{
    "componentChunkName": "component---src-gatsby-entities-sub-topic-tsx",
    "path": "/sub-topics/short-term-planning-impact",
    "result": {"data":{"platform":{"subTopic":{"__typename":"Platform_SubTopic","_schema":{"label":"Sub Topic","pluralLabel":"Sub Topics"},"openGraph":{"title":"Short Term Planning Impact","description":{"text":"![BannerTruck](https://res.cloudinary.com/shapeable/image/upload/v1687316306/wikiore/181.jpg)  \n \n\n[Methodology](/sub-topics/short-term-planning-methodology) | [Impact](/sub-topics/short-term-planning-impact) | [Case Study](/sub-topics/short-term-planning-case-study)\n\nThe previous sections outlined how to plan an operation that includes <b title=\"Grade..."},"image":null},"id":"65d2edd7ebf7bb9388ffb186","slug":"short-term-planning-impact","name":"Short Term Planning Impact","path":"/sub-topics/short-term-planning-impact","outlineNumber":"2.8.2","color":{"__typename":"Platform_Color","id":"65d2ed7febf7bb9388ffab3a","slug":"core-12","name":"Core 12","value":"#3b6673","darkValue":"#2b4b56","veryDarkValue":"#1c3239"},"intro":{"id":"65d2edd7ebf7bb9388ffb186_intro","text":""},"description":{"id":"65d2edd7ebf7bb9388ffb186_description","text":"![BannerTruck](https://res.cloudinary.com/shapeable/image/upload/v1687316306/wikiore/181.jpg)  \n \n\n[Methodology](/sub-topics/short-term-planning-methodology) | [Impact](/sub-topics/short-term-planning-impact) | [Case Study](/sub-topics/short-term-planning-case-study)\n\nThe previous sections outlined how to plan an operation that includes <b title=\"Grade Engineering\">GE</b> but <b title=\"Gravel used to pack the top of blast holes to confine explosive energy.\">stemming</b> from these sections are one of the challenges, which is equipment productivity impacting labour productivity and therefore operational productivity.  \n  \nHistorically, when higher production rates were required, more capital i.e. more equipment and was deemed the appropriate solution. Lately, industry is more inclined towards the use of technology for <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> improvements with some mixed results albeit some technologies are still in its infancy.  \n  \nThe first steps in ensuring that the <b title=\"Grade Engineering\">GE</b> targets can be met is to look at the operational challenges and identify which mining activities are most affected by changes in <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> . The first step in mine planning is obviously the orebody and therefore the <b title=\"Active area of shovel/truck loading operations.\">mining face</b> /<b title=\"Individual levels within an open pit.\">bench</b> or the stoping envelopes. The following are therefore deemed the front-line production activities impacting overall <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> :\n\n*   Developing the <b title=\"Remaining extractable elements within the ultimate pit.\">ore reserve</b>s. That is either stripping of <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock ([open pit](https://en.wikipedia.org/wiki/Open-pit_mining)) or the establishment of access mine development (underground) to gain entry or access to the orebody.\n*   The next step is to break the orebody (drilling and blasting)\n*   Following the fragmenting of the rock is the loading of the rock\n*   The final big step (set of activities) is to get the mineralised rock from the <b title=\"Active area of shovel/truck loading operations.\">mining face</b> to the processing plant\n\nThe development of the <b title=\"Remaining extractable elements within the ultimate pit.\">ore reserve</b> also entails these activities and it is essential to also consider what development would be required and the additional development or<b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> stripping required when following a GE mine plan. Finding solutions to these challenges requires the simulation of mining equipment movements and modelling the equipment <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b> impacts associated with the GE mine plan. The front-line mining equipment simulations are:\n\n*   [drill rig](https://en.wikipedia.org/wiki/Drilling_rig) requirements\n*   Loading tool/unit and impacts on the loading unit <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s and non-productive times\n*   [truck](https://en.wikipedia.org/wiki/Haul_truck) fleet and impact on [truck](https://en.wikipedia.org/wiki/Haul_truck)  <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s\n*   Impacts of the GE mine plan on alternate rock movement systems such as IPCC, conveyors or Railveyor and to test these potential impacts.\n\nIn [open pit](https://en.wikipedia.org/wiki/Open-pit_mining) mines the <b title=\"Available equipment at a given operation (e.g. trucks, shovels, water trucks etc…).\">equipment fleet</b>s are generally matched to the ore movement requirements, predicated on the processing plant targets. Once the best or appropriate [shovel](https://en.wikipedia.org/wiki/Power_shovel)s/[excavator](https://en.wikipedia.org/wiki/Excavator)s/[loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)s are selected to meet the total rock loading specifications and rates, the matching [truck](https://en.wikipedia.org/wiki/Haul_truck) or conveyance system is then selected. When developing <b title=\"Grade Engineering\">GE</b> and non-GE mine plans it is generally found that GE mine plans need to schedule more total rock and involve higher productivities or production rates in ore and low-grade <b title=\"Active area of shovel/truck loading operations.\">mining face</b>s. In underground mines <b title=\"Grade Engineering\">GE</b> techniques might impact the actual stoping method which impacts <b title=\"Available equipment at a given operation (e.g. trucks, shovels, water trucks etc…).