net_present_value) within specified operational and processing constraints. For these reasons, optimisation of the strategic mine plan is the preferred method to evaluate <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques.\n\nInputs into Strategic mine planning include the <b title=\"Digitised model of the deposit.\">resource model</b> and operational parameters, constraints and <b title=\"Inputs used for business case evaluations.\">economic assumptions</b>. From these inputs, the value of each <b title=\"A spatially constrained unit within the resource model.\">block</b> in the <b title=\"Digitised model of the deposit.\">resource model</b> is calculated for each processing destination including <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> storage facilities. The maximum value of the <b title=\"A spatially constrained unit within the resource model.\">block</b> is assigned, and the <b title=\"Used in the surface mining industry to solve the Pit Limit Problem and to generate an approximate solution to the Extraction Sequence Problem.\">Lerchs-Grossman algorithm</b> is applied to develop a series of nested shells by adjusting the revenue factor applied to each block. These nested shells provide guidance to the selection of the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) and design of phases to be mined. The material can then be scheduled, and [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) optimised, for all processing destinations in the operation.\n\nThe inclusion of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques offer flexibility and opportunity for optimisation in their application and operational settings, such as <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> or sorting [cut-off](/sub-topics/scheduling-and-cut-off-optimisation). These options can be included in the optimisation of the strategic mine plan in much the same way trade-offs between <b title=\"Metric for overall tonnage moving through a system within a specified time.\">throughput</b> and recovery with <b title=\"Target product size post grind.\">grind size</b> have traditionally been assessed. The figure below shows the interaction of operational decisions for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> and process plant settings that can be optimised in the strategic mine plan.\n\nOnce an optimal schedule and [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grade policy is produced, the resultant material movement and cashflow provides the best estimate of economic benefits relating to the scenario modelled. In addition, the material movements can be combined with power, fuel, steel and water consumption (from process and <b title=\"Movement of material from in-pit to ex-pit.\">haulage</b> models) to provide environmental metrics relating to planned production and quantity the <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock and [tailings](https://en.wikipedia.org/wiki/Tailings) generated. A comparison of the strategic mine plan with and without <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques provides a robust quantification of anticipated economic and [environmental impacts](https://en.wikipedia.org/wiki/Environmental_effects_of_mining) due to <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>.\n\nComplete strategic mine plan optimisations for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques have been performed with [Whittle](https://www.whittleconsulting.com.au/) Consulting Enterprise Optimisation, Geovia [Whittle](https://www.whittleconsulting.com.au/)™, [COMET](https://www.cometstrategy.com/index.php) Strategy and [COMET](https://www.cometstrategy.com/index.php) Scheduler and [Datamine](https://www.dataminesoftware.com/) [NPV](https://en.wikipedia.org/wiki/Net_present_value) Scheduler. However, due to the magnitude of work involved in performing a complete mine optimisation, early [opportunity assessment](/sub-topics/opportunity-assessments)s for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques are performed within the operation’s existing [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) and phases. These evaluations operate under the presumption that if sufficient value can be found within the existing mine design, performing a complete Strategic mine planning optimisation will only unlock greater value.\n\n[![Interaction of preconcentration and process plant settings optimised in the strategic mine plan.](https://res.cloudinary.com/shapeable/image/upload/v1686822777/wikiore/218.png \"Interaction of preconcentration and process plant settings optimised in the strategic mine plan.\")](https://res.cloudinary.com/shapeable/image/upload/v1686822777/wikiore/218.png \"Interaction of preconcentration and process plant settings optimised in the strategic mine plan.\")\n\nInteraction of preconcentration and process plant settings optimised in the strategic mine plan.\n\n### Preconcentration Impact on Operational Capacities[](#Preconcentration_Impact_on_Operational_Capacities)\n\nOptimising the strategic mine plan requires balancing constraints to the rate of production imposed by mining, processing and marketing capacities. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> introduces an additional capacity to optimise that increases the effective processing capacity of an operation and changes the economic value of material, increasing the quantity of ore mined. As a result, the optimal balance between mining, processing, marketing and <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacities must be established and there may be a need to increase mining and marketing capacities.\n\nThe requirement for additional <b title=\"Maximum potential material moveable under current constraints.\">mining capacity</b> with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> is necessary for operations that are, or become, mining constrained. Generally, this is the optimal configuration for underground <b title=\"Yielding or containing metal.\">metalliferous</b> mines where <b title=\"Maximum potential material moveable under current constraints.\">mining capacity</b> is the most capital-intensive constraint on production. As a result, the opportunity cost of production raises the [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) for mined material and encourages the use of highly selective mining methods. Optimal <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies will seek to relieve the pressure on mining [bottlenecks](https://en.wikipedia.org/wiki/Bottleneck_%28production%29) by preconcentrating material prior to the constraining activity, such as the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> of ore prior to an underground hoist. As a result, greater capacity in downstream mining activities are required to maintain the quantity of ore processed. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> may also unlock greater value in mining constrained operations by enabling a transition to lower-cost, less selective mining methods, simultaneously increasing resource utilisation and the quality of ore sent to processing destinations.\n\nConversely, the requirement for additional <b title=\"Maximum potential material moveable under current constraints.\">mining capacity</b> with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> is less prevalent in operations that are processing constrained. Generally, this is the optimal configuration for open-pit <b title=\"Yielding or containing metal.\">metalliferous</b> mines where processing capacity is the most capital-intensive constraint on production. As a result, the opportunity cost of production raises the [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) applied to processing, generating an excess quantity of economic ore from the mine. This excess ore is often deferred to [stockpiles](https://en.wikipedia.org/wiki/Stockpile) or allocated to lower-value processing destinations, such as dump [leach](https://en.wikipedia.org/wiki/Leaching_%28metallurgy%29). The increase in effective processing capacity with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> allows a greater quantity of ore to be treated as it is mined, reducing the quantity of material stockpiled or processed at a lower-value destination. This accelerates both the quantity of metal and the cashflow produced by the operation, significantly increasing NPV.\n\nStrategy Evaluation[](#Strategy_Evaluation)\n-------------------------------------------\n\nStrategy evaluation involves sensitivity, scenario and simulation modelling to find the optimal <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategy and understand the value drivers for that strategy.\n\nSensitivity analysis is used to flex individual assumptions regarding <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> performance and costs to understand the impact each assumption has on the value proposition. This information is useful in early [opportunity assessment](/sub-topics/opportunity-assessments)s to identify critical assumptions for detailed examination in the next stage of evaluation.\n\nScenario analysis examines the effect of multiple simultaneous changes to <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> assumptions. Common examples of scenario analysis applied to <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> evaluations include the assessment of:\n\n*   Different individual or combinations of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques;\n*   Different deployment capacities and locations for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques; and\n*   Staging of capital and scaling-up of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacity.\n\nSimulation analysis assigns probabilistic distributions to uncertain variables and through repeat analyses determines the probabilistic range of likely outcomes. During the evaluation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques, simulation analysis is best suited to examine the impact of uncertainty in the modelled <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses. However, due to the magnitude of work involved, simulation analysis may be applied during detailed [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) studies for deployment options of the selected <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> technique(s).\n\nProject Evaluation Stages[](#Project_Evaluation_Stages)\n=======================================================\n\nThe time, personnel and investment required to examine new technologies and strategies to deploy at an operation can be substantial. A capital investment model is used to assist in focussing a company’s limited resources on the examination of the highest value options for an operation. This model uses a stage-gate approach to progress the most promising options and strategies from conception to operation at site. CRC ORE have followed this approach to apply the framework for evaluation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies at varying levels of detail to the different stages of project evaluation. A description of the different project evaluation stages is provided in the following Table. \n\n| **Project Stage**                                            | **Description**                                              |\n| ------------------------------------------------------------ | ------------------------------------------------------------ |\n| [opportunity assessment](/sub-topics/opportunity-assessments) | Broad assessment of all available options, preliminary ranking by order of magnitude valuation and identify critical assumptions that require further examination. |\n| [concept study](/topics/grade-engineering-studies)           | Top ranked options and critical assumptions identified in the [opportunity assessment](/sub-topics/opportunity-assessments) are assessed in greater detail to provide higher confidence in their ranking and valuation. |\n| Production Trial                                             | Top ranked option(s) from [concept study](/topics/grade-engineering-studies) are demonstrated at pilot scale to prove concept in production environment and confirm critical assumptions. |\n| pre [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) study | Detailed assessment of successful options trialled including alternative designs and layouts, capacities and deployment strategies, detailed risk assessment and identify best strategy for [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) study. |\n| [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) study | Detailed assessment of the selected strategy including definitive designs and cost estimates, environmental and social impact assessments and permitting, licensing and supply contracts for final approval to invest and implement the strategy. |\n| Implementation                                               | Commission selected strategy, optimise performance and integrate within production. |\n| Operation                                                    | Monitor and sustain performance within production.           |\n\nResults and Discussion[](#Results_and_Discussion)\n=================================================\n\nThe following results represent a compilation of 32 [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering)® evaluations performed across fifteen sites using the framework described in this paper. The following Table provides relevant information regarding the project, commodities, <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques examined, whether the evaluation considered the full or partial optimisation of the strategic mine plan and the change in the [NPV](https://en.wikipedia.org/wiki/Net_present_value) for each <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> option. The relative change in [NPV](https://en.wikipedia.org/wiki/Net_present_value) is also displayed in the Figure below.\n\n [![Chapter4 Table2](https://res.cloudinary.com/shapeable/image/upload/v1686822780/wikiore/221.png)](https://res.cloudinary.com/shapeable/image/upload/v1686822780/wikiore/221.png)   \n\n\n[![Change in NPV with preconcentration for 32 evaluations across fifteen operations](https://res.cloudinary.com/shapeable/image/upload/v1686822782/wikiore/219.png \"Change in NPV with preconcentration for 32 evaluations across fifteen operations\")](https://res.cloudinary.com/shapeable/image/upload/v1686822782/wikiore/219.png \"Change in NPV with preconcentration for 32 evaluations across fifteen operations\")\n\nChange in NPV with preconcentration for 32 evaluations across fifteen operations\n\nThe evaluations are dominated by <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> screening assessments and [bulk ore sorting](/pages/wikiore-bulk-sorting) assessments. The results show a wide range of possible economic outcomes can be achieved with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> , including the fact that not all orebodies are amenable to certain <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques.\n\nThe average improvement in [NPV](https://en.wikipedia.org/wiki/Net_present_value) was 12.8% across all <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques; screening techniques showed an average increase of 12.8% [NPV](https://en.wikipedia.org/wiki/Net_present_value) and [bulk ore sorting](/pages/wikiore-bulk-sorting) 17.0% NPV. Partial optimisation of the strategic mine plan yielded an average increase of 9.3% NPV, while a full optimisation returned 18.5% NPV. These results highlight the additional value from <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> that is unlocked with a complete optimisation of the strategic mine plan.\n\nThe Figure below presents a boxplot of selected production and environmental metrics for twelve <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> screening and [bulk ore sorting](/pages/wikiore-bulk-sorting) options across six operations. Not all evaluations presented in the Table above have been examined for changes in environmental metrics.\n\nThe results show a wide range of outcomes in production and environmental metrics are possible. The impact that <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> has on the quantity of ore processed and [tailings](https://en.wikipedia.org/wiki/Tailings) and <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock generated is often ambiguous. Significant increases in these metrics are possible with the expansion of the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) as a result of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. Similarly, a reduction in <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock is possible with increases in ore processed and [tailings](https://en.wikipedia.org/wiki/Tailings) generated due to a significant lowering of the economic [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> and little opportunity to expand the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks). In all scenarios examined, <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> increased the grade of ore treated and the total metal recovered from the orebody, indicating greater resource utilisation is achieved with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>.\n\nThe results also show significant decreases in the energy, emission, water and steel intensity of <b title=\"Yielding or containing metal.\">metalliferous</b> production are possible with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. These intensities of production represent the change in the energy, water and steel consumed, and emissions generated, relative to the production of a unit of metal output. On average, a 6% reduction in energy intensity, 8% reductions in emission and water intensities, and a 11% reduction in the steel intensity of [comminution](https://en.wikipedia.org/wiki/Comminution) resulted from <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. These figures represent the inputs directly consumed by the operation and do not account for embedded energy, emissions and water in inputs consumed.\n\nFurthermore, the results show that <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies were able to more than offset the increased energy, water, emission and steel requirements with additional metal production in scenarios where the quantity of ore processed significantly increased.\n\n[![Boxplot of production and environmental metrics for twelve preconcentration options across six operations](https://res.cloudinary.com/shapeable/image/upload/v1686822784/wikiore/220.png \"Boxplot of production and environmental metrics for twelve preconcentration options across six operations\")](https://res.cloudinary.com/shapeable/image/upload/v1686822784/wikiore/220.png \"Boxplot of production and environmental metrics for twelve preconcentration options across six operations\")\n\nBoxplot of production and environmental metrics for twelve preconcentration options across six operations\n\nPreconcentration at Greenfield projects[](#Preconcentration_at_Greenfield_projects)\n-----------------------------------------------------------------------------------\n\n[Greenfield](https://en.wikipedia.org/wiki/Greenfield_land)s projects have greater flexibility to alter site layouts and adjust operational capacities to capture the full benefits provided by <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. However, there is less ability to trial and test <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques at [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) projects, often creating greater uncertainty whether to invest in <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies for [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) projects. In the results presented in Table 2, <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> options applied to [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) projects returned an average increase of 16.1% NPV, while [Brownfield](https://en.wikipedia.org/wiki/Brownfield_land) projects returned an average increase of 11.2% [NPV](https://en.wikipedia.org/wiki/Net_present_value) with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. The largest increase in [NPV](https://en.wikipedia.org/wiki/Net_present_value) from the 32 evaluations presented in Table 2 was also a [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) project (6C) and provides an excellent example of the additional benefits that can be achieved by altering site layouts and mine designs for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>.\n\nThe project is evaluating the development of an intrusive-hosted, structurally controlled stockwork gold and silver deposit. The orebody lends itself to development as three [open pit](https://en.wikipedia.org/wiki/Open-pit_mining)s to be processed by SABC [comminution](https://en.wikipedia.org/wiki/Comminution), [flotation](https://en.wikipedia.org/wiki/Froth_flotation), CIL and electrowinning <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b>s. The operation is processing constrained and [stockpiles](https://en.wikipedia.org/wiki/Stockpile) a significant portion of lower-value ore at a central location between the three pits. The stockpiled ore will be reclaimed and processed toward the end of the mine’s life.\n\nAlthough the project is profitable, [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) studies failed to achieve a threshold return for investment. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques, including screening and dense media separation, were examined to improve the economics of the operation. [natural deportment](/pages/wikiore-natural-deportment) testwork from <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> samples across the three pits revealed a consistent, very high upgrade signature in <b title=\"Subjective term for the smaller sized component of feed\">fines</b> throughout the orebody. Bulk samples taken from a mining [adit](https://en.wikipedia.org/wiki/Adit) through the main pit were screened and [assay](https://en.wikipedia.org/wiki/Assay)ed to confirm the very high [natural deportment](/pages/wikiore-natural-deportment) response was present at <b title=\"Run of mine\">ROM</b> PSD. Strategic mine planning used the [natural deportment](/pages/wikiore-natural-deportment) testwork to reoptimise pits, phases and site layouts with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening. The study found:\n\n*   The optimal <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategy sent high-grade ore directly to the processing plant and upgraded lower-value ore through the [screening plant](https://en.wikipedia.org/wiki/Mechanical_screening);\n*   <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> enabled a significant expansion of the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks)s and increased resource utilisation;\n    *   Lowering the mining [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grade by 50%,\n    *   Increasing mineable resources by 80%,\n    *   Reducing striping ratios by 55%,\n    *   Increasing <b title=\"Expected longevity of mining operations under a given scenario or plan.\">mine life</b> by 20%, and\n    *   Increasing total gold production by 20%.\n*   <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> reduced the quantity of material processed via [stockpiles](https://en.wikipedia.org/wiki/Stockpile) and enabled the processing plant to be relocated to a central location between the three pits;\n    *   Reducing annual material movement by 15%,\n    *   Reducing cash costs and total costs by 10%, and\n    *   Reducing implementation [capex](https://en.wikipedia.org/wiki/Capital_expenditure) by 5%.\n*   While a reduction in process plant capacity could maintain a similar production profile with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>, the significant increase in the quantity of economic ore mined warranted a processing plant of similar capacity, or slightly larger, to maximise NPV.  \n\nThe use of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening improved the [NPV](https://en.wikipedia.org/wiki/Net_present_value) of the project by 34% and has become the primary plan to develop the orebody."},"image":{"id":"image_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","url":"https://res.cloudinary.com/shapeable/image/upload/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp","url2x":null,"thumbnails":{"id":"thumbnails-file_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","bubbleLarge":{"id":"thumbnails-bubble-large-file_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_128/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_256/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp"},"mainBanner":{"id":"thumbnails-main-banner-file_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_1440/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_2880/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp"},"halfBanner":{"id":"thumbnails-half-banner-file_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_780/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp","url2x":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_1560/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp"}}}},"entityType":{"useAi":null},"entityViews":[],"gptName":null,"outlineNumber":"2.1","color":{"__typename":"Platform_Color","id":"65d2ed7febf7bb9388ffab3a","slug":"core-12","name":"Core 12","value":"#3b6673","darkValue":"#2b4b56","veryDarkValue":"#1c3239"},"trend":{"id":"65d2ede1ebf7bb9388ffb20d","slug":"mine-development","name":"Mine Development","__typename":"Platform_Trend","path":"/value-chain/mine-development","outlineNumber":"2","color":{"id":"65d2ed7febf7bb9388ffab3a","name":"Core 12","slug":"core-12","value":"#3b6673"}},"intro":{"id":"65d2eddfebf7bb9388ffb1f5_intro","text":""},"description":{"id":"65d2eddfebf7bb9388ffb1f5_description","text":"### Sub topics\n\n<SubTopics />  \n  \n\n-----\n\n\nFramework for Evaluation of preconcentration [Strategies](#Framework_for_Evaluation_of_preconcentration_Strategies)\n===================================================================================================================\n\nThe following framework has been used to quantify the economic and [environmental impacts](https://en.wikipedia.org/wiki/Environmental_effects_of_mining) of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques at numerous <b title=\"Yielding or containing metal.