{
    "componentChunkName": "component---src-gatsby-entities-sub-topic-tsx",
    "path": "/sub-topics/ge-in-ies-case-study",
    "result": {"data":{"platform":{"subTopic":{"__typename":"Platform_SubTopic","_schema":{"label":"Sub Topic","pluralLabel":"Sub Topics"},"openGraph":{"title":"GE in IES Case Study","description":{"text":"Introduction[](#Introduction)\n=============================\n\nAnglo American’s [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) mine, located in the Andean Mountains at an altitude of 3,500m above sea level, extracts the..."},"image":null},"id":"676356b0cc7194b0ec39485b","slug":"ge-in-ies-case-study","name":"GE in IES Case Study","path":"/sub-topics/ge-in-ies-case-study","outlineNumber":"2.4.3","color":{"__typename":"Platform_Color","id":"65d2ed7febf7bb9388ffab3a","slug":"core-12","name":"Core 12","value":"#3b6673","darkValue":"#2b4b56","veryDarkValue":"#1c3239"},"intro":{"id":"676356b0cc7194b0ec39485b_intro","text":"Introduction[](#Introduction)\n=============================\n\nAnglo American’s [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) mine, located in the Andean Mountains at an altitude of 3,500m above sea level, extracts the Porphyry cluster adjacent to Andina operations of Codelco. "},"description":{"id":"676356b0cc7194b0ec39485b_description","text":"The ore body comprises primary [sulphides](https://en.wikipedia.org/wiki/Sulfide_mineral) such as Chalcopyrite and bornite with a thick overlaying blanket of chalcocite. The [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) ore is open at deep as well as lateral extensions. [open pit](https://en.wikipedia.org/wiki/Open-pit_mining) mining is carried out at [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) through drilling and blasting. The ore is extracted with the use of [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29)s and wheel dozers.\n\nThe low grade ore undergoes the process of [leach](https://en.wikipedia.org/wiki/Leaching_%28metallurgy%29)ing, solvent extraction (SX) and electrowinning (EW) for the production of cathodes. Higher grade ore is sent to the crushers near the mine where the ore is reduced to 1.5 inch pieces. The crushed ore is sent by the 4.4km conveyer to the [grinding](https://en.wikipedia.org/wiki/Mill_%28grinding%29) plant, which houses one 40ft [SAG mill](https://en.wikipedia.org/wiki/Mill_%28grinding%29#SAG_mill) and two 26ft [ball mill](https://en.wikipedia.org/wiki/Ball_mill)s. The ore [slurry](https://en.wikipedia.org/wiki/Slurry) prepared from the milled ore is sent to the Las Tórtolas [flotation](https://en.wikipedia.org/wiki/Froth_flotation) plant through a 52km pipeline.\n\nThe [slurry](https://en.wikipedia.org/wiki/Slurry) undergoes froth [flotation](https://en.wikipedia.org/wiki/Froth_flotation) for separating the copper and molybdenum <b title=\"Product generally produced by metal ore mines.\">concentrate</b>s. The <b title=\"Product generally produced by metal ore mines.\">concentrate</b> s are either directly sold in the market or transported to the Charges smelter to produce copper anodes.\n\n[Grade Engineering](/pages/wikiore-introduction-to-grade-engineering)[](#Grade_Engineering)\n-------------------------------------------------------------------------------------------\n\nIn the current [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) <b title=\"Life of Mine\">LOM</b> plan, there is a long-term grade depletion and metal production trend in combination with increased <b title=\"Parameters that define resistance to different comminution types.\">ore hardness</b> . These two factors influence the profitability of [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine). To address this, the application of [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) has the potential to:\n\n*   Limit the magnitude of grade depletion to the <b title=\"A plant where ore is separated into concentrates and tails.\">concentrator</b> by increasing the overall head grade through the removal of low grade ore fed to the <b title=\"A plant where ore is separated into concentrates and tails.\">concentrator</b> .\n*   Bring forward metal production and increase <b title=\"Measure of efficiency defined by metal content in product.\">unit metal productivity</b>\n*   Through the removal of <b title=\"Subjective term for the larger sized component of feed\">coarse</b> <b title=\"Material above a specific size (generally used to define material that is retained on a screen deck).\">oversize</b> component, the proportion of <b title=\"Subjective term for the smaller sized component of feed\">fines</b> in the overall SAG <b title=\"Material entering a predetermined system.\">feed</b> increases providing a <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> improvement that assists in offsetting increasing <b title=\"Parameters that define resistance to different comminution types.\">ore hardness</b> characteristics.\n*   Opportunity for several implementation strategies incorporating:\n    *   Full [opex](https://en.wikipedia.org/wiki/Operating_expense) implementation\n    *   Rent buy\n    *   Fast Track implementation\n    *   Ramp up strategies\n    *   Full <b title=\"Trials run at or near the size required for an operation.\">production scale</b> fixed capacity [screening plant](https://en.wikipedia.org/wiki/Mechanical_screening)\n*   Increased operational flexibility to enable [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) to adapt to changing operating modes (e.g. Mill constrained, Water constraints, Commodity price adjustments) through the <b title=\"Expected longevity of mining operations under a given scenario or plan.\">mine life</b> .\n*   Synergise with other technology initiatives (e.g. Mine to mill, <b title=\"Subjective term for the larger sized component of feed\">coarse</b> particle [flotation](https://en.wikipedia.org/wiki/Froth_flotation), value based <b title=\"Stage at which final boundaries between ore and waste are calculated.\">grade control</b> ) to unlock additional value. implementation\n\n  \nThe application of [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) at [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) has the impact of increasing resource utilisation through the reduction in [cut-off](/sub-topics/scheduling-and-cut-off-optimisation) grade of material sent to the <b title=\"A plant where ore is separated into concentrates and tails.\">concentrator</b> . The implication of this is:\n\n*   Increased tonnage and metal processed through the LOM\n*   Extension of the mine-life beyond the current LOM\n*   Reduction in [dump leach](https://en.wikipedia.org/wiki/Heap_leaching) capacity\n*   Addition of a process destination (i.e. direct <b title=\"Material entering a predetermined system.\">feed</b> [screening plant](https://en.wikipedia.org/wiki/Mechanical_screening)) requiring modification to the material movement plan\n\nUpgrading ore through screening is not routinely done in base metal operations. As a result, traditionally there is no information available quantifying upgrading <b title=\"Materials response to a given preconcentration technology.\">amenability</b> . For site to quantify the potential of the resource to upgrading, several tests were required. These included evaluations of the natural [metal deportment](/pages/wikiore-natural-deportment) response and if the ore is amenable, then quantify the optimum [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution range to maximize benefit.\n\nTests Developed[](#Tests_Developed)\n-----------------------------------\n\nTo characterize the magnitude of the [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) opportunity for both Preferential [grade by size](/pages/wikiore-natural-deportment) Deportment and [differential blasting](/pages/wikiore-induced-deportment) several tests and simulation were conducted:\n\n*   [natural deportment](/pages/wikiore-natural-deportment):\n    *   Laboratory testing of [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical variability samples measuring magnitude of [metal deportment](/pages/wikiore-natural-deportment) response\n    *   Laboratory testing of <b title=\"Run of mine\">ROM</b> bulk samples for measuring magnitude of [metal deportment](/pages/wikiore-natural-deportment) on <b title=\"Trials run at or near the size required for an operation.\">production scale</b> ore and to define production [scale up](/sub-topics/natural-deportment-characterisation) factor between [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical [variability testing](/sub-topics/natural-deportment-characterisation) and <b title=\"Trials run at or near the size required for an operation.\">production scale</b> .\n    *   Progressive Crush testwork on <b title=\"Run of mine\">ROM</b> bulk samples to evaluate optimal [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution required to maximize [metal deportment](/pages/wikiore-natural-deportment).\n    *   Pilot testing to quantify <b title=\"Output of accept stream grade over feed grade.\">upgrade response</b> at pilot scale.\n*   [differential blasting](/pages/wikiore-induced-deportment):\n    *   Simulation analysis based on historical <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> database utilising current site blast input parameters\n    *   [heterogeneity](/pages/wikiore-heterogeneity) study investigating potential zones of <b title=\"Materials response to a given preconcentration technology.\">amenability</b> for potential future ores\n    *   Pilot testing to quantify <b title=\"Output of accept stream grade over feed grade.\">upgrade response</b> at pilot scale.