\">equipment fleet</b> selection and unit sizes.  \n  \nThe challenge is therefore understanding the size of the most appropriate equipment units/models and the number of units, but more importantly scheduling the appropriate productivity parameters for the different equipment units, particularly based on the <b title=\"Grade Engineering\">GE</b> operational activities and rock destinations.  \n  \nWith GE mine planning, fast and reliable data is essential and to achieve the modelled <b title=\"Grade Engineering\">GE</b> benefits it is conceivable that there would be a need for additional technical services activities. One example will be face sampling, additional infill drilling and mapping or grade scanning. Not only do these additional data collection services impact equipment productivities but <b title=\"Grade Engineering\">GE</b> activities might also introduce additional rock destinations which invariably impacts how low grade or even sub-grade rock is now been mined and transported. The GE mine plan therefore not only rejects <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock but <b title=\"Grade Engineering\">GE</b> material might now report to an additional destination and then there is the <b title=\"Material above a specific size (generally used to define material that is retained on a screen deck).\">oversize</b> and <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> or rejected and accepted ore streams as a result of the <b title=\"Grade Engineering\">GE</b> infrastructure requiring handling, hauling and tipping.  \n  \nThe next step of GE mine planning, post <b title=\"Available equipment at a given operation (e.g. trucks, shovels, water trucks etc…).\">equipment fleet</b> simulations (which includes the modelling and understanding of the <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> factors) comes <b title=\"Available equipment at a given operation (e.g. trucks, shovels, water trucks etc…).\">equipment fleet</b> optimisation. This is an important yet underrated planning step, particularly when planning new projects or reasonably new operations which might utilise contractors during the initial production periods. <b title=\"Available equipment at a given operation (e.g. trucks, shovels, water trucks etc…).\">equipment fleet</b> optimisations are often more constrained for existing fully operating mines as the equipment unit sizes might already be selected and delivered to these operations. For these projects or operations, fleet optimisation then looks to optimise the GE mine plans by possibly re-locating the <b title=\"Grade Engineering\">GE</b> pre-processing activities or introducing additional technologies to minimise impacts on equipment <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s. Recent studies have shown that mine production improvements are rarely solved by simply adding more equipment units and mostly focus on the identification of operational [bottlenecks](https://en.wikipedia.org/wiki/Bottleneck_%28production%29) within the production fleets and activities and to eliminate key impacts through smarter planning or better technologies.  \n  \nThe purpose of this paper is to outline which productivity measures are generally impacted by operational <b title=\"Grade Engineering\">GE</b> and to outline the methods to deal with these measured and impacts.\n\nMine Productivity Factors[](#Mine_Productivity_Factors)\n=======================================================\n\nGeneral impacts on Mine Productivity factors[](#General_impacts_on_Mine_Productivity_factors)\n---------------------------------------------------------------------------------------------\n\nThe factors impacting <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> are mostly synonymous for both [open pit](https://en.wikipedia.org/wiki/Open-pit_mining) and underground mining operations and these are:\n\n*   Data turn around and detailed destination [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model)s\n*   Sound and productive mine planning\n*   Processes, procedures and supervision ensuring the operations follow the mine plans always\n*   Safe and productive mining areas and setup (uneven pit floors, poor decline ramp floor conditions, poor “housekeeping” excessive water/mud unsafe <b title=\"Active area of shovel/truck loading operations.\">mining face</b>s and in underground mines, good ventilation)\n*   Optimised loading areas limiting excessive equipment movements and relocation\n*   Drill plan and number of <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b>s per <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b> or rock destination\n*   [drill rig](https://en.wikipedia.org/wiki/Drilling_rig) penetration rates and non-operating times (movement of [drill rig](https://en.wikipedia.org/wiki/Drilling_rig)s)\n*   [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)/shove/[excavator](https://en.wikipedia.org/wiki/Excavator) loading rates achieved\n*   <b title=\"General term for broken rock (e.g. muckpile, crusher product etc..).\">rock fragmentation</b> profiles and rock muck placement\n*   Loading unit setup (optimising loading unit swing angles and interface with [truck](https://en.wikipedia.org/wiki/Haul_truck)s or conveyance systems\n*   Sound equipment maintenance planning and ensuring the equipment mechanical availability is maximised\n*   Optimised [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)/[truck](https://en.wikipedia.org/wiki/Haul_truck) interface\n*   Minimising equipment sighting and positioning times\n*   Limiting equipment passing and queuing to improve the equipment <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s (wide roads, enough passing bays underground etc.)