\">metalliferous</b> operations. The framework was also applied to quantify the impacts of mine to mill strategies and the adoption of new processing technologies at operations.\n\nThe framework consists of:\n\n1.  Characterisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses;\n2.  [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgy and spatial modelling;\n3.  <b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> and simulation;\n4.  [Strategic mine planning](/topics/strategic-planning-with-grade-engineering); and\n5.  Strategy evaluation.\n\nThe interactions of the framework in the quantification of the economic and [environmental impacts](https://en.wikipedia.org/wiki/Environmental_effects_of_mining) of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> are presented in the figure below.\n\n[![Framework for the quantification of economic and environmental impacts of preconcentration](https://res.cloudinary.com/shapeable/image/upload/v1686822775/wikiore/217.png \"Framework for the quantification of economic and environmental impacts of preconcentration\")](https://res.cloudinary.com/shapeable/image/upload/v1686822775/wikiore/217.png \"Framework for the quantification of economic and environmental impacts of preconcentration\")\n\nFramework for the quantification of economic and environmental impacts of preconcentration\n\nCharacterisation[Characterisation](#Characterisation)\n=====================================\n\nCharacterisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses throughout the [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s of a deposit provides the foundation for technoeconomic evaluation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques. The process of characterising <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses requires a combination of laboratory test work and grade [heterogeneity](/pages/wikiore-heterogeneity) modelling to quantify the strength of the drivers for each separation technique.\n\n### Characterisation of [Natural Deportment](/pages/wikiore-natural-deportment)[](#Characterisation_of_Natural_Deportment)\n\nCharacterisation of the [natural deportment](/pages/wikiore-natural-deportment) response throughout the deposit requires testwork performed at <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> and bulk scales. Intact diamond <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> or <b title=\"Subjective term for the larger sized component of feed\">coarse</b> [assay](https://en.wikipedia.org/wiki/Assay) rejects are used to quantify the [natural deportment](/pages/wikiore-natural-deportment) response in future ore to be mined. The sampling campaign should cover the <b title=\"Geological classification of material into discrete groups.\">rock type</b>s, grade ranges and spatial distribution of material within, and just outside, the planned mining extents, biasing the next 5-10 years of production. Intact <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> is crushed to -3.5 mm and screened through a series of sieves with the aim to produce five to six <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s of similar mass for [assay](https://en.wikipedia.org/wiki/Assay).\n\nBulk samples are used to determine the <b title=\"Trials run at or near the size required for an operation.\">production scale</b> [natural deportment](/pages/wikiore-natural-deportment) response of material. These samples may be taken from [belt cut](/sub-topics/sampling)s or <b title=\"Run of mine\">ROM</b> material and are therefore limited to the material currently exposed or in [stockpiles](https://en.wikipedia.org/wiki/Stockpile). Bulk samples provide an indication of the [scale-up](/sub-topics/natural-deportment-characterisation) factor required to convert diamond <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> responses to <b title=\"Trials run at or near the size required for an operation.\">production scale</b> responses. The bulk samples are screened into five to six different <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s of similar mass and each <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b> is [assay](https://en.wikipedia.org/wiki/Assay)ed.\n\nThe [assay](https://en.wikipedia.org/wiki/Assay) results of the <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s, for bulk and <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> samples, can be viewed as a plot of cumulative mass (or percent passing) versus <b title=\"Grade of accept material divided by feed grade.\">upgrade factor</b> (the grade of the <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> relative to the head grade of the sample) to assess the strength of the [natural deportment](/pages/wikiore-natural-deportment) response. A linear relationship often exists between the natural log of the <b title=\"Grade of accept material divided by feed grade.\">upgrade factor</b> and the negative natural log of cumulative mass. The slope of this linear relationship can be used to derive a single metric to describe the strength of the [natural deportment](/pages/wikiore-natural-deportment) response. This single metric can be used to quantitively rank the strength of [natural deportment](/pages/wikiore-natural-deportment) responses in different <b title=\"Geological classification of material into discrete groups.\">rock type</b>s or deposits. It can also be used to interpolate the [natural deportment](/pages/wikiore-natural-deportment) response throughout the <b title=\"Digitised model of the deposit.\">resource model</b> to assist in the optimisation of the strategic mine plan with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening.\n\n### Characterisation of [Induced Deportment](/pages/wikiore-induced-deportment)[](#Characterisation_of_Induced_Deportment)\n\nCharacterisation of the [Induced deportment](/pages/wikiore-induced-deportment) response requires assessment of the [natural deportment](/pages/wikiore-natural-deportment) response, analysis of <b title=\"Contained in unbroken ground.\">in-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) and engineering of a bimodal <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b>.\n\nThe <b title=\"Contained in unbroken ground.\">in-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) is assessed at a <b title=\"Cylindrical hole used to load explosives into unbroken material.\"> blast hole </b> scale using a combination of retrospective data from <b title=\"Cylindrical hole used to load explosives into unbroken material.\"> blast hole </b> [assay](https://en.wikipedia.org/wiki/Assay)s and forward-looking geostatistical estimates from <b title=\"Exploration and infill drill hole data (typically diamond drill core).\"> resource drilling </b>. <b title=\"Cylindrical hole used to load explosives into unbroken material.\"> Blast hole </b>  [assay](https://en.wikipedia.org/wiki/Assay)s provide a high-resolution, 2-dimensional data set that can be combined with <b title=\"Stage at which final boundaries between ore and waste are calculated.\">grade control</b> polygons to identify specific areas where high or low-grade pockets of material were sent to the incorrect destination due to limitations in the selective mining unit (SMU). These areas can then be assessed for [induced deportment](/pages/wikiore-induced-deportment) response by altering the blast design to achieve finer fragmentation in high-grade and <b title=\"Subjective term for the larger sized component of feed\">coarse</b>r fragmentation in low-grade. Modelled <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b>s, [natural deportment](/pages/wikiore-natural-deportment) response and <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> size are used to derive the grade and mass of screen <b title=\"Material above a specific size (generally used to define material that is retained on a screen deck).\">oversize</b> and <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> and characterise the [Induced deportment](/pages/wikiore-induced-deportment) response.\n\n\nForward-looking estimates of [Induced deportment](/pages/wikiore-induced-deportment) responses require geostatistical estimation of <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) at a <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> separation scale. Uniform conditioning (UC) is used to estimate the probability of a <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b> volume being above a series of [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grades within a <b title=\"A discrete section within a resource model (i.e. block).\">panel</b> of material in the <b title=\"Digitised model of the deposit.\">resource model</b>. This estimate is combined with different [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grades for high and low-energy <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b>, <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> sizes and the [natural deportment](/pages/wikiore-natural-deportment) response to estimate the [Induced deportment](/pages/wikiore-induced-deportment) response throughout the <b title=\"Digitised model of the deposit.\">resource model</b>. However, <b title=\"Uniform Conditioning\">UC</b> estimates do not provide the exact spatial location of <b title=\"Contained in unbroken ground.\">In-situ</b> [heterogeneity](/pages/wikiore-heterogeneity) but rather an estimate of the average <b title=\"Contained in unbroken ground.\">In-situ</b> [heterogeneity](/pages/wikiore-heterogeneity) present for the kriged grade of the <b title=\"A discrete section within a resource model (i.e. block).\">panel</b> within the estimation <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>. Therefore, the use of the estimated [Induced deportment](/pages/wikiore-induced-deportment) response using <b title=\"Uniform Conditioning\">UC</b> estimates of <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) should be restricted to long-term, Strategic mine planning decisions. These decisions are based on larger mining volumes that are more likely to reflect the average estimated response.\n\nThe aim of the bimodal <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b> is to achieve the greatest difference in the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution (PSD) between <b title=\"Subjective term for the larger sized component of feed\">coarse</b> and fine <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b> to provide the highest separation potential by screening. The results are dependent on the physical <b title=\"Generic term for material properties.\">rock characteristics</b> and blast design parameters including <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b>, hole diameter and charge. Adjustments to blast design parameters are often limited to the charging of holes, as grade [heterogeneity](/pages/wikiore-heterogeneity) of a blast is not confirmed until the <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> chips are [assay](https://en.wikipedia.org/wiki/Assay)ed. However, the greatest opportunity to create a wide differential between <b title=\"Subjective term for the larger sized component of feed\">coarse</b> and fine blast PSDs is through <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b> of <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b>s. Predictive models using the <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> data of the <b title=\"Individual levels within an open pit.\">bench</b> above and infill drilling can be used to inform adjustments to <b title=\"Two terms for defining the distance between blast holes.\">burden and spacing</b> ahead of time. Alternatively, measure while drilling (MWD) data and real-time grade measurements using sensors on drill chips may be used to inform a change in drill pattern in real time.