\n\nCharacterisation for [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) parameters is not routinely conducted in projects and operations. Due to the absence of relevant information, a detailed test work and characterization program was conducted to quantify the <b title=\"Materials response to a given preconcentration technology.\">amenability</b> of [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) ores to upgrading via a screening process. The characterization of natural [grade by size](/pages/wikiore-natural-deportment) deportment comprised of [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical variability samples, bulk <b title=\"Run of mine\">ROM</b> samples and Pilot scale trials utilising protocols provided by CRC ORE.\n\nGeometallurgical testing[](#Geometallurgical_testing)\n-----------------------------------------------------\n\nA framework for selecting [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical samples was developed considering the different [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical units at [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine). A selection criterion was applied to all variability sampling which was based on <b title=\"Imprinting events on geology (e.g. faults, intrusions etc…).\">geological controls</b> likely to impact [metal deportment](/pages/wikiore-natural-deportment) response. The [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical characterization framework applied in sample selection was:\n\n*   [lithology](https://en.wikipedia.org/wiki/Lithology) (Primary <b title=\"Geological classification of material into discrete groups.\">rock type</b> )\n*   CuT (copper grade between 0.2% and 0.7% CuT)\n*   Primary vs Secondary (sulphate surface)\n*   Hardness\n*   Deleterious content (i.e. As)\n\nSamples were selected with a minimum of 35 samples per <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b> (except Andesite) with consideration of proportions of ores in the future Life of mine plan.\n\nA total of 229 <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> samples were selected from the site [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical testing program and analysed for preferential [metal deportment](/pages/wikiore-natural-deportment). In addition to the 229 samples, CRC ORE had conducted a phase of preliminary [grade by size](/pages/wikiore-natural-deportment) testing in Australia on samples which were originally sent as part of the [amira](https://amira.global/) P843A [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical Mapping and Mine Modelling project. These samples indicated that [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) did display an inherent [metal deportment](/pages/wikiore-natural-deportment) signature, however, they represented or that had already been mined. As a result, the phase 2 campaign focused on samples from 2017 to 2045 with the results utilised in the [concept study](/topics/grade-engineering-studies). The samples were collected in two phases:\n\n*   Phase 1 : 171 samples tested from <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> rejects of the [amira](https://amira.global/) GEM project\n*   Phase 2: 229 samples collected by Anglo American and tested.\n\nThe phase 2 samples were sieved into six <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s (+8 #, -8 # +12 #, -12 # +16 #, -16 # +30 #, -30 # +70 # and -70 #). Screening and [assay](https://en.wikipedia.org/wiki/Assay) work was conducted by SGS Laboratory in Santiago. Multi-element [assay](https://en.wikipedia.org/wiki/Assay)s were carried out using Atomic Absorption digest (AAS022D). The laboratory testing protocol is outline in Figure 1. All samples underwent a detailed <b title=\"Quality Assurance, Quality Control\">qa/qc</b> analysis to ensure that the mass distribution per <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b> was suitable for defining the [metal deportment](/pages/wikiore-natural-deportment) response. All samples passed the <b title=\"Quality Assurance, Quality Control\">qa/qc</b> analysis indicating that the sieve series applied was appropriate and there were no errors (e.g. holes in screens) during laboratory testing while screening.\n\n[![Figure 1:  Grade Engineering variability testing protocol on  geometallurgical samples.](https://res.cloudinary.com/shapeable/image/upload/v1687316136/wikiore/222.png \"Figure 1:  Grade Engineering variability testing protocol on  geometallurgical samples.\")](https://res.cloudinary.com/shapeable/image/upload/v1687316136/wikiore/222.png \"Figure 1:  Grade Engineering variability testing protocol on  geometallurgical samples.\")\n\nFigure 1: Grade Engineering variability testing protocol on geometallurgical samples.\n\n  \n[![Chapter7 Table1](https://res.cloudinary.com/shapeable/image/upload/v1687316138/wikiore/223.png)](https://res.cloudinary.com/shapeable/image/upload/v1687316138/wikiore/223.png)\n\nBulk Testing[](#Bulk_Testing)\n-----------------------------\n\nFour bulk samples corresponding to the most important <b title=\"Geological classification of material into discrete groups.\">rock type</b>s according to the mine plan were selected for natural [grade by size](/pages/wikiore-natural-deportment) characterisation (Table 1). Basically two <b title=\"Geological classification of material into discrete groups.\">rock type</b>s were characterised quartz monzonite (QM) and a combination of breccias consisted of mainly Breccia Central (BXC) and Breccia Occidental (BXO). In the end only M-601, M-602 and M-352 were tested. The macro-texture characterisation was conducted by the [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) geology team.\n\n| <b title=\"Geological classification of material into discrete groups.\">rock type</b>                                                | ID    |\n| -------------------------------------------------------- | ----- |\n| >95 %Quartz Monzonite (QM)                               | M-601 |\n| 80-90% Quartz Monzonite (QM), 20-10% Porphyry            | M-602 |\n| 80 %Breccia Central (BXC), 20 % Breccia Occidental (BXO) | M-351 |\n| 95 % Breccia Occidental (BXO)- 5% Breccia Central (BXC)  | M-352 |\n\nSamples were to prepare the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution of the <b title=\"Run of mine\">ROM</b> sample in order to mimic the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution (PSD) of primary [crushing](https://en.wikipedia.org/wiki/Crusher) product, i.e. 100 % passing 8” (~200 mm). This was conducted by manually screening the <b title=\"Run of mine\">ROM</b> material to recover the + 8” <b title=\"Individual rocks within discrete size fractions.\">particles </b> with subsequent [crushing](https://en.wikipedia.org/wiki/Crusher) (Figure 2) using a hydraulic hammer. This procedure ensures that [crushing](https://en.wikipedia.org/wiki/Crusher) does not produce an excess of <b title=\"Subjective term for the smaller sized component of feed\">fines</b> from over- [crushing](https://en.wikipedia.org/wiki/Crusher).\n\n[![Figure 2: Sampling program undertaken to obtain Bulk Samples from ROM.](https://res.cloudinary.com/shapeable/image/upload/v1687316139/wikiore/224.png \"Figure 2: Sampling program undertaken to obtain Bulk Samples from ROM.\")](https://res.cloudinary.com/shapeable/image/upload/v1687316139/wikiore/224.png \"Figure 2: Sampling program undertaken to obtain Bulk Samples from ROM.\")\n\nFigure 2: Sampling program undertaken to obtain Bulk Samples from ROM.\n\nIn order to increase the statistical confidence of [grade by size](/pages/wikiore-natural-deportment) characterisation and to understand the possible [grade by size](/pages/wikiore-natural-deportment) ranking variations at <b title=\"Trials run at or near the size required for an operation.\">production scale</b> , each <b title=\"Run of mine\">ROM</b> sample was divided into 3 [sub-sample](https://en.wikipedia.org/wiki/Sub-sampling_%28chemistry%29)s weighing around 4 tons (Figure 3). Two out of the three [sub-sample](https://en.wikipedia.org/wiki/Sub-sampling_%28chemistry%29)s were characterised for preferential [grade by size](/pages/wikiore-natural-deportment) deportment, while one [sub-sample](https://en.wikipedia.org/wiki/Sub-sampling_%28chemistry%29) was characterised for preferential [grade by size](/pages/wikiore-natural-deportment) deportment and progressively crushed in order to analyse the change in [grade by size](/pages/wikiore-natural-deportment) response at different PSDs.\n\n[![Figure 3: Splitting approach from 25t ROM sample into sub-samples.](https://res.cloudinary.com/shapeable/image/upload/v1687316142/wikiore/225.png \"Figure 3: Splitting approach from 25t ROM sample into sub-samples.\")](https://res.cloudinary.com/shapeable/image/upload/v1687316142/wikiore/225.png \"Figure 3: Splitting approach from 25t ROM sample into sub-samples.\")\n\nFigure 3: Splitting approach from 25t ROM sample into sub-samples.\n\n  \nEach split (~4 tons) was sieved into six <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s (Figure 4) with the aim to obtain an even mass distribution within each particle class to form a well-defined [grade by size](/pages/wikiore-natural-deportment) response (RR).\n\n[![Figure 4: Material handling methodology for each ~4.2t sample.](https://res.cloudinary.com/shapeable/image/upload/v1687316144/wikiore/226.png \"Figure 4: Material handling methodology for each ~4.2t sample.\")](https://res.cloudinary.com/shapeable/image/upload/v1687316144/wikiore/226.png \"Figure 4: Material handling methodology for each ~4.2t sample.\")\n\nFigure 4: Material handling methodology for each ~4.2t sample.