\n*   Optimised haul routes\n*   Limiting or eliminating [truck](https://en.wikipedia.org/wiki/Haul_truck) speed impacts/nodes within the haul route which slows down the [truck](https://en.wikipedia.org/wiki/Haul_truck) and requires the [truck](https://en.wikipedia.org/wiki/Haul_truck) to accelerate with a full load again whilst on an inclined ramp/road\n*   Weather conditions and the mine plan/design layout enabling the best or optimal management of weather impacts\n\nEquipment Selection impacts[](#Equipment_Selection_impacts)\n-----------------------------------------------------------\n\nThe following points summarise the impacts productivity factors and activities may have on equipment and therefore equipment selection:\n\n*   Modelling and analysing more data and developing <b title=\"Stage at which final boundaries between ore and waste are calculated.\">grade control</b> and [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) operational [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model)s. These models require a significant amount of data frequently updated and getting these updated models ready for improved geological-and mine planning targets often negatively impact decisions and then operations. Depending on the Technical services, especially ore control processes the protocols and Quality Assurance procedures may inhibit the flexibility of operational plans which ultimately impact activity sequences and then equipment utilisation (productivity).\n*   Drill and blasting planning and blasted stocks (ensuring sufficient blasted faces are available enabling sufficient direct ore <b title=\"Material entering a predetermined system.\">feed</b> , <b title=\"Grade Engineering\">GE</b> destination <b title=\"Material entering a predetermined system.\">feed</b> and <b title=\"Material determined to be below a predetermined grade or economic threshold.\">waste</b> rock) in a complicated mine planning environment could have impacts on drill and blast patterns, the number of <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b>s and location where drills need to work and therefore [drill rig](https://en.wikipedia.org/wiki/Drilling_rig) movements. The more equipment (particularly [drill rig](https://en.wikipedia.org/wiki/Drilling_rig)s) need to move/relocate it increases the equipment’s non-productive time and diminishes equipment productivity. Drill-and blasted stock should (insofar possible) not create the operational [bottlenecks](https://en.wikipedia.org/wiki/Bottleneck_%28production%29) which is the key reason for contingency drilling capacity, this could mean that some [drill rig](https://en.wikipedia.org/wiki/Drilling_rig)s might be operating at lower productivities (excess [drill rig](https://en.wikipedia.org/wiki/Drilling_rig)s available) and these impacts need to be simulated and accounted for during GE mine planning.\n*   With <b title=\"Sites which have implemented Grade Engineering strategies.\">GE operations</b> there will likely be direct ore <b title=\"Material entering a predetermined system.\">feed</b> (higher grade <b title=\"Blocks exceeding economic or grade thresholds.\">ore blocks</b> where <b title=\"Grade Engineering\">GE</b> activities might not prove beneficial) and these blocks of ore will be directly loaded and transported to the [primary crusher](https://en.wikipedia.org/wiki/Crusher), but then there will be likely be low and medium grade <b title=\"Blocks exceeding economic or grade thresholds.\">ore blocks</b> and in many cases sub-grade blocks (ore just below marginal economic and Cut-Off which require unique drilling and <b title=\"Different blast configurations used within different domains.\">blasting patterns</b> and certainly require specific <b title=\"Grade Engineering\">GE</b> rock destinations, whether it is to a crusher and screening facility or a combination of crushers, screens and ore sorting units. These additional rock destinations generally impact the number of <b title=\"Active area of shovel/truck loading operations.\">mining face</b>s i.e. mining [stope](https://en.wikipedia.org/wiki/Stoping)s (underground) or mining <b title=\"Individual levels within an open pit.\">bench</b>es ([open pit](https://en.wikipedia.org/wiki/Open-pit_mining)) that needs to be ready, developed, prepared, drilled and blasted and available for loading. If there is significant [grade variability](/pages/wikiore-heterogeneity) within the mining areas, the movement or interim relocation of the loading units could potentially increase (distances travelled or moved without loading or frequency of movement/relocation) when compared to a conventional grade-driven mining operation. These additional non-productive hours are what impacts <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> with a GE mine plan. These directly impact the [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29) productivities and could either justify additional [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)s or might justify a slightly larger loading unit. Some mining operations which may now require one more loading unit could possibly justify going to smaller sized loading fleet and adding one smaller [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29) (as opposed to simply adding another larger [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29) and this [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29) being underutilised). Smaller loading units better utilised might be more cost-effective compared to larger [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)s underutilised challenging popular believes that the bigger the equipment the more cost-effective the mining operations. It is therefore obvious how important fleet planning and equipment simulations are as part of GE mine planning.