\n\n### Characterisation of Bulk Ore Sorting[](#Characterisation_of_Bulk_Ore_Sorting)\n\nCharacterisation of the [bulk ore sorting](/pages/wikiore-bulk-sorting) response requires estimation of the grade [heterogeneity](/pages/wikiore-heterogeneity) delivered to the sensor at a scale reflecting the separable parcels size of the sorting system and an estimate of sensor and mechanical separation performance. <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) can be estimated using UC, as described in characterisation of [Induced deportment](/pages/wikiore-induced-deportment), using a separation volume approximating the separable parcel size. However, <b title=\"Uniform Conditioning\">UC</b> has been shown to have limitations in the estimation of <b title=\"Contained in unbroken ground.\">In-situ</b> [grade variability](/pages/wikiore-heterogeneity) present at very small separation units, including [truck](https://en.wikipedia.org/wiki/Haul_truck) and [shovel](https://en.wikipedia.org/wiki/Power_shovel) volumes.\n\nWhile the <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) of a separable parcel of material can be estimated using [geostatistical techniques](https://en.wikipedia.org/wiki/Geostatistics#Methods), the process of mining, loading, transporting and [crushing](https://en.wikipedia.org/wiki/Crusher) the material prior to presentation of the material to a sensor can significantly reduce measured [heterogeneity](/pages/wikiore-heterogeneity) and the [bulk ore sorting](/pages/wikiore-bulk-sorting) response. Modelling the impact of mixing in each stage of mining and material handling is a critical focus to support desktop [bulk ore sorting](/pages/wikiore-bulk-sorting) evaluations. Currently, empirical measurements of grade [heterogeneity](/pages/wikiore-heterogeneity) present in separable parcels of material at the point of deployment may provide the best estimation of the delivered [heterogeneity](/pages/wikiore-heterogeneity) to the sensor. In the absence of empirical data, the impact of mixing on <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) estimates can be examined through sensitivity analysis.\n\nSensor and separation performance of the [bulk ore sorting](/pages/wikiore-bulk-sorting) system can be examined using anticipated or measured accuracy and precision results for the sensor technology and modelling of mechanised sorting efficiency. The combined impact of delivered [heterogeneity](/pages/wikiore-heterogeneity), sensor performance and separation performance can be modelled using discrete event simulation to estimate <b title=\"Trials run at or near the size required for an operation.\">production scale</b> [bulk ore sorting](/pages/wikiore-bulk-sorting) response. This response can then be linked to either insitu grade [heterogeneity](/pages/wikiore-heterogeneity) estimates or material classifications within <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s to interpolate a [bulk ore sorting](/pages/wikiore-bulk-sorting) response in the <b title=\"Digitised model of the deposit.\">resource model</b>.\n\n### Characterisation of particle sorting[](#Characterisation_of_particle_sorting)\n\nCharacterisation of the [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response requires measurements for the grade distribution of <b title=\"Individual rocks within discrete size fractions.\">particles </b> present in discrete <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s of crushed and screened material, the performance of the sensor technology and mechanical separation and the [natural deportment](/pages/wikiore-natural-deportment) response. The grade distribution of <b title=\"Individual rocks within discrete size fractions.\">particles </b> within different size ranges can be determined through laboratory [assay](https://en.wikipedia.org/wiki/Assay). These [assay](https://en.wikipedia.org/wiki/Assay)s can be used to provide a theoretical [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response in the absence of [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) test work.\n\nThe combined sensor and mechanical separation performance of particle sorters can be examined using supplier testing services. This service uses a particle sorter to test a sample from the mine using different sensors. The <b title=\"Individual rocks within discrete size fractions.\">particles </b> are marked to indicate which stream they reported to with each sensor then each particle is weighed and [assay](https://en.wikipedia.org/wiki/Assay)ed. The [assay](https://en.wikipedia.org/wiki/Assay) results and sorting performance can then be used to determine the [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response for each sensor technology.\n\n[particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) requires screening to prepare a specified [particle size](https://en.wikipedia.org/wiki/Particle_size) range to <b title=\"Material entering a predetermined system.\">feed</b> the particle sorter. To determine and optimise the integrated [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) and screening response of the material, the [natural deportment](/pages/wikiore-natural-deportment) response is required to estimate the grade of the screen <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b>. The combined estimates for [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting) response and [natural deportment](/pages/wikiore-natural-deportment) screening response can be used to characterise the <b title=\"Output of accept stream grade over feed grade.\">upgrade response</b> of material with [particle sorting](https://en.wikipedia.org/wiki/Sensor-based_sorting).\n\n### Characterisation of Coarse Gravity separation[](#Characterisation_of_Coarse_Gravity_separation)\n\nCharacterisation of the <b title=\"Subjective term for the larger sized component of feed\">coarse</b> gravity response requires laboratory testwork and the [natural deportment](/pages/wikiore-natural-deportment) response. Laboratory and large scale testwork can be used to examine separation performance for dense media separation and inline pressure jigs. Samples from the mine are treated in different densities of media or at different inline pressure [JIG](https://en.wikipedia.org/wiki/Jig_concentrators) settings and the float and sink streams are [assay](https://en.wikipedia.org/wiki/Assay)ed to evaluate and optimise [gravity separation](https://en.wikipedia.org/wiki/Gravity_separation) performance.\n\nIn mineral processing,  <b title=\"Subjective term for the larger sized component of feed\"> coarse </b> [gravity separation](https://en.wikipedia.org/wiki/Gravity_separation) requires pre-treatment by [crushing](https://en.wikipedia.org/wiki/Crusher) and screening to produce a consistent<b title=\"Particle Size Distribution\">PSD</b> in the <b title=\"Material entering a predetermined system.\">feed</b> and to remove <b title=\"Subjective term for the smaller sized component of feed\">fines</b>. Therefore, the upgrade from <b title=\"Subjective term for the larger sized component of feed\">coarse</b> [gravity separation](https://en.wikipedia.org/wiki/Gravity_separation) must also consider the [natural deportment](/pages/wikiore-natural-deportment) response of the <b title=\"Subjective term for the smaller sized component of feed\">fines</b>. An example from an operation where the upgrade to <b title=\"Subjective term for the smaller sized component of feed\">fines</b> is as significant as the upgrade from the inline pressure [JIG](https://en.wikipedia.org/wiki/Jig_concentrators) is provide by.\n\nGeometallurgy and [Spatial Modelling](/pages/wikiore-spatial-modelling)[](#Geometallurgy_and_Spatial_Modelling)\n---------------------------------------------------------------------------------------------------------------\n\nInterpolation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses in the <b title=\"Digitised model of the deposit.\">resource model</b> require assessment of suitable [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgy <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s and selection of an appropriate geostatistical estimation method. There is often insufficient data for the development of specific <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s during early stages of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> evaluations. In these cases, [natural deportment](/pages/wikiore-natural-deportment) and laboratory measured <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses may be interpolated in the <b title=\"Digitised model of the deposit.\">resource model</b> using the current estimation methodology for [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical parameters at the operation. Estimates for <b title=\"Contained in unbroken ground.\">In-situ</b> grade [heterogeneity](/pages/wikiore-heterogeneity) using <b title=\"Uniform Conditioning\">UC</b> modelling (as discussed in the characterisation of [Induced deportment](/pages/wikiore-induced-deportment) and [bulk ore sorting](/pages/wikiore-bulk-sorting) responses) should also follow the current estimation <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>s and search parameters for the operation.\n\nGeostatistical estimation methods range in sophistication from simple [inverse distance weighting](https://en.wikipedia.org/wiki/Inverse_distance_weighting) methods to complex multi indicator [kriging](https://en.wikipedia.org/wiki/Kriging) or [conditional simulation](https://www.whittleconsulting.com.au/wp-content/uploads/2018/05/Conditional-Simulations-Tools-for-Modelling-Uncertainty-in-Open-Pit-Optimisation.pdf)s. In the absence of adequate <b title=\"Data that has a clear position in 3d space (eg. Drill holes, GPS etc…).\">spatial data</b> regarding the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses, minimal estimation techniques or domanial averages should be applied. As greater knowledge of the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> response develops, more sophisticated estimation methods provide greater control for the population of the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> response in the <b title=\"Digitised model of the deposit.\">resource model</b>.\n\nProcess Design and Simulation[](#Process_Design_and_Simulation)\n---------------------------------------------------------------\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> and simulation considers the integration and interactions of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques with the existing infrastructure and processing facilities of the operation. <b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> and simulation is an iterative activity that alternates with the optimisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies within the strategic mine plan. \n\n### Process Design[](#Process_Design)\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> assesses the equipment requirements, plant layout and material handling strategies for given <b title=\"Generic term for material properties.\">rock characteristics</b> and capacities to develop an operationally capable <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b>. During early stages of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> evaluations, several <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> designs are developed at a range of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacities. These designs provide an understanding of how operational and <b title=\"Expected upfront costs of a given scenario or plan.\">capital costs</b> change with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacity to assist optimisation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies in the strategic mine plan.\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b>s may include fixed, semi-mobile or mobile deployment options. Fixed options have a higher capital cost and lower operating cost and are best suited to a constant production capacity over a longer period. At the other end of the spectrum, mobile options have a lower capital cost and higher operating cost and offer flexibility to increase or decrease production capacity over shorter periods. Mobile or semi-mobile <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> plants are ideally suited to <b title=\"On-site test of Grade Engineering equipment (can be on/off line).\">Production Trial</b>s for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques and initial implementation.\n\n<b title=\"Configuration and optimisation of equipment selection and layout.