\n\n  \nChemical [assay](https://en.wikipedia.org/wiki/Assay)s and significant repeats were taken at each <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b> (Anglo American Standards and inductively coupled plasma mass spectrometry [ICP-MS](https://en.wikipedia.org/wiki/Inductively_coupled_plasma_mass_spectrometry) testing protocols) which provided the opportunity of estimating interval confidence due to sampling uncertainty in the [grade by size](/pages/wikiore-natural-deportment) response. The results of the test work are summarised in Table 2.\n\nTable 2: Results from laboratory testing for two bulk sample.\n\n| **Sample** | **Specie** | **RR Average** | **CV** | **95 % Sup** | **95% Inf** |\n| ---------- | ---------- | -------------- | ------ | ------------ | ----------- |\n| Sample 1   | Cu         | 54             | 6.8    | 62           | 47          |\n| Sample 1   | Mo         | 82             | 6.6    | 93           | 77          |\n| Sample 4   | Cu         | 53             | 10.7   | 64           | 41          |\n| Sample 4   | Mo         | 80             | 6.6    | 91           | 75          |\n\n\nProgressive Crush Testing[](#Progressive_Crush_Testing)\n-------------------------------------------------------\n\nThe progressive [crushing](https://en.wikipedia.org/wiki/Crusher) test work measures the extent of change to the [grade by size](/pages/wikiore-natural-deportment) response due to variations in [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution. A clear example of this relationship is observed in other [metallurgical](https://en.wikipedia.org/wiki/Metallurgy) parameters like <b title=\"Resulting output of impact breakage testing.\">axb</b> (impact hardness) which depicts a clear dependency on the initial parent size. This testing program aimed to identify the optimal screening intervention point within the production chain. progressive [crushing](https://en.wikipedia.org/wiki/Crusher) test work at [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) consisted of three [crushing](https://en.wikipedia.org/wiki/Crusher) steps, seeking to dramatically change the initial parent top size (Figure 5). The initial sample with a top size of 8” was firstly reduced to 5” then 3” and finally 1 ½ ”. This requires the CSS to be dynamically changed to obtain the [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution required for each <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b> .\n\n[![Figure 5: Progressive Crush test methodology.](https://res.cloudinary.com/shapeable/image/upload/v1687316147/wikiore/227.png \"Figure 5: Progressive Crush test methodology.\")](https://res.cloudinary.com/shapeable/image/upload/v1687316147/wikiore/227.png \"Figure 5: Progressive Crush test methodology.\")\n\nFigure 5: Progressive Crush test methodology.\n\n  \nEach of the three samples showed that the [metal deportment](/pages/wikiore-natural-deportment) signature did not deviate with [particle size](https://en.wikipedia.org/wiki/Particle_size) distribution (Table 3). This indicates that there is no optimal <b title=\"Particle Size Distribution\">PSD</b> that has to be achieved to maximize [metal deportment](/pages/wikiore-natural-deportment) and the optimal <b title=\"Particle Size Distribution\">PSD</b> for operational impact can be utilised to exploit Preferential [grade by size](/pages/wikiore-natural-deportment) deportment.\n\nTable 3: [metal deportment](/pages/wikiore-natural-deportment) results from Progressive Crush Testing.\n\n| Cu [Response Ranking](/sub-topics/natural-deportment-characterisation) (RR) by Top Size (mm) | M-601 | M-602 | M-352 |\n| ------------------------------------------------------------ | ----- | ----- | ----- |\n| 200                                                          | 48    | 76    | 80    |\n| 125                                                          | 48    | 77    | 80    |\n| 75                                                           | 49    | 78    | 79    |\n| 37.5                                                         | 50    | 77    | 73    |\n| **Average**                                                  | 49    | 77    | 78    |\n| **[standard deviation](https://en.wikipedia.org/wiki/Standard_deviation)** | 1.0   | 0.8   | 3.4   |\n\n\nPilot Trials[](#Pilot_Trials)\n-----------------------------\n\nBased on the initial variability and bulk samples, it was determined that a Pilot Trial should be conducted to determine if the same magnitude response was evident at <b title=\"Trials run at or near the size required for an operation.\">production scale</b> . The mobile [screening plant](https://en.wikipedia.org/wiki/Mechanical_screening) was selected by site, with a contractor engaged to operate and manage the plant. Screening was conducted on day shift only working 5 days per week. <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> was considerably lower than predicted by site, with an average of 1,500 tonnes screened per day.\n\nThe trial comprised the installation of two mobile screen plants, two [excavator](https://en.wikipedia.org/wiki/Excavator)s and one front end [loader](https://en.wikipedia.org/wiki/Loader_%28equipment%29). <b title=\"Run of mine\">ROM</b> material was fed by an [excavator](https://en.wikipedia.org/wiki/Excavator) to a primary screen plant (Screen 1 in Figure 6) after passing a static [grizzly](https://en.wikipedia.org/wiki/Trommel_screen#Grizzly_screen) with an aperture of 6”. The [grizzly](https://en.wikipedia.org/wiki/Trommel_screen#Grizzly_screen) <b title=\"Material above a specific size (generally used to define material that is retained on a screen deck).\">oversize</b> material (+6” material) was transferred to a separate stockpile for further screening ( Screen 2) in order to reduce the probability of recovering finer <b title=\"Individual rocks within discrete size fractions.\">particles </b> which could bias the metal grade contained within the +6” <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>. This had the potential to jeopardize the [grade by size](/pages/wikiore-natural-deportment) industrial responses. The fine material produced in this second screening step was recycled to the <b title=\"Material entering a predetermined system.\">feed</b> allowing its recovery within the finer <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s. To ease material handling and reduce the material volume required to obtain a representative sample, the final +6” <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b> was crushed to a top size of approximately 4”.\n\n<b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> from the [grizzly](https://en.wikipedia.org/wiki/Trommel_screen#Grizzly_screen) was directly fed into the screening deck, with 3 products generated:\n\n*   6” to +3” <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>\n*   \\-3” to +1” <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>\n*   \\-1” <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>\n\n[![Figure 6: A schematic of the mobile plant layout](https://res.cloudinary.com/shapeable/image/upload/v1687316149/wikiore/228.png \"Figure 6: A schematic of the mobile plant layout\")](https://res.cloudinary.com/shapeable/image/upload/v1687316149/wikiore/228.png \"Figure 6: A schematic of the mobile plant layout\")\n\nFigure 6: A schematic of the mobile plant layout\n\nResults from the pilot trials are displayed in Table 4. All three trials showed strong [metal deportment](/pages/wikiore-natural-deportment) signatures. The first Preferential [grade by size](/pages/wikiore-natural-deportment) trial produced an RR number of 87, indicating that if the ore was screened at 1”, 27% of the material would pass to the <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b> (i.e. -1”) and have an upgrade of 1.7 times the <b title=\"Material entering a predetermined system.\">feed</b> grade containing 48% of the total metal. Assuming a <b title=\"A plant where ore is separated into concentrates and tails.\">concentrator</b> recovery of 85%, [leach](https://en.wikipedia.org/wiki/Leaching_%28metallurgy%29) recovery of 27% for <b title=\"Run of mine\">ROM</b> ore and a [leach](https://en.wikipedia.org/wiki/Leaching_%28metallurgy%29) recovery of 10% for screen <b title=\"Material above a specific size (generally used to define material that is retained on a screen deck).\">oversize</b>, the total copper production from the <b title=\"Individual levels within an open pit.\">bench</b> can be increased by 63.6% by applying [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) compared to sending the <b title=\"Run of mine\">ROM</b> ore directly to [dump leach](https://en.wikipedia.org/wiki/Heap_leaching).\n\n  \nTable 4: Results of Pilot Trial results\n\n| Pilot Test                                                   | <b title=\"Geological classification of material into discrete groups.\">rock type</b>           | Screened Mass (t) | Cu <b title=\"Material entering a predetermined system.\">feed</b> Grade (%) | % mass -1”    | Grade -1” | Contained Metal -1” Fraction (%) | % Mass +1”    | Grade +1” | Contained Metal +1” Fraction (%) | Effective RR |\n| ------------------------------------------------------------ | ------------------- | ----------------- | ----------------- | ------------- | --------- | -------------------------------- | ------------- | --------- | -------------------------------- | ------------ |\n| Preferential [grade by size](/pages/wikiore-natural-deportment) Trial | QZM- Secondary      | 33,000            | 0.26              | 27%           | 0.44      | 48                               | 73            | 0.19      | 52                               | 87           |\n| [differential blasting](/pages/wikiore-induced-deportment) Trial |                     | 9,600             | 0.32              |               |           |                                  |               |           |                                  |              |\n| High Energy Preferential [grade by size](/pages/wikiore-natural-deportment) Trial | BXD & BXC-Secondary | 5,100             | 0.70              | 30% <b title=\"Relative proportion of feed mass in the accept stream after preconcentration.