\n*   Once the loading unit sizes and number of loading units have been modelled and identified and the location of these loading units scheduled on a month and even weekly basis, the appropriate or optimal [truck](https://en.wikipedia.org/wiki/Haul_truck) size matched to the loading units follow. It is conceivable that a mining operation might have mixed <b title=\"Available equipment at a given operation (e.g. trucks, shovels, water trucks etc…).\">equipment fleet</b> sizes (different size loading units with their matching [truck](https://en.wikipedia.org/wiki/Haul_truck) fleets operating in different areas of the mine or performing different mining tasks). The matching of [truck](https://en.wikipedia.org/wiki/Haul_truck)s to the loading units are vital and generally looks for a 4-to 6 bucket pass [truck](https://en.wikipedia.org/wiki/Haul_truck) fill factor and not half buckets (if it can be helped). Large [shovel](https://en.wikipedia.org/wiki/Power_shovel)s generally look to have a full 3-pass loading to fill a [truck](https://en.wikipedia.org/wiki/Haul_truck) as partial bucket loading is a definite no in [truck](https://en.wikipedia.org/wiki/Haul_truck)/[shovel](https://en.wikipedia.org/wiki/Power_shovel) matching. The loading cycles impacts the time the [truck](https://en.wikipedia.org/wiki/Haul_truck) spends waiting to be filled and even impact subsequent [truck](https://en.wikipedia.org/wiki/Haul_truck) queuing. The most commons [truck](https://en.wikipedia.org/wiki/Haul_truck)  <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b> impacts are with [truck](https://en.wikipedia.org/wiki/Haul_truck) queuing, sighting and positioning near the loading unit and then the loading time until the [truck](https://en.wikipedia.org/wiki/Haul_truck) pulls away on its journey to the rock destinations. The same goes for LHD units loading [truck](https://en.wikipedia.org/wiki/Haul_truck)s underground, but LHD’s usually increase their loading performances by making use of underground rock [stockpiles](https://en.wikipedia.org/wiki/Stockpile) and to limit the one-way distance the LHD unit must transport rock. Optimising haul routes and simulating the specific nodes within the haul routes and planning/scheduling the [truck](https://en.wikipedia.org/wiki/Haul_truck)s with realistic <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s are key to planning <b title=\"Sites which have implemented Grade Engineering strategies.\">GE operations</b> .\n*   When alternate technologies are considered, particularly with rock tramming/hauling and where minor improvements on [truck](https://en.wikipedia.org/wiki/Haul_truck)  <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s could lead to reasonable reductions in [truck](https://en.wikipedia.org/wiki/Haul_truck) fleet numbers, it is prudent to consider these technologies during mine planning. Technologies which are proven to optimise equipment movements and cycles and therefore equipment productivities include:\n    *   Equipment tracking and <b title=\"Systems for allocation of equipment plans (eg. Trucks, shovels etc…).\">dispatch</b> systems\n    *   Trolley Assist lines for larger [open pit](https://en.wikipedia.org/wiki/Open-pit_mining) [truck](https://en.wikipedia.org/wiki/Haul_truck)s (improving fully loaded uphill speeds of [truck](https://en.wikipedia.org/wiki/Haul_truck)s)\n    *   Auto collision devices on [truck](https://en.wikipedia.org/wiki/Haul_truck)s improving sighting, spotting and [truck](https://en.wikipedia.org/wiki/Haul_truck) positioning at the [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)s\n    *   Autonomous systems (still new) seems to improve drilling <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s and [truck](https://en.wikipedia.org/wiki/Haul_truck)  <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s. The added benefit with autonomous systems is that fully autonomous mines could reduce labour and operators significantly and these autonomous systems always enable the optimal performance of the equipment (maximising acceleration, gear shifting, breaking and positioning activities)\n\nGE Infrastructure impacts on Mine Productivity[](#GE_Infrastructure_impacts_on_Mine_Productivity)\n-------------------------------------------------------------------------------------------------\n\nThe other key aspect impacting equipment and therefore <b title=\"Metrics representing overall perfomance of an operation.\">mine productivity</b> is the rock destinations but more so the layout, position and interface of the <b title=\"Grade Engineering\">GE</b> infrastructure with the mining equipment, and largely either the loading units (if positioned in the pit, near the <b title=\"Active area of shovel/truck loading operations.\">mining face</b>s) or the [truck](https://en.wikipedia.org/wiki/Haul_truck)s if located on surface outside of the mine.  \n  \nThe following figures depict the typical <b title=\"Grade Engineering\">GE</b> infrastructure and potential impacts on the mining equipment <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s and therefore mining equipment productivity:\n\n[![Figure 4-1: Standard Mining Operation (no GE)](https://res.cloudinary.com/shapeable/image/upload/v1687316310/wikiore/262.png \"Figure 4-1: Standard Mining Operation (no GE)\")](https://res.cloudinary.com/shapeable/image/upload/v1687316310/wikiore/262.png \"Figure 4-1: Standard Mining Operation (no GE)\")\n\nFigure 4-1: Standard Mining Operation (no GE)\n\n[![Figure 4-3: GE infrastructure on the mining face](https://res.cloudinary.com/shapeable/image/upload/v1687316313/wikiore/263.png \"Figure 4-3: GE infrastructure on the mining face\")](https://res.cloudinary.com/shapeable/image/upload/v1687316313/wikiore/263.png \"Figure 4-3: GE infrastructure on the mining face\")\n\nFigure 4-3: GE infrastructure on the mining face\n\n![Chapter12 2 Figure3](https://res.cloudinary.com/shapeable/image/upload/v1687316315/wikiore/264.png)\n\nSeveral GE mine planning studies concluded that the average <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b> of equipment are impacted negatively, and these potential impacts are largely attributed to specific <b title=\"Grade Engineering\">GE</b> infrastructure and equipment interfaces. There are studies which concluded that <b title=\"Grade Engineering\">GE</b> infrastructure, when appropriately positioned or located, could improve equipment <b title=\"Time taken for a single truck to go from shovel/dig face to destination.\">cycle time</b>s. This observation or finding seemed to be significant where large [shovel](https://en.wikipedia.org/wiki/Power_shovel)s interface with a crusher/conveyance unit ultimately <b title=\"Material entering a predetermined system.\">feed</b>ing the [truck](https://en.wikipedia.org/wiki/Haul_truck)s. The [shovel](https://en.wikipedia.org/wiki/Power_shovel) productivities can be optimised, and the [truck](https://en.wikipedia.org/wiki/Haul_truck)s could reduce their spotting times significantly with a “drive-through” layout where the [truck](https://en.wikipedia.org/wiki/Haul_truck) is filled by some <b title=\"Material entering a predetermined system.\">feed</b>er unit. The simulations for these types of solutions indicated that some rock surge capacity is required ultimately enabling the [shovel](https://en.wikipedia.org/wiki/Power_shovel) to keep loading even in the event of a [truck](https://en.wikipedia.org/wiki/Haul_truck) shortage. These types of loading/[crushing](https://en.wikipedia.org/wiki/Crusher) and conveying systems furthermore enable the implementation of scanning and sorting technologies to be considered which allows direct <b title=\"Material entering a predetermined system.\">feed</b> and <b title=\"Grade Engineering\">GE</b> ore to be diverted to specific locations or [truck](https://en.wikipedia.org/wiki/Haul_truck) loading positions."},"organisations":[],"embeds":{"citations":[],"imageAssets":[]},"video":null,"banner":null,"fileAssets":[],"citations":[],"feedEntries":[],"posts":[],"moderators":[]}}},"pageContext":{"lang":{"id":"en","path":"","iso":"en","name":"English","label":"English"},"availableEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend","OrganisationType","HorizonType","Economy","FeedEntry","Video","Citation","Objective","ProfileType","ExpertiseLevel"],"detailEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend"],"site":{"id":"65d2edd1ebf7bb9388ffb0df","slug":"connect-ore","name":"ConnectOre","url":"https://connectore.org","title":"ConnectOre","twitter":null,"threads":null,"facebook":null,"linkedin":null,"instagram":null,"flickr":null,"tiktok":null,"youtube":null,"ownerName":"ICAA","recaptchaKey":"6LfG2J0qAAAAAHDCFfJnrWOj6DiWJGik5BAa_7p8","googleSiteVerification":null,"platformName":"ConnectOre","platformUrl":"https://platform.connectore.org","supportEmail":null,"contactEmail":null,"mainMenu":{"id":"65d2edaaebf7bb9388ffaf79","slug":"website-navigation"},"linearMenu":null,"entityViews":[{"id":"67528c24c135ebcfc668f1ba_65d2edd1ebf7bb9388ffb0df","name":"Value Chain","hash":"value-chain","label":null,"slug":"value-chain","count":0,"showCount":null,"disabled":null,"icon":{"id":"6752a61b8b51dfa7b77b1e37","name":"Connections Navigator Icon Glyph","slug":"connections-navigator-icon-glyph","component":"ConnectionsNavigatorIconGlyph"},"childEntityTypes":[{"id":"6667fa4ff794dd6e045135c1","name":"Value Chain Theme","internalName":"Trend"},{"id":"6667fa58f794dd6e045135c6","name":"Topic","internalName":"Topic"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"6757ef1ede8adbd45cf19474_65d2edd1ebf7bb9388ffb0df","name":"Bulletin Board","hash":"bulletin-board","label":null,"slug":"bulletin-board","count":0,"showCount":null,"disabled":null,"icon":{"id":"681c2cebbccc5a72d8382f31","name":"Tag Icon","slug":"tag-icon","component":"TagDotIconGlyph"},"childEntityTypes":[],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528d88c135ebcfc668f31b_65d2edd1ebf7bb9388ffb0df","name":"Innovations","hash":"innovations","label":null,"slug":"innovations","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528d74c135ebcfc668f315","name":"Innovation","internalName":"innovation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67625640fbc7c50d8644c592_65d2edd1ebf7bb9388ffb0df","name":"Community","hash":"community","label":null,"slug":"community","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528404c135ebcfc668ee1c","name":"Person","internalName":"Person"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528e1bc135ebcfc668f33a_65d2edd1ebf7bb9388ffb0df","name":"Stakeholder Map","hash":"stakeholder-map","label":null,"slug":"stakeholder-map","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"66680141f794dd6e0451367a","name":"Organisation","internalName":"Organisation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67529040c135ebcfc668f4ae_65d2edd1ebf7bb9388ffb0df","name":"References","hash":"references","label":null,"slug":"references","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"6752902fc135ebcfc668f4a4","name":"Article","internalName":"FeedEntry"},{"id":"67529039c135ebcfc668f4aa","name":"Citation","internalName":"Citation"},{"id":"67528de9c135ebcfc668f328","name":"Catalyst","internalName":"catalyst"},{"id":"67528df9c135ebcfc668f32d","name":"Page","internalName":"page"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]}],"entityAppViews":[],"entityOnboardingViews":[{"id":"680c3a4ebc80e4d0f3cfa2ef_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Step","hash":"trend-expertise-step","label":null,"slug":"trend-expertise-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Onboarding Grid","slug":"trend-expertise-onboarding-grid","label":null,"updated":"2025-04-26T01:42:10.20","layout":{"id":"680c3993bc80e4d0f3cfa2dd","name":"Slice Onboarding Trend Expertise Grid","slug":"slice-onboarding-trend-expertise-grid","component":"SliceLayoutOnboardingTrendExpertiseGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":null,"titleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_titleRich","text":"Are you **an industry expert** in any of these Value Chain Themes?"