\">process design</b> governs the operating and <b title=\"Expected upfront costs of a given scenario or plan.\">capital costs</b> for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques and the location of the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> plant can have a large influence over both costs. The largest operating cost associated with bulk <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques is the rehandling of product streams. Selecting a location that minimises product rehandle for one or more product streams can greatly reduce the operational costs of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. Furthermore, integrating <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> within existing material handling transfer or decision points can eliminate rehandle for one or more product streams, greatly reducing operating and <b title=\"Expected upfront costs of a given scenario or plan.\">capital costs</b> for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. Critical locations to consider are:\n\n*   Close to the [primary crusher](https://en.wikipedia.org/wiki/Crusher), to allow the upgraded product stream to tie into the <b title=\"Subjective term for the larger sized component of feed\">coarse</b> ore stockpile conveyor;\n*   At <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> storage facilities or deferred [stockpiles](https://en.wikipedia.org/wiki/Stockpile), to minimise rehandle of the downgraded product stream;\n*   At pit exits or in the mine, to minimise deviations in <b title=\"Movement of material from in-pit to ex-pit.\">haulage</b> or handling distances to and from the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> plant; and\n*   At the mine face, ideally between or within digging and loading activities to eliminate product rehandling.\n\n### Process simulation[](#Process_simulation)\n\nProcess simulation is used to assess the impact of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques on downstream production processes. These impacts depend on the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> technique. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening alter the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution in <b title=\"Material entering a predetermined system.\">feed</b> to the processing plant, often resulting in increased capacity in the [comminution](https://en.wikipedia.org/wiki/Comminution) <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b> which may be used to increase <b title=\"Metric for overall tonnage moving through a system within a specified time.\">throughput</b> or optimise [grinding](https://en.wikipedia.org/wiki/Mill_%28grinding%29) conditions to improve recovery. All <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques can increase the grade of the <b title=\"Material entering a predetermined system.\">feed</b> to the processing plant which can improve [flotation](https://en.wikipedia.org/wiki/Froth_flotation) recovery.\n\nProcess modelling and simulation is performed using the Integrated Extraction Simulator (IES). [IES](https://www.crcore.org.au/ies) is a cloud-based simulation covering the [comminution](https://en.wikipedia.org/wiki/Comminution) and [beneficiation](https://en.wikipedia.org/wiki/Beneficiation) activities of the entire operation from drilling and blasting through to final <b title=\"Product generally produced by metal ore mines.\">concentrate</b>. [IES](https://www.crcore.org.au/ies) incorporates the ability to simulate the processing performance of multiple ore types, optimise process settings to maximise plant performance within specified constraints and to perform <b title=\"IES specific term for repeated simulations of a circuit.\">mass simulation</b> and write responses back to the <b title=\"Digitised model of the deposit.\">resource model</b>.\n\nStrategic Mine Planning[](#Strategic_Mine_Planning)\n---------------------------------------------------\n\nOptimisation of the strategic mine plan provides a holistic approach to capture all impacts of new technologies and operational strategies deployed across the mining [value chain](https://en.wikipedia.org/wiki/Value_chain), over the entire life of the operation. The optimisation is value driven, with the primary objective to maximise [net present value](https://en.wikipedia.org/wiki/Net_present_value) within specified operational and processing constraints. For these reasons, optimisation of the strategic mine plan is the preferred method to evaluate <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques.\n\nInputs into Strategic mine planning include the <b title=\"Digitised model of the deposit.\">resource model</b> and operational parameters, constraints and <b title=\"Inputs used for business case evaluations.\">economic assumptions</b>. From these inputs, the value of each <b title=\"A spatially constrained unit within the resource model.\">block</b> in the <b title=\"Digitised model of the deposit.\">resource model</b> is calculated for each processing destination including <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> storage facilities. The maximum value of the <b title=\"A spatially constrained unit within the resource model.\">block</b> is assigned, and the <b title=\"Used in the surface mining industry to solve the Pit Limit Problem and to generate an approximate solution to the Extraction Sequence Problem.\">Lerchs-Grossman algorithm</b> is applied to develop a series of nested shells by adjusting the revenue factor applied to each block. These nested shells provide guidance to the selection of the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) and design of phases to be mined. The material can then be scheduled, and [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) optimised, for all processing destinations in the operation.\n\nThe inclusion of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques offer flexibility and opportunity for optimisation in their application and operational settings, such as <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> or sorting [cut-off](/sub-topics/scheduling-and-cut-off-optimisation). These options can be included in the optimisation of the strategic mine plan in much the same way trade-offs between <b title=\"Metric for overall tonnage moving through a system within a specified time.\">throughput</b> and recovery with <b title=\"Target product size post grind.\">grind size</b> have traditionally been assessed. The figure below shows the interaction of operational decisions for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> and process plant settings that can be optimised in the strategic mine plan.\n\nOnce an optimal schedule and [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grade policy is produced, the resultant material movement and cashflow provides the best estimate of economic benefits relating to the scenario modelled. In addition, the material movements can be combined with power, fuel, steel and water consumption (from process and <b title=\"Movement of material from in-pit to ex-pit.\">haulage</b> models) to provide environmental metrics relating to planned production and quantity the <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock and [tailings](https://en.wikipedia.org/wiki/Tailings) generated. A comparison of the strategic mine plan with and without <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques provides a robust quantification of anticipated economic and [environmental impacts](https://en.wikipedia.org/wiki/Environmental_effects_of_mining) due to <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>.\n\nComplete strategic mine plan optimisations for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques have been performed with [Whittle](https://www.whittleconsulting.com.au/) Consulting Enterprise Optimisation, Geovia [Whittle](https://www.whittleconsulting.com.au/)™, [COMET](https://www.cometstrategy.com/index.php) Strategy and [COMET](https://www.cometstrategy.com/index.php) Scheduler and [Datamine](https://www.dataminesoftware.com/) [NPV](https://en.wikipedia.org/wiki/Net_present_value) Scheduler. However, due to the magnitude of work involved in performing a complete mine optimisation, early [opportunity assessment](/sub-topics/opportunity-assessments)s for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques are performed within the operation’s existing [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) and phases. These evaluations operate under the presumption that if sufficient value can be found within the existing mine design, performing a complete Strategic mine planning optimisation will only unlock greater value.\n\n[![Interaction of preconcentration and process plant settings optimised in the strategic mine plan.](https://res.cloudinary.com/shapeable/image/upload/v1686822777/wikiore/218.png \"Interaction of preconcentration and process plant settings optimised in the strategic mine plan.\")](https://res.cloudinary.com/shapeable/image/upload/v1686822777/wikiore/218.png \"Interaction of preconcentration and process plant settings optimised in the strategic mine plan.\")\n\nInteraction of preconcentration and process plant settings optimised in the strategic mine plan.\n\n### Preconcentration Impact on Operational Capacities[](#Preconcentration_Impact_on_Operational_Capacities)\n\nOptimising the strategic mine plan requires balancing constraints to the rate of production imposed by mining, processing and marketing capacities. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> introduces an additional capacity to optimise that increases the effective processing capacity of an operation and changes the economic value of material, increasing the quantity of ore mined. As a result, the optimal balance between mining, processing, marketing and <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacities must be established and there may be a need to increase mining and marketing capacities.\n\nThe requirement for additional <b title=\"Maximum potential material moveable under current constraints.\">mining capacity</b> with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> is necessary for operations that are, or become, mining constrained. Generally, this is the optimal configuration for underground <b title=\"Yielding or containing metal.\">metalliferous</b> mines where <b title=\"Maximum potential material moveable under current constraints.\">mining capacity</b> is the most capital-intensive constraint on production. As a result, the opportunity cost of production raises the [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) for mined material and encourages the use of highly selective mining methods. Optimal <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies will seek to relieve the pressure on mining [bottlenecks](https://en.wikipedia.org/wiki/Bottleneck_%28production%29) by preconcentrating material prior to the constraining activity, such as the <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> of ore prior to an underground hoist. As a result, greater capacity in downstream mining activities are required to maintain the quantity of ore processed. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> may also unlock greater value in mining constrained operations by enabling a transition to lower-cost, less selective mining methods, simultaneously increasing resource utilisation and the quality of ore sent to processing destinations.\n\nConversely, the requirement for additional <b title=\"Maximum potential material moveable under current constraints.\">mining capacity</b> with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> is less prevalent in operations that are processing constrained. Generally, this is the optimal configuration for open-pit <b title=\"Yielding or containing metal.\">metalliferous</b> mines where processing capacity is the most capital-intensive constraint on production. As a result, the opportunity cost of production raises the [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) applied to processing, generating an excess quantity of economic ore from the mine. This excess ore is often deferred to [stockpiles](https://en.wikipedia.org/wiki/Stockpile) or allocated to lower-value processing destinations, such as dump [leach](https://en.wikipedia.org/wiki/Leaching_%28metallurgy%29). The increase in effective processing capacity with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> allows a greater quantity of ore to be treated as it is mined, reducing the quantity of material stockpiled or processed at a lower-value destination. This accelerates both the quantity of metal and the cashflow produced by the operation, significantly increasing NPV.