\">mass pull</b> | 1.12      | 48                               | 70% <b title=\"Relative proportion of feed mass in the accept stream after preconcentration.\">mass pull</b> | 0.52      | 52                               | 78           |\n\n\nSpatial Analysis[](#Spatial_Analysis)\n-------------------------------------\n\nThe spatial analysis for [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) has been conducted in two phases, firstly assigning average [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) parameters to <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b> s and secondly via interpolation of [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) attributes into the [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model). A spatial analysis of [differential blasting](/pages/wikiore-induced-deportment) was conducted in the <b title=\"Life of Mine\">LOM</b> through <b title=\"Geological, statistical or spatial groupings used for modelling.\">domain</b>ing and [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) attribution and secondly via the analysis of the [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) <b title=\"Cylindrical hole used to load explosives into unbroken material.\">blast hole</b> dataset from 2012 to 2015. The results indicate that different regions of the deposit display different upgrading characteristics. In the North and Southern regions the [natural deportment](/pages/wikiore-natural-deportment) response is the greatest with the central zones showing good potential for applying [differential blasting](/pages/wikiore-induced-deportment) approaches supported by lower [natural deportment](/pages/wikiore-natural-deportment) response. The results indicate that the same upgrading strategy will not be utilised across the entire deposit, however, the [natural deportment](/pages/wikiore-natural-deportment) appears to be the dominant [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) lever adding value at [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine).\n\nFor [natural deportment](/pages/wikiore-natural-deportment), the RR numbers where modelled by the Anglo American geological team and modelled according to the same overarching principals as all [metallurgical](https://en.wikipedia.org/wiki/Metallurgy) variables. The current [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) interpolation provides an initial assessment at conceptual level; however further work is required during in-fill and future testing campaigns to improve the confidence in [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) attributes. Future work should also focus on obtaining a more detailed understanding of the <b title=\"Imprinting events on geology (e.g. faults, intrusions etc…).\">geological controls</b> on [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) attributes which can then be utilised for improved [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) [geomet](https://en.wikipedia.org/wiki/Geometallurgy)allurgical unit definition in future studies.\n\nFigure 7 overlay the copper [Response Ranking](/sub-topics/natural-deportment-characterisation) of the entire <b title=\"Cylindrical intact rock taken for geological and metallurgical characterisation.\">drill core</b> test program on the [ultimate pit](/sub-topics/ultimate-pit-and-pushbacks) of [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine), coloured by Cu RR. At this stage a detailed analysis of possible controls on RR yields has not been completed. This is pending receipt of geology, [lithology](https://en.wikipedia.org/wiki/Lithology) and alteration data files. Data has been coded by [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) attributes including <b title=\"Geological classification of material into discrete groups.\">rock type</b> and either “primary or secondary” utilizing the redox zone field. Primary material is largely a coherent and competent rock mass with anhydrite [vein](https://en.wikipedia.org/wiki/Vein_%28geology%29) material in-situ. The secondary zone is notably less competent with anhydrite veining [leach](https://en.wikipedia.org/wiki/Leaching_%28metallurgy%29)ed from the rock mass.\n\n[![Figure 7: Phase 1 & 2 drill core Cu RR results. View is looking to the North-West.  Block model  rock type superimposed through the Life of Mine pit indicating the 3 main rock types](https://res.cloudinary.com/shapeable/image/upload/v1687316150/wikiore/229.png \"Figure 7: Phase 1 & 2 drill core Cu RR results. View is looking to the North-West.  Block model  rock type superimposed through the Life of Mine pit indicating the 3 main rock types\")](https://res.cloudinary.com/shapeable/image/upload/v1687316150/wikiore/229.png \"Figure 7: Phase 1 & 2 drill core Cu RR results. View is looking to the North-West.  Block model  rock type superimposed through the Life of Mine pit indicating the 3 main rock types\")\n\nFigure 7: Phase 1 & 2 drill core Cu RR results. View is looking to the North-West. Block model rock type superimposed through the Life of Mine pit indicating the 3 main rock types\n\n  \n \n\nProcess Simulation[](#Process_Simulation)\n-----------------------------------------\n\nModelling and simulation have been used for the optimisation of minerals processing plants over the past 40 years, from the first [comminution](https://en.wikipedia.org/wiki/Comminution) models developed by the [JKMRC](https://smi.uq.edu.au/JKMRC) in the early 70’s to those models for the other processes of the [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain), i.e. <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b> and [flotation](https://en.wikipedia.org/wiki/Froth_flotation), continuously developed and improved over the past 55 years (McKee and Napier-Munn, 1990). However, simulating the impact of one process on the next downstream process, with the purpose of integrating processes, has traditionally been limited to use separate stand-alone software platforms.\n\nThe Integrated Extraction Simulator (IES), the next generation of cloud-based, powerful, reliable and accurate simulation of the entire an operation [value chain](https://en.wikipedia.org/wiki/Value_chain), has been developed from the combined research of CRC ORE and research associates ( [JKMRC](https://smi.uq.edu.au/JKMRC) and [amira](https://amira.global/)).  \nIES is a cloud-based simulation and optimisation platform designed to represent mine operation [value chain](https://en.wikipedia.org/wiki/Value_chain)s performance which integrates [drilling & blasting](https://en.wikipedia.org/wiki/Drilling_and_blasting), [crushing](https://en.wikipedia.org/wiki/Crusher), [grinding](https://en.wikipedia.org/wiki/Mill_%28grinding%29), [flotation](https://en.wikipedia.org/wiki/Froth_flotation), and other down the stream process and material handling units in a single platform (Carrasco et al. 2019). This provides mine managers with a cloud-based decision support platform that enables production units to coordinate and optimise system value across all operational metrics. This includes the [IES](https://www.crcore.org.au/ies) capabilities to handle multi-variable simulations across the [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) including [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) (GE) and <b title=\"Optimisation of fragmentation from blasting to comminution.\">mine-to-mill</b> ( <b title=\"Mine to Mill\">M2M</b> ). <b title=\"Grade Engineering\">GE</b> is an integrated approach developed by CRC ORE to early rejection of non-valuable material through pre-concentration techniques, leading to ore upgrades and reductions in processing costs. [GE simulations](/sub-topics/strategy-evaluation) can be conducted on ores with proven [natural deportment](/pages/wikiore-natural-deportment) (ND) of valuables to specific <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>s, and on those where this deportment can be further promoted through [differential blasting](/pages/wikiore-induced-deportment) (DB) techniques. The <b title=\"Materials response to a given preconcentration technology.\">amenability</b> of an ore to <b title=\"Grade Engineering\">GE</b> is determined by the ore-specific [Response Ranking](/sub-topics/natural-deportment-characterisation) (RR) parameter derived from the relationship between the cumulative <b title=\"Relative proportion of feed mass in the accept stream after preconcentration.\">mass pull</b> fractions and the resulting ore upgrades. <b title=\"Mine to Mill\">M2M</b> is a process integration approach to maximise productivity by evaluating the impact of <b title=\"Distribution of rock created through the application of explosives.\">blast fragmentation</b> on overall performance including <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> .\n\nThis study objectives are; establish a Baseline <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> of Confluencia and Las Tórtolas 2 <b title=\"General term for a collection of comminution/flotation equipment.