}}]},{"id":"680c3a85bc80e4d0f3cfa2fa_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Step","hash":"profile-types-step","label":null,"slug":"profile-types-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Onboarding Grid","slug":"profile-types-onboarding-grid","label":null,"updated":"2025-04-26T01:44:34.63","layout":{"id":"680c3a13bc80e4d0f3cfa2e4","name":"Slice Onboarding Profile Types Grid","slug":"slice-onboarding-profile-types-grid","component":"SliceLayoutOnboardingProfileTypesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"Which best describes you?","titleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]},{"id":"680c3aaabc80e4d0f3cfa2ff_65d2edd1ebf7bb9388ffb0df","name":"Objectives Step","hash":"objectives-step","label":null,"slug":"objectives-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df","name":"Objectives Onboarding Grid","slug":"objectives-onboarding-grid","label":null,"updated":"2025-04-26T01:45:12.76","layout":{"id":"680c3a3fbc80e4d0f3cfa2ea","name":"Slice Onboarding Objectives Grid","slug":"slice-onboarding-objectives-grid","component":"SliceLayoutOnboardingObjectivesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"What are your priority objectives?","titleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]}],"gptLanguages":[{"id":"65d2eda5ebf7bb9388ffaf1f","name":"English","slug":"english","iso":"en","locale":"en_US","path":"/en","label":"English","menuLabel":null},{"id":"666f70b6e051ad9ef086d1be","name":"Arabic","slug":"arabic","iso":"ar","locale":"ar_AE","path":"/ar","label":"عربي","menuLabel":null},{"id":"666f7161e051ad9ef086d1c4","name":"Spanish","slug":"spanish","iso":"es","locale":"es_ES","path":"/es","label":"español","menuLabel":null},{"id":"666f71c9e051ad9ef086d1c8","name":"German","slug":"german","iso":"de","locale":"de_DE","path":"/de","label":"Deutsch","menuLabel":null},{"id":"65d2eda5ebf7bb9388ffaf20","name":"French","slug":"french","iso":"fr","locale":"fr_FR","path":"/fr","label":"Français","menuLabel":null}],"gptQuestionTemplate":{"id":"662c7f6e81ef1920e3638518","name":"Standard Open Question","slug":"standard-open-question","path":"/prompt-templates/standard-open-question","__typename":"PromptTemplate","_entityTypeName":null,"label":"CopperAI","type":{"id":"662c7f1981ef1920e363850f","name":"Ask","slug":"ask"},"description":{"text":"This template is tailored for providing accurate responses based on specific context. It integrates contextual details from \"contextual information\" and addresses the \"target question\". The response is always in English, prioritizing clarity. If the answer is unknown, the template openly acknowledges this, ensuring honesty and avoiding speculation. This format is ideal for precise, context-sensitive, and truthful answering."},"summary":{"text":"Ask a general question about Website content"},"gptModel":{"id":"67564c4f2f6749787d0e03dc","name":"OpenAI GPT 4o","slug":"open-ai-gpt-4-o","dataSetId":"openai:gpt-4o"},"variablesPrompt":{"text":""},"submitLabel":"Ask","languages":[],"icon":{"id":"67528b9cc135ebcfc668f1a3","name":"AI Lower Case Icon Glyph","slug":"ai-lower-case-icon-glyph","component":"AiLowerCaseIconGlyph"},"variables":[{"id":"6668076bf794dd6e045138d9","name":"question","slug":"question","useVectorStore":true,"label":"What would you like to know?","labelAnother":null,"help":{"text":""},"options":{"text":""},"defaultValue":null,"entityTypes":[],"controlType":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"},"labelContextual":null,"labelAnotherContextual":null,"helpContextual":{"text":""},"optionsContextual":{"text":""},"defaultValueContextual":null,"entityTypesContextual":[],"controlTypeContextual":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"}}]},"advertisements":[],"logoVerticalOffset":null,"logoHorizontalOffset":null,"logoVerticalOffsetMobile":null,"logoHorizontalOffsetMobile":null,"logoVerticalOffsetTablet":null,"logoHorizontalOffsetTablet":null,"logoVerticalOffsetDesktop":null,"logoHorizontalOffsetDesktop":null,"logoHeightMobile":44,"logoHeightTablet":null,"logoHeightDesktop":null,"headerHeightMobile":null,"headerHeightTablet":null,"headerHeightDesktop":null,"logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807465/copper-connect/site/copper-connect_logo__CopperOre_Master_Brand_Identity-colour_cd4vgg.webp","type":"image/webp","width":945,"height":266},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807452/copper-connect/site/copper-connect_logoInverted__CopperOre_Master_Brand_Identity-white_chnucx.webp","type":"image/webp","width":945,"height":266},"footerMenu":null,"footerSecondaryMenu":null,"footerContent":{"text":"© {year} ConnectOre. All Rights Reserved\n"},"creator":null,"poweredBy":{"id":"65d2edadebf7bb9388ffafc8","name":"Shapeable","slug":"shapeable","url":"https://shapeable.ai","logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1674010034/platform/organisation/shapeable_logo__shapeable.png","type":"image/png","width":1174,"height":368},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1729474494/copper-connect/organisation/shapeable_logoInverted__shapeable-logo-inverted_sdcfpk.png","type":"image/png","width":392,"height":118},"logoSubtle":null},"poweredByLabel":null,"poweredByContent":{"text":""},"explorerPage":{"name":"Explorer","title":null,"slug":"explorer","path":"/explorer"},"termsPage":{"name":"Terms