\n\nStrategy Evaluation[](#Strategy_Evaluation)\n-------------------------------------------\n\nStrategy evaluation involves sensitivity, scenario and simulation modelling to find the optimal <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategy and understand the value drivers for that strategy.\n\nSensitivity analysis is used to flex individual assumptions regarding <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> performance and costs to understand the impact each assumption has on the value proposition. This information is useful in early [opportunity assessment](/sub-topics/opportunity-assessments)s to identify critical assumptions for detailed examination in the next stage of evaluation.\n\nScenario analysis examines the effect of multiple simultaneous changes to <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> assumptions. Common examples of scenario analysis applied to <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> evaluations include the assessment of:\n\n*   Different individual or combinations of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques;\n*   Different deployment capacities and locations for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques; and\n*   Staging of capital and scaling-up of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> capacity.\n\nSimulation analysis assigns probabilistic distributions to uncertain variables and through repeat analyses determines the probabilistic range of likely outcomes. During the evaluation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques, simulation analysis is best suited to examine the impact of uncertainty in the modelled <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> responses. However, due to the magnitude of work involved, simulation analysis may be applied during detailed [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) studies for deployment options of the selected <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> technique(s).\n\nProject Evaluation Stages[](#Project_Evaluation_Stages)\n=======================================================\n\nThe time, personnel and investment required to examine new technologies and strategies to deploy at an operation can be substantial. A capital investment model is used to assist in focussing a company’s limited resources on the examination of the highest value options for an operation. This model uses a stage-gate approach to progress the most promising options and strategies from conception to operation at site. CRC ORE have followed this approach to apply the framework for evaluation of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies at varying levels of detail to the different stages of project evaluation. A description of the different project evaluation stages is provided in the following Table. \n\n| **Project Stage**                                            | **Description**                                              |\n| ------------------------------------------------------------ | ------------------------------------------------------------ |\n| [opportunity assessment](/sub-topics/opportunity-assessments) | Broad assessment of all available options, preliminary ranking by order of magnitude valuation and identify critical assumptions that require further examination. |\n| [concept study](/topics/grade-engineering-studies)           | Top ranked options and critical assumptions identified in the [opportunity assessment](/sub-topics/opportunity-assessments) are assessed in greater detail to provide higher confidence in their ranking and valuation. |\n| Production Trial                                             | Top ranked option(s) from [concept study](/topics/grade-engineering-studies) are demonstrated at pilot scale to prove concept in production environment and confirm critical assumptions. |\n| pre [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) study | Detailed assessment of successful options trialled including alternative designs and layouts, capacities and deployment strategies, detailed risk assessment and identify best strategy for [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) study. |\n| [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) study | Detailed assessment of the selected strategy including definitive designs and cost estimates, environmental and social impact assessments and permitting, licensing and supply contracts for final approval to invest and implement the strategy. |\n| Implementation                                               | Commission selected strategy, optimise performance and integrate within production. |\n| Operation                                                    | Monitor and sustain performance within production.           |\n\nResults and Discussion[](#Results_and_Discussion)\n=================================================\n\nThe following results represent a compilation of 32 [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering)® evaluations performed across fifteen sites using the framework described in this paper. The following Table provides relevant information regarding the project, commodities, <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques examined, whether the evaluation considered the full or partial optimisation of the strategic mine plan and the change in the [NPV](https://en.wikipedia.org/wiki/Net_present_value) for each <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> option. The relative change in [NPV](https://en.wikipedia.org/wiki/Net_present_value) is also displayed in the Figure below.\n\n [![Chapter4 Table2](https://res.cloudinary.com/shapeable/image/upload/v1686822780/wikiore/221.png)](https://res.cloudinary.com/shapeable/image/upload/v1686822780/wikiore/221.png)   \n\n\n[![Change in NPV with preconcentration for 32 evaluations across fifteen operations](https://res.cloudinary.com/shapeable/image/upload/v1686822782/wikiore/219.png \"Change in NPV with preconcentration for 32 evaluations across fifteen operations\")](https://res.cloudinary.com/shapeable/image/upload/v1686822782/wikiore/219.png \"Change in NPV with preconcentration for 32 evaluations across fifteen operations\")\n\nChange in NPV with preconcentration for 32 evaluations across fifteen operations\n\nThe evaluations are dominated by <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> screening assessments and [bulk ore sorting](/pages/wikiore-bulk-sorting) assessments. The results show a wide range of possible economic outcomes can be achieved with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> , including the fact that not all orebodies are amenable to certain <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques.\n\nThe average improvement in [NPV](https://en.wikipedia.org/wiki/Net_present_value) was 12.8% across all <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques; screening techniques showed an average increase of 12.8% [NPV](https://en.wikipedia.org/wiki/Net_present_value) and [bulk ore sorting](/pages/wikiore-bulk-sorting) 17.0% NPV. Partial optimisation of the strategic mine plan yielded an average increase of 9.3% NPV, while a full optimisation returned 18.5% NPV. These results highlight the additional value from <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> that is unlocked with a complete optimisation of the strategic mine plan.\n\nThe Figure below presents a boxplot of selected production and environmental metrics for twelve <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> screening and [bulk ore sorting](/pages/wikiore-bulk-sorting) options across six operations. Not all evaluations presented in the Table above have been examined for changes in environmental metrics.\n\nThe results show a wide range of outcomes in production and environmental metrics are possible. The impact that <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> has on the quantity of ore processed and [tailings](https://en.wikipedia.org/wiki/Tailings) and <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock generated is often ambiguous. Significant increases in these metrics are possible with the expansion of the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) as a result of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. Similarly, a reduction in <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock is possible with increases in ore processed and [tailings](https://en.wikipedia.org/wiki/Tailings) generated due to a significant lowering of the economic [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> and little opportunity to expand the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks). In all scenarios examined, <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> increased the grade of ore treated and the total metal recovered from the orebody, indicating greater resource utilisation is achieved with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>.\n\nThe results also show significant decreases in the energy, emission, water and steel intensity of <b title=\"Yielding or containing metal.\">metalliferous</b> production are possible with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. These intensities of production represent the change in the energy, water and steel consumed, and emissions generated, relative to the production of a unit of metal output. On average, a 6% reduction in energy intensity, 8% reductions in emission and water intensities, and a 11% reduction in the steel intensity of [comminution](https://en.wikipedia.org/wiki/Comminution) resulted from <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. These figures represent the inputs directly consumed by the operation and do not account for embedded energy, emissions and water in inputs consumed.\n\nFurthermore, the results show that <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies were able to more than offset the increased energy, water, emission and steel requirements with additional metal production in scenarios where the quantity of ore processed significantly increased.\n\n[![Boxplot of production and environmental metrics for twelve preconcentration options across six operations](https://res.cloudinary.com/shapeable/image/upload/v1686822784/wikiore/220.png \"Boxplot of production and environmental metrics for twelve preconcentration options across six operations\")](https://res.cloudinary.com/shapeable/image/upload/v1686822784/wikiore/220.png \"Boxplot of production and environmental metrics for twelve preconcentration options across six operations\")\n\nBoxplot of production and environmental metrics for twelve preconcentration options across six operations\n\nPreconcentration at Greenfield projects[](#Preconcentration_at_Greenfield_projects)\n-----------------------------------------------------------------------------------\n\n[Greenfield](https://en.wikipedia.org/wiki/Greenfield_land)s projects have greater flexibility to alter site layouts and adjust operational capacities to capture the full benefits provided by <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. However, there is less ability to trial and test <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques at [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) projects, often creating greater uncertainty whether to invest in <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategies for [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) projects. In the results presented in Table 2, <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> options applied to [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) projects returned an average increase of 16.1% NPV, while [Brownfield](https://en.wikipedia.org/wiki/Brownfield_land) projects returned an average increase of 11.2% [NPV](https://en.wikipedia.org/wiki/Net_present_value) with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>. The largest increase in [NPV](https://en.wikipedia.org/wiki/Net_present_value) from the 32 evaluations presented in Table 2 was also a [Greenfield](https://en.wikipedia.org/wiki/Greenfield_land) project (6C) and provides an excellent example of the additional benefits that can be achieved by altering site layouts and mine designs for <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>.\n\nThe project is evaluating the development of an intrusive-hosted, structurally controlled stockwork gold and silver deposit. The orebody lends itself to development as three [open pit](https://en.wikipedia.org/wiki/Open-pit_mining)s to be processed by SABC [comminution](https://en.wikipedia.org/wiki/Comminution), [flotation](https://en.wikipedia.org/wiki/Froth_flotation), CIL and electrowinning <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b>s. The operation is processing constrained and [stockpiles](https://en.wikipedia.org/wiki/Stockpile) a significant portion of lower-value ore at a central location between the three pits. The stockpiled ore will be reclaimed and processed toward the end of the mine’s life.