\">circuit</b> of [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) operation and quantify opportunities suggested by prior consultant studies, validate the model with the historical data provided by Anglo American Company (AAC), identify actionable opportunities for improvement and design [Site Trial](/sub-topics/site-trials)s to quantify their economic value and utilise [IES](https://www.crcore.org.au/ies) to pursue the performance improvements in [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) and the other <b title=\"A plant where ore is separated into concentrates and tails.\">concentrator</b> s.\n\nMethodology[](#Methodology)\n---------------------------\n\n  \nThe methodology followed by CRC ORE, during the development of a [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> and subsequent simulation study, is summarised as follows:  \nData analysis - collating and cleaning relevant historical processing data available for each of the processes, splitting this historical processing data into 2 periods (fine tuning of the [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> and validation of the [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b>s).\n\n*   Identify [value chain](https://en.wikipedia.org/wiki/Value_chain) constrains.\n*   [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> development in [IES](https://www.crcore.org.au/ies) to include all production units along the [value chain](https://en.wikipedia.org/wiki/Value_chain).\n*   Transfer all the individual process models to IES.\n*   Fine tune the preliminary [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> using the designated data set.\n*   Validate the integrated [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> using the validation data set.\n*   Define the type of simulations and their scenarios.\n*   Adapt the <b title=\"A specific design within IES or a given circuit configuration.\">flowsheet</b> to be used for the given simulations.\n*   Define the scenarios for each type of simulation, i.e. the combinations of:\n*   Blast intensities and pre-concentration <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b>s, for [GE simulations](/sub-topics/strategy-evaluation).\n*   Blast intensities and target <b title=\"Target product size post grind.\">grind size</b>, for <b title=\"Mine to Mill\">M2M</b> simulations.\n*   Select the blocks for each scenario.\n*   Set up the <b title=\"IES specific term for repeated simulations within a section of a circuit.\">in-line optimiser</b> in [IES](https://www.crcore.org.au/ies) for each type of simulation, to account for the action taken by plant operators to maintain product specifications when dealing with different <b title=\"General properties of rock (grade, hardness, grain size etc…).\">ore characteristics</b> .\n*   Include the [value chain](https://en.wikipedia.org/wiki/Value_chain) constraints in the Optimiser logic.\n\nFigure 8 summarises the workflow to develop and mass simulate the given scenarios.\n\n[![Figure 8: IES Implementation Methodology Flowchart](https://res.cloudinary.com/shapeable/image/upload/v1687316156/wikiore/230.png \"Figure 8: IES Implementation Methodology Flowchart\")](https://res.cloudinary.com/shapeable/image/upload/v1687316156/wikiore/230.png \"Figure 8: IES Implementation Methodology Flowchart\")\n\nFigure 8: IES Implementation Methodology Flowchart\n\nSIMULATIONS[](#SIMULATIONS)\n---------------------------\n\nIES has the capabilities to conduct simulations across the entire [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) for a range of <b title=\"General term for equipment performance parameters.\">operating conditions</b> and <b title=\"General properties of rock (grade, hardness, grain size etc…).\">ore characteristics</b> . For the [Los Bronces](https://en.wikipedia.org/wiki/Los_Bronces_mine) study, [IES](https://www.crcore.org.au/ies) simulations were conducted covering the following scenarios:\n\n*   <b title=\"Selected benchmark for comparison to.\">base case</b>\n*   [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) (GE):\n    *   [natural deportment](/pages/wikiore-natural-deportment) (ND)\n    *   [differential blasting](/pages/wikiore-induced-deportment) (DB)\n*   <b title=\"Optimisation of fragmentation from blasting to comminution.\">mine-to-mill</b> ( <b title=\"Mine to Mill\">M2M</b> )\n\n[![Figure 9: All GE and M2M scenarios simulated](https://res.cloudinary.com/shapeable/image/upload/v1687316158/wikiore/231.png \"Figure 9: All GE and M2M scenarios simulated\")](https://res.cloudinary.com/shapeable/image/upload/v1687316158/wikiore/231.png \"Figure 9: All GE and M2M scenarios simulated\")\n\nFigure 9: All GE and M2M scenarios simulated\n\nSimulations in [IES](https://www.crcore.org.au/ies) require the setup of the Optimiser functionality to run in-line with the simulations to represent the action taken by plant operators to accommodate the changes in hardness and size of the fresh <b title=\"Material entering a predetermined system.\">feed</b> , while maintaining final product specifications and a stable operation as much as possible. Also, it applies the constraints along the [value chain](https://en.wikipedia.org/wiki/Value_chain) acquired from the process information analysis into the simulations and make sure the equipment capacity is not over predicted along the [value chain](https://en.wikipedia.org/wiki/Value_chain). The Goal in the Optimiser is typically to maximise the operation ‘ <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> ’ by keeping all the variation within the constraints.\n\n  \n \n\nBase Case (BC)[](#Base_Case_BC_)\n--------------------------------\n\nA <b title=\"Selected benchmark for comparison to.\">base case</b> scenario simulation was performed for each <b title=\"A spatially constrained unit within the resource model.\">block</b> in the [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model). This scenario was used as a reference point for comparing the results of other scenarios to identify the impact of <b title=\"Mine to Mill\">M2M</b>, <b title=\"Grade Engineering\">GE</b> ND, and GE <b title=\"Differential Blasting\">DB</b> to the “current operating condition”. The simulated conditions were:\n\n*   1 x Direct <b title=\"Material entering a predetermined system.\">feed</b> fragmentation: Medium size distribution\n*   1 x <b title=\"Target product size post grind.\">grind size</b> : [cyclone](https://en.wikipedia.org/wiki/Hydrocyclone) overflow <b title=\"80% passing size in product material.\">p80</b> 210µm\n\nMine to Mill (M2M)[](#Mine_to_Mill_M2M_)\n----------------------------------------\n\nThese scenarios assessed the impact of varying plant <b title=\"Material entering a predetermined system.\">feed</b> size distribution as the results of different blast intensities along with targeting different <b title=\"Target product size post grind.\">grind size</b> distributions (12 scenarios). Three direct <b title=\"Material entering a predetermined system.\">feed</b> fragmentations and 4 grind <b title=\"Resulting material size post comminution stage.\">product size</b>s (same for all blocks) proposed by Anglo American were used. The simulated conditions were:\n\n*   3 x Direct <b title=\"Material entering a predetermined system.\">feed</b> fragmentations: Medium, Fine and Extra fine size distributions\n*   4 x <b title=\"Target product size post grind.\">grind size</b>s: [cyclone](https://en.wikipedia.org/wiki/Hydrocyclone) overflow <b title=\"80% passing size in product material.\">p80</b> 150µm, 180µm, 210µm and 240µm\n\nGE - [natural deportment](/pages/wikiore-natural-deportment) (ND)[](#GE_-_natural_deportment_ND_)\n-------------------------------------------------------------------------------------------------\n\nGE [natural deportment](/pages/wikiore-natural-deportment) is a process that is applied to the ore that one of the main minerals ( [gangue](https://en.wikipedia.org/wiki/Gangue) or valuable) has the tendency to deport into a specific <b title=\"Classified material based on specific size constraints (i.e. two specific sizes).\">size fraction</b>. [GE simulations](/sub-topics/strategy-evaluation) are conducted on those blocks in the [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) with proven [natural deportment](/pages/wikiore-natural-deportment) capability, as indicated by their response to the [ND](/pages/wikiore-natural-deportment) process which was distributed into the [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model). Overall [mine value chain](https://www.energymining.sa.gov.au/industry/minerals-and-mining/invest/minerals-industry-value-chain) performance including <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> and ore upgrade for all combinations of three blast intensities and three pre-concentration <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> s. Each combination leads to a <b title=\"Relative proportion of feed mass in the accept stream after preconcentration.\">mass pull</b> fraction to screen <b title=\"Material below an specified size (generally used to define material that falls through a screen deck).\">undersize</b>, and thus to a SAG <b title=\"Material entering a predetermined system.\">feed</b> size distribution with truncated top size, resulting on increased <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> , reduced SAG power and, more importantly, an ore upgrade that is reflected in the mass of metal produced in the <b title=\"Product generally produced by metal ore mines.\">concentrate</b> . The <b title=\"Grade Engineering\">GE</b> [ND](/pages/wikiore-natural-deportment) simulations conditions were:\n\n*   1 x Direct <b title=\"Material entering a predetermined system.\">feed</b> fragmentation: Medium\n*   3 x <b title=\"Grade Engineering\">GE</b> <b title=\"Material entering a predetermined system.