of Use","title":null,"slug":"terms-of-use","path":"/terms-of-use"},"homePage":null,"knowledgeHubPage":{"name":"News","title":null,"slug":"news","path":"/news"},"privacyPolicyPage":{"name":"Privacy Policy","title":null,"slug":"privacy-policy","path":"/privacy-policy"},"summary":{"text":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action"},"thumbnail":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"},"openGraph":{"title":"ConnectOre","date":"2026-07-31T04:44:47.80","description":{"plain":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action\n"},"image":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png","type":"image/png","thumbnails":{"full":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"}}}},"termsAndConditions":{"text":""},"privacyPolicy":{"text":"At ConnectOre we respect your privacy. We want to ensure that you get the information, content, and experiences that matter most to you. ConnectOre is committed to protecting the privacy of its stakeholders, communities, and other contacts.\n\n## Scope\n\nThis privacy policy applies to all personal data processed by full-time and part-time employees, volunteers when acting on behalf of ConnectOre contractors and partners doing business on behalf of ConnectOre, as well as all legal entities, all operating locations in all countries, and all business processes conducted by ConnectOre.\n\n## Information Collected\n\n#### What information do we collect?\n\nConnectOre collects the following personal data in line with the use purposes explained in a subsequent section:\n\n  * Your name and contact details\n  * Online profile data/usage\n  * Contact information\n  * Social media profile information\n  * Education and professional information\n  * Registration and participation in ConnectOre events and activities \n  * Information about service usage\n  * Cookies\n  * Authentication data\n  * Location information\n  * Author and peer review information\n  * Other information you upload or provide to us\n\n#### How do we use your information?\n\nConnectOre uses (and, where specified, shares) your personal information for the following purposes:\n\n  * To provide support or other services. ConnectOre may use your personal information to provide you with support or other services that you have ordered or requested. ConnectOre may also use your personal information to respond directly to your requests for information, including registrations for webinars, or other specific requests, or pass your contact information to the appropriate ConnectOre supplier or reseller for further follow-up related to your interests.\n  * To provide information based on your needs and respond to your requests. ConnectOre may use your personal information to provide you with notices of new product releases and service developments.\n  * To administer products. ConnectOre may contact you if you make use of (digital) products we offer, to confirm certain information (for example, that you did not experience problems in a download process). We may also use this information to confirm compliance with licensing and other terms of use and may share it with your company/institution.\n  * To assist in your participation in ConnectOre activities. ConnectOre will communicate with you, if you are participating in certain ConnectOre activities such as ConnectOre Summit, authoring or reviewing a ConnectOre article, or ConnectOre humanitarian activities. ConnectOre may send you information such as update messages related to those activities (such as but not limited to the event's content, and event logistics)\n  * To update you on relevant ConnectOre events and opportunities. ConnectOre may communicate with you regarding relevant ConnectOre events and opportunities.\n  * To protect ConnectOre content and services. We may use your information to prevent potentially illegal activities and to enforce our terms and conditions.\n  * To get feedback or input from you. In order to deliver products and services of most interest to our stakeholders, from time to time, we may ask you to provide us input and feedback (for example through surveys).\n\n#### How can you control your information?\n\nYou can control the information we have about you and how we use as follows:\n\n  * If you are a registered guest for ConnectOre Annual Summit 2021, any request for review, revise or correction of your personal data can be sent to john.fennell@copper.com.au specifying your request.\n\n#### Personal data about minors and children\n\nConnectOre does not knowingly collect data from or about children under 16 without the permission of parent(s)/guardian(s). If we learn that we have collected personal information from a child under 16, we will delete that information as quickly as possible. If you believe that we might have any information from or about a child under age 16, please contact us.\n\n#### How will you know if the Privacy Policy is changed?\n\nConnectOre may update its Privacy Policy from time to time. If we make any material changes you will be notified by means of a notice on our website prior on the date the change becomes effective. We encourage you to periodically review this page for the latest information on our privacy practices.