\n\nAlthough the project is profitable, [feasibility](https://en.wikipedia.org/wiki/Feasibility_study) studies failed to achieve a threshold return for investment. <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> techniques, including screening and dense media separation, were examined to improve the economics of the operation. [natural deportment](/pages/wikiore-natural-deportment) testwork from <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> samples across the three pits revealed a consistent, very high upgrade signature in <b title=\"Subjective term for the smaller sized component of feed\">fines</b> throughout the orebody. Bulk samples taken from a mining [adit](https://en.wikipedia.org/wiki/Adit) through the main pit were screened and [assay](https://en.wikipedia.org/wiki/Assay)ed to confirm the very high [natural deportment](/pages/wikiore-natural-deportment) response was present at <b title=\"Run of mine\">ROM</b> PSD. Strategic mine planning used the [natural deportment](/pages/wikiore-natural-deportment) testwork to reoptimise pits, phases and site layouts with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening. The study found:\n\n*   The optimal <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> strategy sent high-grade ore directly to the processing plant and upgraded lower-value ore through the [screening plant](https://en.wikipedia.org/wiki/Mechanical_screening);\n*   <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> enabled a significant expansion of the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks)s and increased resource utilisation;\n    *   Lowering the mining [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grade by 50%,\n    *   Increasing mineable resources by 80%,\n    *   Reducing striping ratios by 55%,\n    *   Increasing <b title=\"Expected longevity of mining operations under a given scenario or plan.\">mine life</b> by 20%, and\n    *   Increasing total gold production by 20%.\n*   <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> reduced the quantity of material processed via [stockpiles](https://en.wikipedia.org/wiki/Stockpile) and enabled the processing plant to be relocated to a central location between the three pits;\n    *   Reducing annual material movement by 15%,\n    *   Reducing cash costs and total costs by 10%, and\n    *   Reducing implementation [capex](https://en.wikipedia.org/wiki/Capital_expenditure) by 5%.\n*   While a reduction in process plant capacity could maintain a similar production profile with <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b>, the significant increase in the quantity of economic ore mined warranted a processing plant of similar capacity, or slightly larger, to maximise NPV.  \n\nThe use of <b title=\"Methodologies used to separate gangue from valuable material.\">preconcentration</b> by screening improved the [NPV](https://en.wikipedia.org/wiki/Net_present_value) of the project by 34% and has become the primary plan to develop the orebody."},"organisations":[],"embeds":{"citations":[],"imageAssets":[],"posts":[]},"video":null,"banner":{"id":"65d2ed72ebf7bb9388ffa964","image":{"id":"image_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","url":"https://res.cloudinary.com/shapeable/image/upload/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp","thumbnails":{"mainBanner":{"id":"thumbnails-main-banner-file_copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9","url":"https://res.cloudinary.com/shapeable/image/upload/c_limit,w_1440/v1734653789/copper-connect/banner/mine-development-topic-banner_image__COPPER_Thumb_1300x812_-_VALUE_tint-02_o3los9.webp"}}}},"fileAssets":[],"citations":[],"feedEntries":[],"posts":[],"subTopics":[{"id":"6763834ae7373dad06f44204","name":"Study Engagement Principles","path":"/sub-topics/study-engagement-principles-1","outlineNumber":"2.1.1","slug":"study-engagement-principles-1","__typename":"Platform_SubTopic","color":{"id":"65d2ed7febf7bb9388ffab3a","name":"Core 12","value":"#3b6673"},"openGraph":{"image":null}},{"id":"676383a1e7373dad06f44213","name":"Opportunity Assessments","path":"/sub-topics/opportunity-assessments-1","outlineNumber":"2.1.2","slug":"opportunity-assessments-1","__typename":"Platform_SubTopic","color":{"id":"65d2ed7febf7bb9388ffab3a","name":"Core 12","value":"#3b6673"},"openGraph":{"image":null}},{"id":"676383d0e7373dad06f4421c","name":"Data Requirements","path":"/sub-topics/data-requirements-1","outlineNumber":"2.1.3","slug":"data-requirements-1","__typename":"Platform_SubTopic","color":{"id":"65d2ed7febf7bb9388ffab3a","name":"Core 12","value":"#3b6673"},"openGraph":{"image":null}}],"moderators":[],"innovations":[]}}},"pageContext":{"lang":{"id":"en","path":"","iso":"en","name":"English","label":"English"},"availableEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend","OrganisationType","HorizonType","Economy","FeedEntry","Video","Citation","Objective","ProfileType","ExpertiseLevel"],"detailEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend"],"site":{"id":"65d2edd1ebf7bb9388ffb0df","slug":"connect-ore","name":"ConnectOre","url":"https://connectore.org","title":"ConnectOre","twitter":null,"threads":null,"facebook":null,"linkedin":null,"instagram":null,"flickr":null,"tiktok":null,"youtube":null,"ownerName":"ICAA","recaptchaKey":"6LfG2J0qAAAAAHDCFfJnrWOj6DiWJGik5BAa_7p8","googleSiteVerification":null,"platformName":"ConnectOre","platformUrl":"https://platform.connectore.org","supportEmail":null,"contactEmail":null,"mainMenu":{"id":"65d2edaaebf7bb9388ffaf79","slug":"website-navigation"},"linearMenu":null,"entityViews":[{"id":"67528c24c135ebcfc668f1ba_65d2edd1ebf7bb9388ffb0df","name":"Value Chain","hash":"value-chain","label":null,"slug":"value-chain","count":0,"showCount":null,"disabled":null,"icon":{"id":"6752a61b8b51dfa7b77b1e37","name":"Connections Navigator Icon Glyph","slug":"connections-navigator-icon-glyph","component":"ConnectionsNavigatorIconGlyph"},"childEntityTypes":[{"id":"6667fa4ff794dd6e045135c1","name":"Value Chain Theme","internalName":"Trend"},{"id":"6667fa58f794dd6e045135c6","name":"Topic","internalName":"Topic"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"6757ef1ede8adbd45cf19474_65d2edd1ebf7bb9388ffb0df","name":"Bulletin Board","hash":"bulletin-board","label":null,"slug":"bulletin-board","count":0,"showCount":null,"disabled":null,"icon":{"id":"681c2cebbccc5a72d8382f31","name":"Tag Icon","slug":"tag-icon","component":"TagDotIconGlyph"},"childEntityTypes":[],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528d88c135ebcfc668f31b_65d2edd1ebf7bb9388ffb0df","name":"Innovations","hash":"innovations","label":null,"slug":"innovations","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528d74c135ebcfc668f315","name":"Innovation","internalName":"innovation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67625640fbc7c50d8644c592_65d2edd1ebf7bb9388ffb0df","name":"Community","hash":"community","label":null,"slug":"community","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528404c135ebcfc668ee1c","name":"Person","internalName":"Person"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528e1bc135ebcfc668f33a_65d2edd1ebf7bb9388ffb0df","name":"Stakeholder Map","hash":"stakeholder-map","label":null,"slug":"stakeholder-map","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"66680141f794dd6e0451367a","name":"Organisation","internalName":"Organisation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67529040c135ebcfc668f4ae_65d2edd1ebf7bb9388ffb0df","name":"References","hash":"references","label":null,"slug":"references","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"6752902fc135ebcfc668f4a4","name":"Article","internalName":"FeedEntry"},{"id":"67529039c135ebcfc668f4aa","name":"Citation","internalName":"Citation"},{"id":"67528de9c135ebcfc668f328","name":"Catalyst","internalName":"catalyst"},{"id":"67528df9c135ebcfc668f32d","name":"Page","internalName":"page"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]}],"entityAppViews":[],"entityOnboardingViews":[{"id":"680c3a4ebc80e4d0f3cfa2ef_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Step","hash":"trend-expertise-step","label":null,"slug":"trend-expertise-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Onboarding Grid","slug":"trend-expertise-onboarding-grid","label":null,"updated":"2025-04-26T01:42:10.20","layout":{"id":"680c3993bc80e4d0f3cfa2dd","name":"Slice Onboarding Trend Expertise Grid","slug":"slice-onboarding-trend-expertise-grid","component":"SliceLayoutOnboardingTrendExpertiseGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":null,"titleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_titleRich","text":"Are you **an industry expert** in any of these Value Chain Themes?"}}]},{"id":"680c3a85bc80e4d0f3cfa2fa_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Step","hash":"profile-types-step","label":null,"slug":"profile-types-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Onboarding Grid","slug":"profile-types-onboarding-grid","label":null,"updated":"2025-04-26T01:44:34.63","layout":{"id":"680c3a13bc80e4d0f3cfa2e4","name":"Slice Onboarding Profile Types Grid","slug":"slice-onboarding-profile-types-grid","component":"SliceLayoutOnboardingProfileTypesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"Which best describes you?","titleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]},{"id":"680c3aaabc80e4d0f3cfa2ff_65d2edd1ebf7bb9388ffb0df","name":"Objectives Step","hash":"objectives-step","label":null,"slug":"objectives-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df","name":"Objectives Onboarding Grid","slug":"objectives-onboarding-grid","label":null,"updated":"2025-04-26T01:45:12.76","layout":{"id":"680c3a3fbc80e4d0f3cfa2ea","name":"Slice Onboarding Objectives Grid","slug":"slice-onboarding-objectives-grid","component":"SliceLayoutOnboardingObjectivesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"What are your priority objectives?","titleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]}],"gptLanguages":[{"id":"65d2eda5ebf7bb9388ffaf1f","name":"English","slug":"english","iso":"en","locale":"en_US","path":"/en","label":"English","menuLabel":null},{"id":"666f70b6e051ad9ef086d1be","name":"Arabic","slug":"arabic","iso":"ar","locale":"ar_AE","path":"/ar","label":"عربي","menuLabel":null},{"id":"666f7161e051ad9ef086d1c4","name":"Spanish","slug":"spanish","iso":"es","locale":"es_ES","path":"/es","label":"español","menuLabel":null},{"id":"666f71c9e051ad9ef086d1c8","name":"German","slug":"german","iso":"de","locale":"de_DE","path":"/de","label":"Deutsch","menuLabel":null},{"id":"65d2eda5ebf7bb9388ffaf20","name":"French","slug":"french","iso":"fr","locale":"fr_FR","path":"/fr","label":"Français","menuLabel":null}],"gptQuestionTemplate":{"id":"662c7f6e81ef1920e3638518","name":"Standard Open Question","slug":"standard-open-question","path":"/prompt-templates/standard-open-question","__typename":"PromptTemplate","_entityTypeName":null,"label":"CopperAI","type":{"id":"662c7f1981ef1920e363850f","name":"Ask","slug":"ask"},"description":{"text":"This template is tailored for providing accurate responses based on specific context. It integrates contextual details from \"contextual information\" and addresses the \"target question\". The response is always in English, prioritizing clarity. If the answer is unknown, the template openly acknowledges this, ensuring honesty and avoiding speculation. This format is ideal for precise, context-sensitive, and truthful answering."