\">feed</b> fragmentation: Medium, Fine and Extra Fine\n*   1 x <b title=\"Target product size post grind.\">grind size</b> : [cyclone](https://en.wikipedia.org/wiki/Hydrocyclone) overflow <b title=\"80% passing size in product material.\">p80</b> 210µm\n*   3 x <b title=\"Grade Engineering\">GE</b> <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> size: 31.7mm, 57mm and 75mm\n\nGE – [differential blasting](/pages/wikiore-induced-deportment) (DB)[](#GE_differential_blasting_DB_)\n-----------------------------------------------------------------------------------------------------\n\n[differential blasting](/pages/wikiore-induced-deportment) involves a preferential concentration of explosive energy on the high-grade zones on those ores with proven natural [metal deportment](/pages/wikiore-natural-deportment), where further [metal deportment](/pages/wikiore-natural-deportment) can be promoted and thus greater ore upgrades. Therefore, a second pass <b title=\"Grade Engineering\">GE</b> simulation is conducted on these selected ores, this time using <b title=\"Differential Blasting\">DB</b> techniques with the Medium <b title=\"Run of mine\">ROM</b> size as the basis. The GE <b title=\"Differential Blasting\">DB</b> simulations conditions were:\n\n*   1 x Direct <b title=\"Material entering a predetermined system.\">feed</b> fragmentation: Medium\n*   1 x <b title=\"Grade Engineering\">GE</b> <b title=\"Material entering a predetermined system.\">feed</b> fragmentation: Medium (low grade) mixed with Fine (high grade)\n*   1 x <b title=\"Target product size post grind.\">grind size</b> : [cyclone](https://en.wikipedia.org/wiki/Hydrocyclone) overflow <b title=\"80% passing size in product material.\">p80</b> 210µm\n*   3 x <b title=\"Grade Engineering\">GE</b> <b title=\"Minimum dimension at which material will be retained as oversize.\">screen aperture</b> size: 31.7mm, 57mm and 75mm\n\nDiscussion[](#Discussion)\n-------------------------\n\nTo avoid running unnecessary simulations, the <b title=\"Materials response to a given preconcentration technology.\">amenability</b> of each <b title=\"A spatially constrained unit within the resource model.\">block</b> being treated at the mill and/or [screening plant](https://en.wikipedia.org/wiki/Mechanical_screening) for [differential blasting](/pages/wikiore-induced-deportment) and [natural deportment](/pages/wikiore-natural-deportment) was assessed. Favourable <b title=\"Inputs used for business case evaluations.\">economic assumptions</b> were used to determine the value of each <b title=\"A spatially constrained unit within the resource model.\">block</b> and its eligibility to be included in each set of simulations. Eliminating the unnecessary simulations reduce the number of simulations down to 14 million. This assessment determined the value of each <b title=\"A spatially constrained unit within the resource model.\">block</b> if treated at the mill or through each screening option and flagged each <b title=\"A spatially constrained unit within the resource model.\">block</b> that returned a positive value under each of these conditions. Each <b title=\"A spatially constrained unit within the resource model.\">block</b> that was flagged then entered the simulations. 759,605 blocks were used in the BC scenario. This is the first time, a huge number of simulations is being conducted for the whole [value chain](https://en.wikipedia.org/wiki/Value_chain) in one single simulation, in an acceptable period of time, one week, and the results actually was used in an economic evaluation by a resource company’s planning and strategy group (CRC ORE participant, Anglo American). Three main KPIs – <b title=\"Metric for overall tonnage moving through a system within a  specified time.\">throughput</b> , copper and molybdenum recoveries – were reported and written back into the [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) for each scenario. The planning and strategy group assess the initial assumption made as well as the economical indexes calculated for the extracted KPIs from [IES](https://www.crcore.org.au/ies) for the given scenarios above. If the scenario is “valid” meaning the mine plan can be executed in real life. Example of a valid scenario includes but not limited to, enough <b title=\"Grade Engineering\">GE</b> material can be mined in pit to <b title=\"Material entering a predetermined system.\">feed</b> the plant continuously at the given rate and the nominated <b title=\"The planned progression of mining within an ultimate pit.\">pushback</b> are exposed and can be physically mined with minimum ramp preparation and equipment relocations at the assumed rate.\n\n[![Figure 10: The KPIs of interest written back into the block model](https://res.cloudinary.com/shapeable/image/upload/v1687316160/wikiore/232.png \"Figure 10: The KPIs of interest written back into the block model\")](https://res.cloudinary.com/shapeable/image/upload/v1687316160/wikiore/232.png \"Figure 10: The KPIs of interest written back into the block model\")\n\nFigure 10: The KPIs of interest written back into the block model\n\nAnother raw and quick evaluation could be done by using the KPIs only. A ratio of the production rate for any of the scenarios to the <b title=\"Selected benchmark for comparison to.\">base case</b> scenario calculated and written back to the [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model) that contains the <b title=\"A spatially constrained unit within the resource model.\">block</b> coordinates. Therefore, the values could be plotted in 3D format that easily show in which area of the resource this scenario, effectively increases the production. For example, in 11 the areas coloured in red generate significant value (above 20% increase) by applying the given scenario showing the risk to apply that scenario and obtain value is very low. In contrast the areas in blue may generate value (up to 5%) but the risk is very high. The operation manager or mine planner can use the information to find out when and where the scenario can be applied and generate value at lower level of risk.\n\n  \n \n\n[![Figure 11: Production rate of a given scenario to base case.](https://res.cloudinary.com/shapeable/image/upload/v1687316162/wikiore/233.png \"Figure 11: Production rate of a given scenario to base case.\")](https://res.cloudinary.com/shapeable/image/upload/v1687316162/wikiore/233.png \"Figure 11: Production rate of a given scenario to base case.\")\n\nFigure 11: Production rate of a given scenario to base case.\n\nConclusions[](#Conclusions)\n===========================\n\nThe work presented in this paper outlines a detailed process of evaluating pre-concentration from characterisation to [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model)ling and process simulation. The outputs of this work can <b title=\"Material entering a predetermined system.\">feed</b> into mine planning and scenario analysis studies to determine optimal pre-concentration scenarios and assess identified pre-concentration options against other technologies. The work presented in this paper presents the first published integrated study of [Grade Engineering](/pages/wikiore-introduction-to-grade-engineering) and [IES](https://www.crcore.org.au/ies) to produce a fully attributed resource [block model](https://en.wikipedia.org/wiki/Mineral_resource_estimation#Resource_block_model)."},"organisations":[],"embeds":{"citations":[],"imageAssets":[]},"video":null,"banner":null,"fileAssets":[],"citations":[],"feedEntries":[],"posts":[],"moderators":[]}}},"pageContext":{"lang":{"id":"en","path":"","iso":"en","name":"English","label":"English"},"availableEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend","OrganisationType","HorizonType","Economy","FeedEntry","Video","Citation","Objective","ProfileType","ExpertiseLevel"],"detailEntities":["Catalyst","CommodityGroup","Innovation","Organisation","Page","Person","Post","SubTopic","Topic","Trend"],"site":{"id":"65d2edd1ebf7bb9388ffb0df","slug":"connect-ore","name":"ConnectOre","url":"https://connectore.org","title":"ConnectOre","twitter":null,"threads":null,"facebook":null,"linkedin":null,"instagram":null,"flickr":null,"tiktok":null,"youtube":null,"ownerName":"ICAA","recaptchaKey":"6LfG2J0qAAAAAHDCFfJnrWOj6DiWJGik5BAa_7p8","googleSiteVerification":null,"platformName":"ConnectOre","platformUrl":"https://platform.connectore.org","supportEmail":null,"contactEmail":null,"mainMenu":{"id":"65d2edaaebf7bb9388ffaf79","slug":"website-navigation"},"linearMenu":null,"entityViews":[{"id":"67528c24c135ebcfc668f1ba_65d2edd1ebf7bb9388ffb0df","name":"Value Chain","hash":"value-chain","label":null,"slug":"value-chain","count":0,"showCount":null,"disabled":null,"icon":{"id":"6752a61b8b51dfa7b77b1e37","name":"Connections Navigator Icon Glyph","slug":"connections-navigator-icon-glyph","component":"ConnectionsNavigatorIconGlyph"},"childEntityTypes":[{"id":"6667fa4ff794dd6e045135c1","name":"Value Chain Theme","internalName":"Trend"},{"id":"6667fa58f794dd6e045135c6","name":"Topic","internalName":"Topic"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"6757ef1ede8adbd45cf19474_65d2edd1ebf7bb9388ffb0df","name":"Bulletin Board","hash":"bulletin-board","label":null,"slug":"bulletin-board","count":0,"showCount":null,"disabled":null,"icon":{"id":"681c2cebbccc5a72d8382f31","name":"Tag