\n\n## Technical And Regulatory Information\n\n#### Logging practices\n\nConnectOre automatically records the Internet Protocol (IP) addresses of visitors. The IP address is a unique number assigned to every computer on the internet. Generally, an IP address changes each time you connect to the internet (it is a \"dynamic\" address). Note, however, that if you have a broadband connection, depending on your individual circumstance, the IP address that we collect may contain information that could be deemed identifiable. This is because, with some broadband connections, your IP address doesn't change (it is \"static\") and could be associated with your personal computer.\n\nAs well as recording the IP addresses of users, ConnectOre may also keep track of sites that users visited immediately prior to visiting ConnectOre's website and the search terms they used to find it. We keep track of the pages visited on ConnectOre's website, the amount of time spent on those pages and the types of searches done on them. Your searches remain confidential and anonymous. ConnectOre uses this information only for statistical purposes to find out which pages users find most useful and to improve the website.\nConnectOre also captures and stores information that you transmit. This may include:\n\n  * Browser/Device type/version\n  * Operating system used\n  * Media Access Control (MAC) address\n  * Date and time of the server request\n  * Volume of data transferred\n\n#### External links behaviour\n\nSome of the links on ConnectOre's websites link to other sites created and maintained by other public- and/or private-sector organizations. ConnectOre provides these links solely for your information and convenience. When you transfer to an outside website, you are leaving ConnectOre domain, and ConnectOre's information management policies no longer apply. ConnectOre encourages you to read the privacy statement of each external website that you visit before you provide any personal data.\n\n#### Cookies and web beacons\n\nCookies and web beacons are electronic placeholders that are placed on your device by websites to track your individual movements on that website over time. ConnectOre uses both session-based cookies (which last only for the duration of the user's session) and persistent cookies (which remain on your device and provide information about the session you are in and waits for the next time you use that site again).\n\nThese cookies and web beacons provide useful information to ConnectOre, enabling us to recognize repeat users, facilitate the user's access to and use of our sites, allows us to track usage behavior, and to balance the usage of our websites on all ConnectOre web servers.\nTracking cookies, third-party cookies, and other technologies such as web beacons may be used to process additional information, enable non-core functionalities on ConnectOre website and enable third-party functions (such as a social media \"share\" link). We may also include web beacons and other similar technology in promotional email messages to determine whether the messages have been opened.\n\n#### Do Not Track (DNT)\n\nThe online advertising industry has self-regulatory initiatives designed to provide consumers a choice in the types of ads they may see online and to conveniently opt-out from online behavioral ads served by some or all of the companies participating in these programs. Our websites do not respond to DNT consumer browser settings.\n\n#### Responses to legal requests\n\nConnectOre reserves the right to share your information to respond to duly authorized information requests of governmental authorities or where required by law.\n\n#### Your data rights\n\nConnectOre complies with all applicable data privacy laws and regulations including, but not limited to, the General Data Protection Regulation (GDPR) and the California Consumer Privacy Act (CCPA). Under these laws and regulations, you may have certain rights to your data. Should you wish to exercise any of these rights, please send an email request to john.fennell@copper.com.au with \"Data Privacy Request'' in the subject line and in the email please identify the specific privacy right you request assistance with. Please note additional information may be requested prior to fulfilling a request and that ConnectOre reserves the right to charge a fee, where permitted, to cover the cost of certain requests.\n\n#### How do I contact you if there is an issue?\nIf you have any questions or concerns about this Privacy Policy or about the use of your personal information, please feel free to contact us by email at john.fennell@copper.com.au"},"welcomeUrl":"https://connectore.org/app/welcome","welcomeTitle":"Welcome to ConnectOre and thanks for joining us! ","invitationAction":"join the ConnectOre community","setupCompletionMessage":null,"languages":[],"brandColors":[],"showLogin":true,"showShareMenu":null,"showFollowMenu":true,"showPlatformLogin":null,"showContactUs":null,"loginLabel":"Explorer Login","platformLoginLabel":"Community Platform","headerButtons":[]},"includeProfile":true,"disableProfileEditing":false,"dynamicEntityTypeNames":["Person","Organisation"],"profilePath":"/app/profile","welcomePath":"/app/welcome","id":"65d2edd7ebf7bb9388ffb186","slug":"short-term-planning-impact","entityPath":"/sub-topics/short-term-planning-impact","openGraph":{},"entityTypeName":"SubTopic","name":"Short Term Planning Impact","updated":"2024-12-18T23:14:44.01","__type":"SubTopic"}},
    "staticQueryHashes": ["1044227382","1158597448","1242646999","1427075558","1452322194","1520036161","1545705019","1586309863","1606754935","1816168740","1864381666","1903214493","1945056504","1989845544","2034981229","2181044613","2409034939","2463401854","2526615987","2642656775","2862279633","2867243664","2910164142","2912920178","296816903","3073584486","3150399266","3172506128","3320076387","3447680494","3453148481","3624873332","364221563","3692255024","3778988535","3782604890","4091857177","4216505212","591477963","701411134","758936535","80004486","857137463","881103158"]}