},"summary":{"text":"Ask a general question about Website content"},"gptModel":{"id":"67564c4f2f6749787d0e03dc","name":"OpenAI GPT 4o","slug":"open-ai-gpt-4-o","dataSetId":"openai:gpt-4o"},"variablesPrompt":{"text":""},"submitLabel":"Ask","languages":[],"icon":{"id":"67528b9cc135ebcfc668f1a3","name":"AI Lower Case Icon Glyph","slug":"ai-lower-case-icon-glyph","component":"AiLowerCaseIconGlyph"},"variables":[{"id":"6668076bf794dd6e045138d9","name":"question","slug":"question","useVectorStore":true,"label":"What would you like to know?","labelAnother":null,"help":{"text":""},"options":{"text":""},"defaultValue":null,"entityTypes":[],"controlType":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"},"labelContextual":null,"labelAnotherContextual":null,"helpContextual":{"text":""},"optionsContextual":{"text":""},"defaultValueContextual":null,"entityTypesContextual":[],"controlTypeContextual":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"}}]},"advertisements":[],"logoVerticalOffset":null,"logoHorizontalOffset":null,"logoVerticalOffsetMobile":null,"logoHorizontalOffsetMobile":null,"logoVerticalOffsetTablet":null,"logoHorizontalOffsetTablet":null,"logoVerticalOffsetDesktop":null,"logoHorizontalOffsetDesktop":null,"logoHeightMobile":44,"logoHeightTablet":null,"logoHeightDesktop":null,"headerHeightMobile":null,"headerHeightTablet":null,"headerHeightDesktop":null,"logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807465/copper-connect/site/copper-connect_logo__CopperOre_Master_Brand_Identity-colour_cd4vgg.webp","type":"image/webp","width":945,"height":266},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807452/copper-connect/site/copper-connect_logoInverted__CopperOre_Master_Brand_Identity-white_chnucx.webp","type":"image/webp","width":945,"height":266},"footerMenu":null,"footerSecondaryMenu":null,"footerContent":{"text":"© {year} ConnectOre. All Rights Reserved\n"},"creator":null,"poweredBy":{"id":"65d2edadebf7bb9388ffafc8","name":"Shapeable","slug":"shapeable","url":"https://shapeable.ai","logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1674010034/platform/organisation/shapeable_logo__shapeable.png","type":"image/png","width":1174,"height":368},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1729474494/copper-connect/organisation/shapeable_logoInverted__shapeable-logo-inverted_sdcfpk.png","type":"image/png","width":392,"height":118},"logoSubtle":null},"poweredByLabel":null,"poweredByContent":{"text":""},"explorerPage":{"name":"Explorer","title":null,"slug":"explorer","path":"/explorer"},"termsPage":{"name":"Terms of Use","title":null,"slug":"terms-of-use","path":"/terms-of-use"},"homePage":null,"knowledgeHubPage":{"name":"News","title":null,"slug":"news","path":"/news"},"privacyPolicyPage":{"name":"Privacy Policy","title":null,"slug":"privacy-policy","path":"/privacy-policy"},"summary":{"text":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action"},"thumbnail":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"},"openGraph":{"title":"ConnectOre","date":"2026-07-31T04:44:47.80","description":{"plain":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action\n"},"image":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png","type":"image/png","thumbnails":{"full":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"}}}},"termsAndConditions":{"text":""},"privacyPolicy":{"text":"At ConnectOre we respect your privacy. We want to ensure that you get the information, content, and experiences that matter most to you. ConnectOre is committed to protecting the privacy of its stakeholders, communities, and other contacts.\n\n## Scope\n\nThis privacy policy applies to all personal data processed by full-time and part-time employees, volunteers when acting on behalf of ConnectOre contractors and partners doing business on behalf of ConnectOre, as well as all legal entities, all operating locations in all countries, and all business processes conducted by ConnectOre.\n\n## Information Collected\n\n#### What information do we collect?\n\nConnectOre collects the following personal data in line with the use purposes explained in a subsequent section:\n\n  * Your name and contact details\n  * Online profile data/usage\n  * Contact information\n  * Social media profile information\n  * Education and professional information\n  * Registration and participation in ConnectOre events and activities \n  * Information about service usage\n  * Cookies\n  * Authentication data\n  * Location information\n  * Author and peer review information\n  * Other information you upload or provide to us\n\n#### How do we use your information?\n\nConnectOre uses (and, where specified, shares) your personal information for the following purposes:\n\n  * To provide support or other services. ConnectOre may use your personal information to provide you with support or other services that you have ordered or requested. ConnectOre may also use your personal information to respond directly to your requests for information, including registrations for webinars, or other specific requests, or pass your contact information to the appropriate ConnectOre supplier or reseller for further follow-up related to your interests.\n  * To provide information based on your needs and respond to your requests. ConnectOre may use your personal information to provide you with notices of new product releases and service developments.\n  * To administer products. ConnectOre may contact you if you make use of (digital) products we offer, to confirm certain information (for example, that you did not experience problems in a download process). We may also use this information to confirm compliance with licensing and other terms of use and may share it with your company/institution.\n  * To assist in your participation in ConnectOre activities. ConnectOre will communicate with you, if you are participating in certain ConnectOre activities such as ConnectOre Summit, authoring or reviewing a ConnectOre article, or ConnectOre humanitarian activities. ConnectOre may send you information such as update messages related to those activities (such as but not limited to the event's content, and event logistics)\n  * To update you on relevant ConnectOre events and opportunities. ConnectOre may communicate with you regarding relevant ConnectOre events and opportunities.\n  * To protect ConnectOre content and services. We may use your information to prevent potentially illegal activities and to enforce our terms and conditions.\n  * To get feedback or input from you. In order to deliver products and services of most interest to our stakeholders, from time to time, we may ask you to provide us input and feedback (for example through surveys).\n\n#### How can you control your information?\n\nYou can control the information we have about you and how we use as follows:\n\n  * If you are a registered guest for ConnectOre Annual Summit 2021, any request for review, revise or correction of your personal data can be sent to john.fennell@copper.com.au specifying your request.\n\n#### Personal data about minors and children\n\nConnectOre does not knowingly collect data from or about children under 16 without the permission of parent(s)/guardian(s). If we learn that we have collected personal information from a child under 16, we will delete that information as quickly as possible. If you believe that we might have any information from or about a child under age 16, please contact us.\n\n#### How will you know if the Privacy Policy is changed?\n\nConnectOre may update its Privacy Policy from time to time. If we make any material changes you will be notified by means of a notice on our website prior on the date the change becomes effective. We encourage you to periodically review this page for the latest information on our privacy practices.\n\n## Technical And Regulatory Information\n\n#### Logging practices\n\nConnectOre automatically records the Internet Protocol (IP) addresses of visitors. The IP address is a unique number assigned to every computer on the internet. Generally, an IP address changes each time you connect to the internet (it is a \"dynamic\" address). Note, however, that if you have a broadband connection, depending on your individual circumstance, the IP address that we collect may contain information that could be deemed identifiable. This is because, with some broadband connections, your IP address doesn't change (it is \"static\") and could be associated with your personal computer.\n\nAs well as recording the IP addresses of users, ConnectOre may also keep track of sites that users visited immediately prior to visiting ConnectOre's website and the search terms they used to find it. We keep track of the pages visited on ConnectOre's website, the amount of time spent on those pages and the types of searches done on them. Your searches remain confidential and anonymous. ConnectOre uses this information only for statistical purposes to find out which pages users find most useful and to improve the website.\nConnectOre also captures and stores information that you transmit. This may include:\n\n  * Browser/Device type/version\n  * Operating system used\n  * Media Access Control (MAC) address\n  * Date and time of the server request\n  * Volume of data transferred\n\n#### External links behaviour\n\nSome of the links on ConnectOre's websites link to other sites created and maintained by other public- and/or private-sector organizations. ConnectOre provides these links solely for your information and convenience. When you transfer to an outside website, you are leaving ConnectOre domain, and ConnectOre's information management policies no longer apply. ConnectOre encourages you to read the privacy statement of each external website that you visit before you provide any personal data.\n\n#### Cookies and web beacons\n\nCookies and web beacons are electronic placeholders that are placed on your device by websites to track your individual movements on that website over time. ConnectOre uses both session-based cookies (which last only for the duration of the user's session) and persistent cookies (which remain on your device and provide information about the session you are in and waits for the next time you use that site again).\n\nThese cookies and web beacons provide useful information to ConnectOre, enabling us to recognize repeat users, facilitate the user's access to and use of our sites, allows us to track usage behavior, and to balance the usage of our websites on all ConnectOre web servers.\nTracking cookies, third-party cookies, and other technologies such as web beacons may be used to process additional information, enable non-core functionalities on ConnectOre website and enable third-party functions (such as a social media \"share\" link). We may also include web beacons and other similar technology in promotional email messages to determine whether the messages have been opened.\n\n#### Do Not Track (DNT)\n\nThe online advertising industry has self-regulatory initiatives designed to provide consumers a choice in the types of ads they may see online and to conveniently opt-out from online behavioral ads served by some or all of the companies participating in these programs. Our websites do not respond to DNT consumer browser settings.\n\n#### Responses to legal requests\n\nConnectOre reserves the right to share your information to respond to duly authorized information requests of governmental authorities or where required by law.\n\n#### Your data rights\n\nConnectOre complies with all applicable data privacy laws and regulations including, but not limited to, the General Data Protection Regulation (GDPR) and the California Consumer Privacy Act (CCPA). Under these laws and regulations, you may have certain rights to your data. Should you wish to exercise any of these rights, please send an email request to john.fennell@copper.com.au with \"Data Privacy Request'' in the subject line and in the email please identify the specific privacy right you request assistance with. Please note additional information may be requested prior to fulfilling a request and that ConnectOre reserves the right to charge a fee, where permitted, to cover the cost of certain requests.\n\n#### How do I contact you if there is an issue?\nIf you have any questions or concerns about this Privacy Policy or about the use of your personal information, please feel free to contact us by email at john.fennell@copper.com.au"},"welcomeUrl":"https://connectore.org/app/welcome","welcomeTitle":"Welcome to ConnectOre and thanks for joining us! ","invitationAction":"join the ConnectOre community","setupCompletionMessage":null,"languages":[],"brandColors":[],"showLogin":true,"showShareMenu":null,"showFollowMenu":true,"showPlatformLogin":null,"showContactUs":null,"loginLabel":"Explorer Login","platformLoginLabel":"Community Platform","headerButtons":[]},"includeProfile":true,"disableProfileEditing":false,"dynamicEntityTypeNames":["Person","Organisation"],"profilePath":"/app/profile","welcomePath":"/app/welcome","id":"65d2eddfebf7bb9388ffb1f5","slug":"grade-engineering-studies","entityPath":"/topics/grade-engineering-studies","openGraph":{},"entityTypeName":"Topic","name":"Grade Engineering Studies","updated":"2024-12-20T04:53:24.27","__type":"Topic"}},
    "staticQueryHashes": ["1044227382","1158597448","1242646999","1427075558","1452322194","1520036161","1545705019","1586309863","1606754935","1816168740","1864381666","1903214493","1945056504","1989845544","2034981229","2181044613","2409034939","2463401854","2526615987","2642656775","2862279633","2867243664","2910164142","2912920178","296816903","3073584486","3150399266","3172506128","3320076387","3447680494","3453148481","3624873332","364221563","3692255024","3778988535","3782604890","4091857177","4216505212","591477963","701411134","758936535","80004486","857137463","881103158"]}