Icon","slug":"tag-icon","component":"TagDotIconGlyph"},"childEntityTypes":[],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528d88c135ebcfc668f31b_65d2edd1ebf7bb9388ffb0df","name":"Innovations","hash":"innovations","label":null,"slug":"innovations","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528d74c135ebcfc668f315","name":"Innovation","internalName":"innovation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67625640fbc7c50d8644c592_65d2edd1ebf7bb9388ffb0df","name":"Community","hash":"community","label":null,"slug":"community","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"67528404c135ebcfc668ee1c","name":"Person","internalName":"Person"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67528e1bc135ebcfc668f33a_65d2edd1ebf7bb9388ffb0df","name":"Stakeholder Map","hash":"stakeholder-map","label":null,"slug":"stakeholder-map","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"66680141f794dd6e0451367a","name":"Organisation","internalName":"Organisation"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]},{"id":"67529040c135ebcfc668f4ae_65d2edd1ebf7bb9388ffb0df","name":"References","hash":"references","label":null,"slug":"references","count":0,"showCount":null,"disabled":null,"icon":{"id":"67528cddc135ebcfc668f304","name":"Grid Icon Glyph","slug":"grid-icon-glyph","component":"GridIconGlyph"},"childEntityTypes":[{"id":"6752902fc135ebcfc668f4a4","name":"Article","internalName":"FeedEntry"},{"id":"67529039c135ebcfc668f4aa","name":"Citation","internalName":"Citation"},{"id":"67528de9c135ebcfc668f328","name":"Catalyst","internalName":"catalyst"},{"id":"67528df9c135ebcfc668f32d","name":"Page","internalName":"page"}],"type":{"id":"67528b63c135ebcfc668f19c","name":"Explorer","slug":"explorer"},"slices":[]}],"entityAppViews":[],"entityOnboardingViews":[{"id":"680c3a4ebc80e4d0f3cfa2ef_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Step","hash":"trend-expertise-step","label":null,"slug":"trend-expertise-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df","name":"Trend Expertise Onboarding Grid","slug":"trend-expertise-onboarding-grid","label":null,"updated":"2025-04-26T01:42:10.20","layout":{"id":"680c3993bc80e4d0f3cfa2dd","name":"Slice Onboarding Trend Expertise Grid","slug":"slice-onboarding-trend-expertise-grid","component":"SliceLayoutOnboardingTrendExpertiseGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":null,"titleRich":{"id":"680c39f2bc80e4d0f3cfa2e0_65d2edd1ebf7bb9388ffb0df_titleRich","text":"Are you **an industry expert** in any of these Value Chain Themes?"}}]},{"id":"680c3a85bc80e4d0f3cfa2fa_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Step","hash":"profile-types-step","label":null,"slug":"profile-types-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df","name":"Profile Types Onboarding Grid","slug":"profile-types-onboarding-grid","label":null,"updated":"2025-04-26T01:44:34.63","layout":{"id":"680c3a13bc80e4d0f3cfa2e4","name":"Slice Onboarding Profile Types Grid","slug":"slice-onboarding-profile-types-grid","component":"SliceLayoutOnboardingProfileTypesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"Which best describes you?","titleRich":{"id":"680c3a82bc80e4d0f3cfa2f7_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]},{"id":"680c3aaabc80e4d0f3cfa2ff_65d2edd1ebf7bb9388ffb0df","name":"Objectives Step","hash":"objectives-step","label":null,"slug":"objectives-step","count":0,"showCount":null,"icon":null,"childEntityTypes":[],"type":{"id":"680c394fbc80e4d0f3cfa2d8","name":"Onboarding","slug":"onboarding"},"slices":[{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df","name":"Objectives Onboarding Grid","slug":"objectives-onboarding-grid","label":null,"updated":"2025-04-26T01:45:12.76","layout":{"id":"680c3a3fbc80e4d0f3cfa2ea","name":"Slice Onboarding Objectives Grid","slug":"slice-onboarding-objectives-grid","component":"SliceLayoutOnboardingObjectivesGrid"},"connectedEntities":[],"headerFontType":null,"pretitle":null,"pretitleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_pretitleRich","text":""},"title":"What are your priority objectives?","titleRich":{"id":"680c3aa8bc80e4d0f3cfa2fc_65d2edd1ebf7bb9388ffb0df_titleRich","text":""}}]}],"gptLanguages":[{"id":"65d2eda5ebf7bb9388ffaf1f","name":"English","slug":"english","iso":"en","locale":"en_US","path":"/en","label":"English","menuLabel":null},{"id":"666f70b6e051ad9ef086d1be","name":"Arabic","slug":"arabic","iso":"ar","locale":"ar_AE","path":"/ar","label":"عربي","menuLabel":null},{"id":"666f7161e051ad9ef086d1c4","name":"Spanish","slug":"spanish","iso":"es","locale":"es_ES","path":"/es","label":"español","menuLabel":null},{"id":"666f71c9e051ad9ef086d1c8","name":"German","slug":"german","iso":"de","locale":"de_DE","path":"/de","label":"Deutsch","menuLabel":null},{"id":"65d2eda5ebf7bb9388ffaf20","name":"French","slug":"french","iso":"fr","locale":"fr_FR","path":"/fr","label":"Français","menuLabel":null}],"gptQuestionTemplate":{"id":"662c7f6e81ef1920e3638518","name":"Standard Open Question","slug":"standard-open-question","path":"/prompt-templates/standard-open-question","__typename":"PromptTemplate","_entityTypeName":null,"label":"CopperAI","type":{"id":"662c7f1981ef1920e363850f","name":"Ask","slug":"ask"},"description":{"text":"This template is tailored for providing accurate responses based on specific context. It integrates contextual details from \"contextual information\" and addresses the \"target question\". The response is always in English, prioritizing clarity. If the answer is unknown, the template openly acknowledges this, ensuring honesty and avoiding speculation. This format is ideal for precise, context-sensitive, and truthful answering."},"summary":{"text":"Ask a general question about Website content"},"gptModel":{"id":"67564c4f2f6749787d0e03dc","name":"OpenAI GPT 4o","slug":"open-ai-gpt-4-o","dataSetId":"openai:gpt-4o"},"variablesPrompt":{"text":""},"submitLabel":"Ask","languages":[],"icon":{"id":"67528b9cc135ebcfc668f1a3","name":"AI Lower Case Icon Glyph","slug":"ai-lower-case-icon-glyph","component":"AiLowerCaseIconGlyph"},"variables":[{"id":"6668076bf794dd6e045138d9","name":"question","slug":"question","useVectorStore":true,"label":"What would you like to know?","labelAnother":null,"help":{"text":""},"options":{"text":""},"defaultValue":null,"entityTypes":[],"controlType":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"},"labelContextual":null,"labelAnotherContextual":null,"helpContextual":{"text":""},"optionsContextual":{"text":""},"defaultValueContextual":null,"entityTypesContextual":[],"controlTypeContextual":{"id":"6667ff19f794dd6e04513656","name":"Textarea","slug":"textarea"}}]},"advertisements":[],"logoVerticalOffset":null,"logoHorizontalOffset":null,"logoVerticalOffsetMobile":null,"logoHorizontalOffsetMobile":null,"logoVerticalOffsetTablet":null,"logoHorizontalOffsetTablet":null,"logoVerticalOffsetDesktop":null,"logoHorizontalOffsetDesktop":null,"logoHeightMobile":44,"logoHeightTablet":null,"logoHeightDesktop":null,"headerHeightMobile":null,"headerHeightTablet":null,"headerHeightDesktop":null,"logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807465/copper-connect/site/copper-connect_logo__CopperOre_Master_Brand_Identity-colour_cd4vgg.webp","type":"image/webp","width":945,"height":266},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1738807452/copper-connect/site/copper-connect_logoInverted__CopperOre_Master_Brand_Identity-white_chnucx.webp","type":"image/webp","width":945,"height":266},"footerMenu":null,"footerSecondaryMenu":null,"footerContent":{"text":"© {year} ConnectOre. All Rights Reserved\n"},"creator":null,"poweredBy":{"id":"65d2edadebf7bb9388ffafc8","name":"Shapeable","slug":"shapeable","url":"https://shapeable.ai","logo":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1674010034/platform/organisation/shapeable_logo__shapeable.png","type":"image/png","width":1174,"height":368},"logoInverted":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1729474494/copper-connect/organisation/shapeable_logoInverted__shapeable-logo-inverted_sdcfpk.png","type":"image/png","width":392,"height":118},"logoSubtle":null},"poweredByLabel":null,"poweredByContent":{"text":""},"explorerPage":{"name":"Explorer","title":null,"slug":"explorer","path":"/explorer"},"termsPage":{"name":"Terms of Use","title":null,"slug":"terms-of-use","path":"/terms-of-use"},"homePage":null,"knowledgeHubPage":{"name":"News","title":null,"slug":"news","path":"/news"},"privacyPolicyPage":{"name":"Privacy Policy","title":null,"slug":"privacy-policy","path":"/privacy-policy"},"summary":{"text":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action"},"thumbnail":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"},"openGraph":{"title":"ConnectOre","date":"2026-07-31T04:44:47.80","description":{"plain":"A platform to accelerate industry-wide innovation through collective intelligence and collaborative action\n"},"image":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png","type":"image/png","thumbnails":{"full":{"url":"https://res.cloudinary.com/shapeable/image/upload/v1713942350/copper-connect/site/copper-connect_thumbnail__site-thumb_bmicl8.png"}}}},"termsAndConditions":{"text":""},"privacyPolicy":{"text":"At ConnectOre we respect your privacy. We want to ensure that you get the information, content, and experiences that matter most to you. ConnectOre is committed to protecting the privacy of its stakeholders, communities, and other contacts.\n\n## Scope\n\nThis privacy policy applies to all personal data processed by full-time and part-time employees, volunteers when acting on behalf of ConnectOre contractors and partners doing business on behalf of ConnectOre, as well as all legal entities, all operating locations in all countries, and all business processes conducted by ConnectOre.\n\n## Information Collected\n\n#### What information do we collect?\n\nConnectOre collects the following personal data in line with the use purposes explained in a subsequent section:\n\n  * Your name and contact details\n  * Online profile data/usage\n  * Contact information\n  * Social media profile information\n  * Education and professional information\n  * Registration and participation in ConnectOre events and activities \n  * Information about service usage\n  * Cookies\n  * Authentication data\n  * Location information\n  * Author and peer review information\n  * Other information you upload or provide to us\n\n#### How do we use your information?\n\nConnectOre uses (and, where specified, shares) your personal information for the following purposes:\n\n  * To provide support or other services. ConnectOre may use your personal information to provide you with support or other services that you have ordered or requested. ConnectOre may also use your personal information to respond directly to your requests for information, including registrations for webinars, or other specific requests, or pass your contact information to the appropriate ConnectOre supplier or reseller for further follow-up related to your interests.\n  * To provide information based on your needs and respond to your requests. ConnectOre may use your personal information to provide you with notices of new product releases and service developments.\n  * To administer products. ConnectOre may contact you if you make use of (digital) products we offer, to confirm certain information (for example, that you did not experience problems in a download process). We may also use this information to confirm compliance with licensing and other terms of use and may share it with your company/institution.\n  * To assist in your participation in ConnectOre activities. ConnectOre will communicate with you, if you are participating in certain ConnectOre activities such as ConnectOre Summit, authoring or reviewing a ConnectOre article, or ConnectOre humanitarian activities. ConnectOre may send you information such as update messages related to those activities (such as but not limited to the event's content, and event logistics)\n  * To update you on relevant ConnectOre events and opportunities. ConnectOre may communicate with you regarding relevant ConnectOre events and opportunities.\n  * To protect ConnectOre content and services. We may use your information to prevent potentially illegal activities and to enforce our terms and conditions.\n  * To get feedback or input from you. In order to deliver products and services of most interest to our stakeholders, from time to time, we may ask you to provide us input and feedback (for example through surveys).\n\n#### How can you control your information?\n\nYou can control the information we have about you and how we use as follows:\n\n  * If you are a registered guest for ConnectOre Annual Summit 2021, any request for review, revise or correction of your personal data can be sent to john.fennell@copper.com.au specifying your request.\n\n#### Personal data about minors and children\n\nConnectOre does not knowingly collect data from or about children under 16 without the permission of parent(s)/guardian(s). If we learn that we have collected personal information from a child under 16, we will delete that information as quickly as possible. If you believe that we might have any information from or about a child under age 16, please contact us.\n\n#### How will you know if the Privacy Policy is changed?\n\nConnectOre may update its Privacy Policy from time to time. If we make any material changes you will be notified by means of a notice on our website prior on the date the change becomes effective. We encourage you to periodically review this page for the latest information on our privacy practices.\n\n## Technical And Regulatory Information\n\n#### Logging practices\n\nConnectOre automatically records the Internet Protocol (IP) addresses of visitors. The IP address is a unique number assigned to every computer on the internet. Generally, an IP address changes each time you connect to the internet (it is a \"dynamic\" address). Note, however, that if you have a broadband connection, depending on your individual circumstance, the IP address that we collect may contain information that could be deemed identifiable. This is because, with some broadband connections, your IP address doesn't change (it is \"static\") and could be associated with your personal computer.\n\nAs well as recording the IP addresses of users, ConnectOre may also keep track of sites that users visited immediately prior to visiting ConnectOre's website and the search terms they used to find it. We keep track of the pages visited on ConnectOre's website, the amount of time spent on those pages and the types of searches done on them. Your searches remain confidential and anonymous. ConnectOre uses this information only for statistical purposes to find out which pages users find most useful and to improve the website.\nConnectOre also captures and stores information that you transmit. This may include:\n\n  * Browser/Device type/version\n  * Operating system used\n  * Media Access Control (MAC) address\n  * Date and time of the server request\n  * Volume of data transferred\n\n#### External links behaviour\n\nSome of the links on ConnectOre's websites link to other sites created and maintained by other public- and/or private-sector organizations. ConnectOre provides these links solely for your information and convenience. When you transfer to an outside website, you are leaving ConnectOre domain, and ConnectOre's information management policies no longer apply. ConnectOre encourages you to read the privacy statement of each external website that you visit before you provide any personal data.\n\n#### Cookies and web beacons\n\nCookies and web beacons are electronic placeholders that are placed on your device by websites to track your individual movements on that website over time. ConnectOre uses both session-based cookies (which last only for the duration of the user's session) and persistent cookies (which remain on your device and provide information about the session you are in and waits for the next time you use that site again).\n\nThese cookies and web beacons provide useful information to ConnectOre, enabling us to recognize repeat users, facilitate the user's access to and use of our sites, allows us to track usage behavior, and to balance the usage of our websites on all ConnectOre web servers.\nTracking cookies, third-party cookies, and other technologies such as web beacons may be used to process additional information, enable non-core functionalities on ConnectOre website and enable third-party functions (such as a social media \"share\" link). We may also include web beacons and other similar technology in promotional email messages to determine whether the messages have been opened.\n\n#### Do Not Track (DNT)\n\nThe online advertising industry has self-regulatory initiatives designed to provide consumers a choice in the types of ads they may see online and to conveniently opt-out from online behavioral ads served by some or all of the companies participating in these programs. Our websites do not respond to DNT consumer browser settings.\n\n#### Responses to legal requests\n\nConnectOre reserves the right to share your information to respond to duly authorized information requests of governmental authorities or where required by law.\n\n#### Your data rights\n\nConnectOre complies with all applicable data privacy laws and regulations including, but not limited to, the General Data Protection Regulation (GDPR) and the California Consumer Privacy Act (CCPA). Under these laws and regulations, you may have certain rights to your data. Should you wish to exercise any of these rights, please send an email request to john.fennell@copper.com.au with \"Data Privacy Request'' in the subject line and in the email please identify the specific privacy right you request assistance with. Please note additional information may be requested prior to fulfilling a request and that ConnectOre reserves the right to charge a fee, where permitted, to cover the cost of certain requests.\n\n#### How do I contact you if there is an issue?\nIf you have any questions or concerns about this Privacy Policy or about the use of your personal information, please feel free to contact us by email at john.fennell@copper.com.au"},"welcomeUrl":"https://connectore.org/app/welcome","welcomeTitle":"Welcome to ConnectOre and thanks for joining us! ","invitationAction":"join the ConnectOre community","setupCompletionMessage":null,"languages":[],"brandColors":[],"showLogin":true,"showShareMenu":null,"showFollowMenu":true,"showPlatformLogin":null,"showContactUs":null,"loginLabel":"Explorer Login","platformLoginLabel":"Community Platform","headerButtons":[]},"includeProfile":true,"disableProfileEditing":false,"dynamicEntityTypeNames":["Person","Organisation"],"profilePath":"/app/profile","welcomePath":"/app/welcome","id":"676356b0cc7194b0ec39485b","slug":"ge-in-ies-case-study","entityPath":"/sub-topics/ge-in-ies-case-study","openGraph":{},"entityTypeName":"SubTopic","name":"GE in IES Case Study","updated":"2024-12-20T03:49:44.64","__type":"SubTopic"}},
    "staticQueryHashes": ["1044227382","1158597448","1242646999","1427075558","1452322194","1520036161","1545705019","1586309863","1606754935","1816168740","1864381666","1903214493","1945056504","1989845544","2034981229","2181044613","2409034939","2463401854","2526615987","2642656775","2862279633","2867243664","2910164142","2912920178","296816903","3073584486","3150399266","3172506128","3320076387","3447680494","3453148481","3624873332","364221563","3692255024","3778988535","3782604890","4091857177","4216505212","591477963","701411134","758936535","80004486","857137463","881103158"]}